P. 2038: Top Thrill 2 reopens on May 3rd!

Recommended Posts

Posted

Another update, as things are moving smoothly at the STR Construction Site. Straight from Cedar Point themselves, we have pictures and a new blog.

 

BLOG UPDATE

 

We're getting closer. Inching ever-so-slowly to May 15. We've talked about the signs of spring earlier, but just like leaves seem to just sprout up all at once, our ride cars at the park are doing the same:

 

[PHOTO INSERT OF IRON DRAGON TRAINS AWAITING INSTALLATION]

 

Ride vehicles are coming out of their winter rehab and onto the midways, which means we're almost ready to get them assembled and running again. We love it.

 

Speaking of spring and leaves, the leaves are now sprouting at Shoot the Rapids, as crews are planting trees, installing fences and cleaning up the ride site.

 

We've also been told that we're days away from filling the reservoirs with water. We'll start with the island reservoir and then move over to the mainland reservoir.

 

The water is pumped in through regular water lines, cycled through the filtration system and will then become the ride's means of movement and saturation.

STR260.jpg.b3aa538749a49b6f1daf7986ab5d1dbf.jpg

Rock work in the final splash pool is complete.

STR261.jpg.0caf29332ee7ae497253e0b080a3ecc8.jpg

The final run-out.

STR263.jpg.0c8b7b199e45021d9f6200bdc61960b3.jpg

Workers are planting trees all around the ride site. TREEEEEEES!

STR264.jpg.52e125ff0e10aa6fcc5790118bd30884.jpg

More trees near the first lift hill. MORE TREEEEEES!

STR269.jpg.225fbb146fa445e850a2102ec309e8c5.jpg

Inside the station, workers are cleaning up, preparing for queue line.

STR270.jpg.68c9f9e6c13ff8cca42e00e882fd0c0a.jpg

The entrance ramp to the station. The left side is for our Special Access guests.

STR271.jpg.8e61408f879722ff59ae55bde3603e83.jpg

Crews from Cedar Point and IntaRide test the drive wheels in the station.

STR273.jpg.fbfd80604c8a25b5870ad894855ff354.jpg

The final turn into the station. I FOUND MORE TREEEEEEES!

STR274.jpg.3302be4c335b955545a12b82dcb7b680.jpg

Crews are cleaning each splash pool in preparation for filling.

STR275.jpg.31bb9610850d07fc785c24892e8b7be7.jpg

The rock canyon on the island is ready.

STR276.jpg.9a1bcfcfe38331e7805ad1945c3be118.jpg

Coming soon, Water

Posted

Anyone know if you are able to use a gift card to purchase the Spring ticket? I would assume not since you can only buy it online, but I want to be certain. I have e-mailed them numerous times and they haven't answered.

Posted

I am not sure if it goes all the way up or not but if they are testing the pumps than they wouldn't need to fill it all the way. Plus you can see the differences between the pools and how the one on the right has rain water.

Posted

That happens to be right where the trims are. Maybe they are adding magnetic brakes, which would be awesome (That's probably not the case, but I can hope). Or maybe Magnum will become the tallest and fastest wild mouse

Posted

I made a little time-lapse of the webcam yesterday before it went down. You can see quite a lot of details (like Power Tower moving in the backgroud) in the "HD" version:

 

Posted
That happens to be right where the trims are. Maybe they are adding magnetic brakes, which would be awesome

 

Why would that be awesome? There would be no more random trimless rides.

 

Interesting picture. I'm going to say it valleyed. It has been both chilly and windy lately.

Posted

^Yeah, I gotta say retrofitting those trains with magnetic brakes, while plausible, wouldn't be practical. That ride performs very, very differently from day to day depending on weather because of its location right on the lakefront. The trims are turned off on colder/windier days so it has enough speed to finish and keep the interval up, and turned on when it's warm/humid so it doesn't kill all 36 people on board. Magnetic brakes would probably throw a wrench in that equilibrium they have going with the trims. Not only that, I can't even imagine how strong the magnetic brakes would have to be on the final brake run because that thing FLIES into those brakes.

Posted

First up are random updates from around the park. MaXair got some new paint and the only thing in the spot that Demon Drop used to occupy is dirt.

 

April 19, 2010 Blog

 

Cedar Point is having an auction to be one of the first riders for Shoot the Rapids.

First Riders and More

 

Want to be the first to ride Shoot the Rapids and help out a great cause? Then click here to place a bid for a chance to have those bragging rights!

 

Your bids benefit the Firelands Chapter of the American Red Cross. As they say, bid early, bid often.

April 21, 2010 Blog

 

And now for some Shoot the Rapids pictures! Here are a couple before and after pics.

 

Before

 

After. Notice the water cannons at the bottom?

 

Before

 

After

 

Some people have said that there may be some theming in the tunnel, but based on its size it would be very minimal.

 

Gates have been installed

 

An overview of Shoot the Rapids. Look, the waterfalls are running!

 

Of course more pictures can be found in their construction gallery.

April 15, 2010 Construction

April 19, 2010 Construction

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/