HolidayWorldFTW Posted July 18, 2014 Share Posted July 18, 2014 Just checked out the construction cam.... Wow that construction site changes really quick., and yes I thought yesterday that the concrete was being poured into a pit because of the size...but today wow.. Thats one mega huge footer. Link to comment Share on other sites More sharing options...
HolidayWorldFTW Posted July 18, 2014 Share Posted July 18, 2014 I hope that once the announcements made Paula can get us some closer up pics and explain some of the construction for us like she's done in the past. I always find that super interesting. Link to comment Share on other sites More sharing options...
HolidayWorldFTW Posted July 18, 2014 Share Posted July 18, 2014 Wait wait wait.... Sorry for the triple post but I'm watching the construction cam... And that pit that you guys think is a footer on the left side behind the dirt pile,.... Yea I don't think thats a footer. That pit area is big enough for a guy to just hop down there and walk around.. And I seen what looked like a piece of drywall going down into the pit? Strange...... Anyone else watching and see this? Hmm there is no way that what is going on in that pit is just a footer being poured, it is big enough that about 4 or 5 guys were walking around in said pit. I'm gonna call this a tunnel instead of a footer being poured. Link to comment Share on other sites More sharing options...
ZeroGravity55 Posted July 18, 2014 Share Posted July 18, 2014 ^ They've poured a pit and then built a box like structure for one footer on one side and then it looks like they will do the same on the other side starting on Monday. After they're done with that, they'll fill the rest of the pit up with concrete. Just my observation, but it appears there will be some high forces in this area. Link to comment Share on other sites More sharing options...
Raven Maven Posted July 18, 2014 Share Posted July 18, 2014 ^ I see you've discovered my new office. Link to comment Share on other sites More sharing options...
parkjunkie Posted July 18, 2014 Share Posted July 18, 2014 Can someone post a screenshot of the construction, i would like to see what you guys are talking about. Im working 16 hour shifts today through the weekend. Its still dark when i get up and also by the time i get home and my phone wont load the cam. Link to comment Share on other sites More sharing options...
neil009 Posted July 18, 2014 Share Posted July 18, 2014 Huge footers? Any chance this could still be a hyper? Maybe B&M's first hyper with inversions? Link to comment Share on other sites More sharing options...
HolidayWorldFTW Posted July 18, 2014 Share Posted July 18, 2014 . You'll have to excuse the quality as these are screen captures from my ipad. This here is the over all site you can see on the cam. Â Â And this is zoomed in on the area in question. Link to comment Share on other sites More sharing options...
HolidayWorldFTW Posted July 18, 2014 Share Posted July 18, 2014 Sorry, those two captions are in the reversed spot.. Lol but you get the idea Link to comment Share on other sites More sharing options...
parkjunkie Posted July 18, 2014 Share Posted July 18, 2014 Dear god, those are huge.... wait, thats doesnt sound right lol. Thanks for posting those Link to comment Share on other sites More sharing options...
mikeykaise Posted July 18, 2014 Share Posted July 18, 2014 I'm starting to wonder if its possible the footers are for other rides not just a new coaster. The building looks like its going to be either a bathroom, food stand, game booth or a drink station. They did say that this was going to be an expansion so I'm sure there'll be other new rides. Link to comment Share on other sites More sharing options...
prozach626 Posted July 18, 2014 Share Posted July 18, 2014 ^A clue revealed earlier stated multiple times that this would be "One.Big.Thing." Â Not multiple rides. Link to comment Share on other sites More sharing options...
rcjp Posted July 18, 2014 Share Posted July 18, 2014 They're going to fill in a footer now! Link to comment Share on other sites More sharing options...
parkjunkie Posted July 18, 2014 Share Posted July 18, 2014 The building is probably going to be a computer/ electrical building. And with its placement next to that long straightaway of footers, makea me think even more this is going to be a launched coaster Link to comment Share on other sites More sharing options...
