Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

Liseberg Discussion Thread


Recommended Posts

Liseberg is my hometown park so I'm beyond excited about Valkyria! I don't live in Sweden anymore so I haven't been to the park in a while but the last couple of times I was there I decidedly skipped Kanonen as it has never been a favorite. It's an ok coaster but the tightness of the layout does make for quite a rough ride so I'm glad it's being replaced with something (hopefully) more awesome.

Link to comment
Share on other sites

Does anyone know which rides will be open during the Halloween time?

- All coasters except Balder

- Mechanica

- Lisebergshjulet (ferris wheel)

- Jukebox (Polyp)

- Hanghai (Disk-O)

- Uppswinget (Screamin' Swing)

- Radiobilarna (bumper cars)

- Svänggungan (chair swings)

- Most kids rides

 

Atmosfear and Hotel Gasten will be used as haunts and won't operate normally.

Link to comment
Share on other sites

Just arrived home from a media evening @ Liseberg and it was scary

People will be scared @ the haunted houses.

 

I will post photos tomorrow after the official opening of Halloween @ Liseberg.

 

/// Marcus

Link to comment
Share on other sites

A little bit later then I planned, but here are the photos:

 

Image_01.thumb.jpg.53004cd5d651a7662f13271f3e0441fb.jpg

Image_02.thumb.jpg.2baadf902aa056e15685730ecc7883d2.jpg

Image_03.thumb.jpg.a0c7765b13a3e7e5b9967fee6dab53cc.jpg

Image_04.thumb.jpg.5f7163be665f940187cc1d98d6ab322c.jpg

Image_05.thumb.jpg.fcd4b8a6ccccab6bb44d6ee954b8e624.jpg

Image_06.thumb.jpg.7c0d391861280a3d3df73ba5de20e0ed.jpg

Image_07.thumb.jpg.700c3a16a432c8b307fcfe74feb19cee.jpg

Maze for the children

Image_08.thumb.jpg.5e1033d27cff5e041a1a851334c4a7ce.jpg

Image_09.thumb.jpg.545c18552205f5f66359f1436dd090ee.jpg

Parking space for broms

Image_10.thumb.jpg.2340a2beca7a9e44c52dcb10ec233521.jpg

Image_11.thumb.jpg.041a245d5039e4a3ccf8a04f82b0da99.jpg

Image_12.thumb.jpg.51999775aef94b37886d1b6fa5adee2a.jpg

Rabbit delivery system to the shop

Image_13.thumb.jpg.389e3f5eb17d41f034caa230ac408d05.jpg

Image_14.thumb.jpg.d1051ee07fc314410aafa455a652f589.jpg

Image_15.thumb.jpg.8e1fb2525ad677f311ce4b9a55916b9d.jpg

Image_16.thumb.jpg.7c74f5fb201706e5ea91ab58a255cbe7.jpg

Preparation for the iceshow

Image_17.thumb.jpg.d1e4e239a3878b4d1b1c0695d766fc80.jpg

LOKE

Image_18.thumb.jpg.807bc6ae5bb282a81069aa5ff30e9a70.jpg

Image_19.thumb.jpg.10fd988cea7cbc7cf76cd4986541e244.jpg

 

The new Distrikt Z:

Image_20.thumb.jpg.a55eb24d5c23d3c02dc477b03a65a6b9.jpg

Image_21.thumb.jpg.43cc239e6167f5188f31df5095c5e7ee.jpg

Image_22.thumb.jpg.747bd32450185a61e5942e6513dc5ac2.jpg

Image_23.thumb.jpg.ed9d49b435bbe9037dfe0f2f9b2c357e.jpg

Image_24.thumb.jpg.d90d635c9b71fb5befb013cfaed69935.jpg

Image_25.thumb.jpg.9951237555601f8b52d1bb5a1f412602.jpg

Image_26.thumb.jpg.ad852ae8324a96eab17a8fe0dae9c14e.jpg

Image_27.thumb.jpg.526001985f17779540ad7ee04adf9418.jpg

Image_28.thumb.jpg.19240b304a2cdd746ea5ac4cae1ae11b.jpg

Image_29.thumb.jpg.3d0be1e9828683b42fd3d40b2baf8d06.jpg

 

And some classic photos of Liseberg:

Image_30.thumb.jpg.3c1f977af23debb117efc0ecf8fe19c9.jpg

Image_31.thumb.jpg.f6d75474f09fba8084c147aae7a02023.jpg

 

/// Marcus

Link to comment
Share on other sites

  • 3 weeks later...

