One great thing about these new wing coasters is that they are quite easily to theme to just about anything. Love the look of the train so far. The lighting will be interesting, especially as you view the coaster from the parking lot at the end of the day.

Posted

^ Keep in mind that this Facebook page was almost certainly made by fans, not Cedar Point. However I would love it if Mean Streak got the same track as Outlaw Run. Maybe it would also break the speed record for woodies (maybe height too?), had an 80+ degree first drop, and was loaded with airtime. I'm totally down for a RMC treatment in general.

Posted

Oh, I thought the page was run by CP, that explains a little haha. It is a nice thought though. I've always been one to keep MS as it is (see my signature haha) but after seeing NTaG, and now outlaw run and IRat, I think some RMC lovin' could do some good for that area of the park.

Posted

I have no doubt the park will finish and open the ride on time. However, it does seem like there's still a lot of other work that needs to be done and there's only 2 months left. The park still needs to finish the station, test the ride, probably wire it, clean up the area, build the queue, work on scenery, and construct the entrance. I hope everything is successfully completed by opening day so guests can get the full effect and see the beauty of the new ride along with the entrance.

Posted
I have no doubt the park will finish and open the ride on time. However, it does seem like there's still a lot of other work that needs to be done and there's only 2 months left. The park still needs to finish the station, test the ride, probably wire it, clean up the area, build the queue, work on scenery, and construct the entrance. I hope everything is successfully completed by opening day so guests can get the full effect and see the beauty of the new ride along with the entrance.

I see your point, but i think 2 months is enough time, they should be able to finish all these things......unless the Yolocoaster crew switch with the Gatekeeper crew

Posted

I had always thought that the sections of track that were, in fact, wired, were done so before they were constructed on the site (i.e. brake runs, lifts, etc.)?

Posted
I have no doubt the park will finish and open the ride on time. However, it does seem like there's still a lot of other work that needs to be done and there's only 2 months left. The park still needs to finish the station, test the ride, probably wire it, clean up the area, build the queue, work on scenery, and construct the entrance. I hope everything is successfully completed by opening day so guests can get the full effect and see the beauty of the new ride along with the entrance.

 

I think that two months will be more then enough time. Did you see how fast they put the rest of the track up of the keyholes were installed? Dont worry we all will be riding will all effects come opening day!!!

Posted

Yeah I think they will be finished today ahead of schedule. Looks like only 2 or 3 more pieces of track left. Also look at how the station is progressing.

 

cp.thumb.jpg.355242ed2e7ab04bca880471071ef3e1.jpg

cp beach webcam 2/27/13 11:24 AM EST

Posted

I don't know, but it looks like they are going to go for the last piece today. Looks like they have one more section to go!

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/