Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

Kennywood (KW) Discussion Thread

P. 161: Steel Curtain reopens on May 24th, 2025

Recommended Posts

Posted

I'm happy to see how cheap it is. For that price even I might get one, as I could make the 4 and a half hour drive a few times a year and get my money's worth. The food's almost worth it alone! (I need my yearly fried oreo fix!)

 

-James Dillaman

Posted

I'll probably get one. I'm utterly lacking in photos of the park, so a season pass would be a good way to just hang out for short periods on random days and snap away.

  • 1 month later...
Posted

Although there's been no official announcement as to what the park will be receiving for the 2009 season, some regular park visitors spotted some lime green Morgan track behind the abandoned K-Mart building near the park. From what I've heard, the park is replacing all the Arrow track from the crest of the lift hill to the small portion of the second drop which is still Arrow. There's also been some talk that the length of the straightaway might be shortened and the degree of the approach lessened, but like I said nothing has been confirmed for sure yet. All we have is this picture of the track.

 

http://www.majhost.com/gallery/AML402/mylocalthemepark/coastertrackkw101808.jpg

 

There's also some other chatter about some other changes coming to the park, such as a return of an old favorite ride, but nothing has been confirmed by the park yet.

Posted
There's also some other chatter about some other changes coming to the park, such as a return of an old favorite ride, but nothing has been confirmed by the park yet.

 

I really hope it's a flying turns.

Posted

Yes, the Bayurns Kurve cars have been receiving rehab throughout the summer and there was some talk that it would be rebuilt at one of the Kennywood Entertainment parks this season. Although it's not completely confirmed, there is a good chance it will reappear at Kennywood next season.

Posted

If its for a queue line, why would the markings say: "secondary bank". Also, why would they need new queue lines when the line rarely makes it down the ramp, even on the most busiest of days? That doesn't make too much sense.

Posted

Myself, you should submit that track picture to Screamscape, if you haven't already done so.

 

Yay, someone used my Photo TR as an example, now I feel famous as well.

 

New track! Yay, smoothness!

Posted

Anything to improve an already great coaster is a welcomed sight!

 

The BEST thing they could do is extend the series of bunny-hops at the end to make it a little longer. Those hops are great, but extremely short.

 

However, redoing the first drop and part of the second seems like a logical choice. The first drop is the only part of the ride that is border-line rough IMO. Although most of the ride's Arrowness will be gone if this is true, that is not neccessarily a bad thing

Posted
There's also been some talk that the length of the straightaway might be shortened and the degree of the approach lessened

 

I believe that the "Second Bank" markings may refer to the bottom of the first drop. Smoothing out the bottom of the first drop along with re-banking the bottom of it would position it right over those markings.

Posted
We can't answer this now because we don't know exactly what they are doing, but the ultimate question is if this will count as a new credit or not.

 

Nah. Ask EBL if he counts Colossus at SFMM as different credits for each time it was retracked/reprofiled.

Posted

Odd little tidbit, the original plans for that straight-away was that Morgan was going to put a bunny-hopper in there, but then it was scrapped, noting that the speed would be reduced, and KW didn't want that. Wonder if they're actually going to put this in after all, since the speed wars are pretty much over in this type of a coaster.

 

Just a thought.

Posted
There's also been some talk that the length of the straightaway might be shortened and the degree of the approach lessened

 

I believe that the "Second Bank" markings may refer to the bottom of the first drop. Smoothing out the bottom of the first drop along with re-banking the bottom of it would position it right over those markings.

 

Those markings have been sitting there since the beginning of the season and are now heavily faded. I sincerely doubt they have anything to do with the re-tracking.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/