kyleparks77 Posted July 18, 2014 Share Posted July 18, 2014 After looking at the webcam, I at first thought "Really? Those are the footings they think are huge?" and then I realized we're talking about a roller coaster and not a major interstate bridge that I'm accustomed to So yes, those are quite large in context. Â Let's estimate the footing dimensions as a 10' x 10' square and 4' deep (that's based on the rebar cage for a footing that's currently sitting on the ground in the middle of the picture). Running the numbers and assuming some basic soil properties, each of those footings will have an allowable bearing capacity (assuming all loads are from a vertical column) of roughly 600 kips or 600,000 lbs. That's quite a lot. For perspective, a typical bridge carrying 4 lanes of traffic in Louisville (where soil conditions are typically poor for construction) will have a pier with 3 columns. Each of those columns will have a footing that is 15' x 15' and 6' deep (typically). We're talking about something fairly similar here for a roller coaster. I'm having a hard time trying to figure out where these massive loads will be coming from. Link to comment Share on other sites More sharing options...
rcjp Posted July 18, 2014 Share Posted July 18, 2014 I'm having a hard time trying to figure out where these massive loads will be coming from. A 500 ft tall top hat!!! Link to comment Share on other sites More sharing options...
Dar Posted July 18, 2014 Share Posted July 18, 2014 ^^B&M trains weigh around 7-10 tons (based on Nemesis and Air, I'm not sure about B&M sitdowns!). If that footer is on a particularly high force area, it could pull around 4G, maybe more, at it will be a spike of force. Â I'm not a civil engineer, so I could just be talking out my butt but that's my line of deduction for such massive footers! Â Link to comment Share on other sites More sharing options...
COASTER FREAK 11 Posted July 18, 2014 Share Posted July 18, 2014 I'm having a hard time trying to figure out where these massive loads will be coming from. Â HA! Link to comment Share on other sites More sharing options...
rcjp Posted July 18, 2014 Share Posted July 18, 2014 ^^B&M trains weigh around 7-10 tons (based on Nemesis and Air, I'm not sure about B&M sitdowns!). If that footer is on a particularly high force area, it could pull around 4G, maybe more, at it will be a spike of force. I'm not a civil engineer, so I could just be talking out my butt but that's my line of deduction for such massive footers!  I don't know if that would be enough. I know their wing coaster trains are quite heavy and gatekeeper pulls 4 Gs on the bottom of the drop while having relatively normal footers, right? Link to comment Share on other sites More sharing options...
kyleparks77 Posted July 18, 2014 Share Posted July 18, 2014 ^^B&M trains weigh around 7-10 tons (based on Nemesis and Air, I'm not sure about B&M sitdowns!). If that footer is on a particularly high force area, it could pull around 4G, maybe more, at it will be a spike of force. Â Based on that, we have 10tons x 2000lbs/ton = 20,000 lbs = 9072kgs and now converting 4G's of force to lbs... 4 x 9072kgs x (9.18m/s^2) = 333124 Newtons = 75,000 lbF + 20,000lbs = 95,000 lbs plus the dead weight of the steel track and supports, which can be significant but I don't think it could make up for the 500,000 lbs. Although, keep in mind there is a "factor of safety" applied when determining foundation sizes. While I've been calculating the "ultimate" bearing capacity at 600,000 lbs, the "design" capacity is probably somewhere around 300,000 lbs. Then again, I made conservative estimates on the dimensions so who knows Link to comment Share on other sites More sharing options...
kyleparks77 Posted July 18, 2014 Share Posted July 18, 2014 Double posting. This time without math!  New holiblog post that all should definitely read: http://www.holidayworld.com/holiblog/2014/07/18/promises-kept/  Important part at the end: "What we’re building is going to be truly unique. The first of its kind."  Maybe we're all thinking too small? Link to comment Share on other sites More sharing options...
HolidayWorldFTW Posted July 18, 2014 Share Posted July 18, 2014 Well if you read Leah's new holiblog post then you'll know that this thing is going to be one of a kind, so ANYTHING is possible. She also mentioned that if Will were still here it would be his dream ride. This keeps getting more and more interesting every day. It's hard to contain the excitement Link to comment Share on other sites More sharing options...
rcjp Posted July 18, 2014 Share Posted July 18, 2014 ^Still, I'm trying to moderate my expectations as we seem to be able to dream of anything. Link to comment Share on other sites More sharing options...
jarmor Posted July 18, 2014 Share Posted July 18, 2014 Im curious to see what the ride that didn't make it in 2009/10 was... Link to comment Share on other sites More sharing options...
HolidayWorldFTW Posted July 18, 2014 Share Posted July 18, 2014 I could see them dedicating this ride to Will... With a plaque and everything either on a train, in the station, or on the track somewhere. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now