Due to problems with my computer I haven't posted the photos from last Fridays grand winter season opening @ Liseberg.

In the short time between Halloween and Winter seasons, the staff @ Liseberg have made great work to remove all Halloween themeing and prepare the park for winter

 

Bild00001.thumb.jpg.d830574192f604729ab5eab9561d0855.jpg

Bild00002.thumb.jpg.f4ea8f01babba0084f4aecadff850c84.jpg

Bild00003.thumb.jpg.0eed1f7bf4edf48dc8cd698f1d36cb79.jpg

Bild00004.thumb.jpg.8152a10e31012ac6bec8225510ea77e2.jpg

A gigant nutcracker

Bild00005.thumb.jpg.198ccea1b0472fc73f73685c1a57bfb3.jpg

Bild00006.thumb.jpg.0c05f113b03be7e3f53f68bc25b15e91.jpg

Kaninlandet looks great with all the snow and lights

Bild00007.thumb.jpg.6614b89c84d5b95a3e754645aea42ff2.jpg

Bild00008.thumb.jpg.a4c4c3e0903982737d0b240f4fb78d79.jpg

Bild00009.thumb.jpg.3e1a11b8a1d2b35213ccf9eb826e275e.jpg

Bild00010.thumb.jpg.0c073490347340e4c83942adae24a5cd.jpg

The road to Santa

Bild00011.thumb.jpg.c2952daead180409ee76ab6a7aa7d4fe.jpg

Bild00012.thumb.jpg.c835a7353599a64a614da52512fdc77d.jpg

The only large running coaster

 

Bild00014.thumb.jpg.325a20f774549ca70914b07c81e394e5.jpg

The fairytale castle now has a medieval market

Bild00015.thumb.jpg.42fca467cf60073aa94b0092ad4dcb43.jpg

A very short cue to Mechanica in the light rain

Bild00016.thumb.jpg.eadc49ea573a36c7b6d80d5fab5c41e2.jpg

Was orange 2 week ago

Bild00017.thumb.jpg.94ea80fe17f267b8aa614cb65db2e541.jpg

Bild00018.thumb.jpg.19c16e0f7e2bdb73ce86feaf0a66e3e5.jpg

Bild00019.thumb.jpg.5b37dd47c11a81dd1f1f88799ed8b817.jpg

Bild00020.thumb.jpg.24c8ce9f0ff74f1581a4f92a5e1eaeb9.jpg

Creepy snowman

Bild00021.thumb.jpg.76a88670628258698cc8848eb8f005f5.jpg

Bild00022.thumb.jpg.f1c5b259bc2d508483ca288d84d59ce5.jpg

 

/// Marcus

Link to comment
Share on other sites

[attachment=0]IMG_1276.PNG[/attachment]

So Liseberg changed their minds, Kanonen will close after this season and work on Valkyria will begin this spring.

They must already have a buyer. I suppose that is why they are able to push it back and get a head start on Valkyria, which is still set to open 2018, right?

Link to comment
Share on other sites

[attachment=0]IMG_1276.PNG[/attachment]

So Liseberg changed their minds, Kanonen will close after this season and work on Valkyria will begin this spring.

They must already have a buyer. I suppose that is why they are able to push it back and get a head start on Valkyria, which is still set to open 2018, right?

 

I have to admit that I was a bit skeptical about how they were going to find the time to dismantle Kanonen and then get the somewhat large Valkyria built in the off sesaon. It could be that they already have a buyer but maybe they also just realized that the project was going to take longer than they initially thought.

Link to comment
Share on other sites

Getting Kanonen dismantled and Valkyria up and running in 6/7 months (assuming the idea was to close Kanonen in September) would have been pretty tight. Helix took a lot longer to build but that also needed a lot of landscaping to be done.

 

Valkyria will require some landscaping as well, at least for the underground portion.

Link to comment
Share on other sites

In the local newspaper today:

 

Lisbergs biggest project:

 

A hotel and adventure waterpark for 1.9 billion SEK.

image.jpg.c6daa4d66b899bad5662272c736fca89.jpg

 

Facts/Lisebergs waterpark och hotel

Hotel:

453 rooms

Main restaurant for 550 guests

A roof bistro for 150 guests

a smaller spa-facility

 

Waterpark:

Capacity of 2800 guests

Eight themed pools

Ten waterslides

Restaurant with a capacity for 400 guests

 

The plan is to open in 2021

 

Read more: GP - Swedish

 

/// Marcus

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/