^^^That photo (yes photo is spelled with a "ph") looks great. Let's hope the real thing looks as good as the mock-up. This coaster is most likely going to be my first dive machine, as I have almost decided that this will be one park I have to drive to next year, with a stop at Dollywood on the way home maybe. Bravo, Busch Gardens, and thank you.

 

-James "It could have been a kiddie coaster " Dillaman

Posted

Heh... the new coaster at BGE is announced, and the thread nearly dies. The new coaster at CP has yet to be announced, and there's twice the discussion. Says it all, doesn't it?

Posted

That's probably because there are no track or supports showing up. Cedar Point's in full-fledged construction. This thread should pick up once we see it go vertical.

 

That said, this coaster looks really exciting!

Posted

Here's a few fresh pics for you fans of holes, rebar, and blue metallic cylinders.

1711563476_Griffon3.JPG.8c964cad199f3ecc5a35e6028b3c7daa.JPG

Another shot from the train--look at them purty blue pieces on the right.

797165037_Griffon2.JPG.1d97219011d2950de0943e75205ef0cd.JPG

The Griffon site from the train--the ornage netting is for your safety, of course.

1633467693_Griffon1.JPG.fd830e4a5a7602a9ccf89470559d7248.JPG

Mmm--rebar! Piles of rebar! And black pipes! Oo-o-o-o . . .

Posted
I cant wait to ride Griffon May 12th is the day I go over the edge. And April 14th is the day I dont see light at the end of the tunnel.

 

You better pray it is open by May 12th!

I am kinda disapointed how very slow construction is going.

I remember BGW closing day in 1998 (Halloween) they had Apollo's Brake run, transfer, station, lift and most of the footers done.

Scroll to bottom

http://www.themeparkreview.com/photos/bgw/apollo.htm

 

I am thinking Memorial day Weekend (but hoping ASAP)

 

Hey Chuck, did you see any track or supports?

 

JEFF

Posted

^Jeff, the blue cylinders were the only "possible" pieces I noticed, but that doesn't mean that they aren't stashed somewhere nearby out of guests' view.

Posted
^Jeff, the blue cylinders were the only "possible" pieces I noticed, but that doesn't mean that they aren't stashed somewhere nearby out of guests' view.

 

No, those are not Griffon pieces. They are water pipes for draingae or possibly for the splash pool area.

 

I will check it out Friday

 

JEFF

Posted

I am courious (how do you write that word) how the station is going to work. Trains that don't have a floor in . . . from that with (about 5 meters wide). The floorless station floor system most be immense!

Posted

/\ Most likely they will use a standard floorless system for the parts around the wheel assemblies, and possibly the use of a rising floor for the outer seat area. So most likely a 4 way rising floor. I dont know for sure just a best guess.

 

 

I will be going next month for a view of the construction.

????

Which side of the train should I sit on for the best photos and view of the construction site..

Posted

Cast members were telling me that it will open with the park and considering that it's almost 2,000 ft. shorter than AC, I can see it happening. Whether or not the scenery will be pretty, I doubt it.

Posted
I will be going next month for a view of the construction.

????

Which side of the train should I sit on for the best photos and view of the construction site..

 

Far Right side of the train.

 

JEFF

Posted

Thanks,

Its doubtfull that vertical construction will be in the process but figured had to at least try to get some construction photos.

 

Anybody remember where they stored the track for AC or ALPie during the construction process.. I just wonder ir the track has been seen yet. Maybe its still in the production process.

 

As for construction I would think that track work wont start for another couple months. With out a tunnel and with the park closing at the end of Oct. I would figure construction will take off in Nov. Sheikras main track work didnt get going until Dec. but that is with the tunnel.

 

Oh well, wish I had some conections with BGE to make a winter construction trip for photos. Hopefully BGE will give us lots of updates on there site but dougbtfull as BGA did with SHeikra with very limited photos.

Posted

Alpengeist & DF's track was kept in the Employee parking lot. (I assume this is where Griffon's will go too)

Which is virtually impossible for the gp to see except from the very top of Alpengeists lift.

 

Apollo's track was kept right there in the Germany Lot with no gates or anything. I took a few pics in 1998.

 

That was one Nice thing about AC, it was right there by rt. 60 so construction pics were easy. I have only seen one construction pic of Alpengeist taken from a helicopter.

 

JEFF

APOLLO2.JPG.5f0fff7e041a19ebdca78f845b74dd32.JPG

Yo, help me put this in my truck =)

APOLLO1.JPG.aad53248f1461e7360f3e6a1104ddc61.JPG

Park right next to it!

Posted

Yeah, we won't be seeing much of Griffon's construction because so much of BGE is hidden from view. Sigh . . .

Posted

Perhaps we can get an off-season employee to snap some shots of Griffon's construction, even hard to see coasters like this always seem to get some construction shots.

Posted

Sorry for this but my friend was doing a mascot search and he found this.

 

 

Familiar LOL!...

 

I wonder when track will show up...

 

 

Personally, I think we will see Griffon pop out of the skyline from the highway, it is possible but if we can pinpoint Alpie its kinda skyline wise near tthat!

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/