^Thanks Robb, they really do pack in the rides!

 

========================

 

Hey everybody!

Today for you I have a small update, since not too much has changed in terms of construction. The roof has been put on partly, as well as the second floors' floor party in. It has been raining like cats and dogs here for the past 4 days and will continue for the next week, so not all of the pictures will be crystal clear! These pictures were taken on January 17, 2010(I wanted to wait till Tuesday for the update). You can also expect a short video between now, and next Tuesday! I hope you all enjoy!

Thanks as always.

 

~Nicholas(coaster-crazy)

=============================

TPRscbb7.jpg.833908856cbd7806dc83cc62b494b7c5.jpg

One last street-side picture showing the whole structure, with it's new roof. Brrr, it's cold!

===============

NEXT UPDATE: New updated pictures of the Haunted Castle as well as some concept art, and possibly a video! Let's hope the rain doesn't hold-up construction too much!

TPRscbb6.jpg.84389aacf7e8800ad40c7f907c4d2933.jpg

Street-side view of construction. I'm sure those guys are glad to be working under there rather than up-top welding!

TPRscbb5.jpg.6fde93a5e6312396bd201317346436c4.jpg

Beach-view of the NEW Haunted Castle. Note that you can see the roof and 2nd level roof/floor put in.

TPRscbb4.jpg.95e5116ed97177eb40463863e771f805.jpg

Close-up shot of Boardwalk level construction of the Haunted Castle. Looks like it's pretty wet there too!

TPRscbb2.jpg.8a4b91d88c7eb7d2175e5b926d4cba33.jpg

Sparks from the welder above make tiny explosions when they hit the frigid water on the Boardwalk.

TPRscbb3.jpg.878607ff855320ede31c25bed3199e6b.jpg

Working up-top welding - in the rain and wind!

TPRscbb1.jpg.39414d266b1bcaf7866cdcd0c3b04f69.jpg

A very wet, and windy day here at the Boardwalk. As you can see, part of the roof and 2nd level floor has been placed.

Link to comment
Share on other sites

The building will be three levels.

 

top level (2nd story):

-new employee break area, ride department check-in area, admin offices

 

 

bottom level (1st story):

-ride loading area, food, and games on beach side

-operations office, lost and found, etc. on the RR tracks side

 

 

underground (sand level):

-main ride area

 

-----

 

Upon loading onto the ride, the car will descend underground via an elevator where the majority of the ride will take place. Towards the end of the ride, the car will travel up to the boardwalk level via a ramp.

Link to comment
Share on other sites

Thanks everyone. On the top floor will be offices, first-aid, storage etc. The Boardwalk level will be the ride loading platform as well as the return of the Ice Cream stand that was there and also a Roller Boller game, to name a few. On the basement level(10 ft below sand level) is where the main ride takes place.

 

Sorry I didn't respond earlier, we lost power on Tuesday after noon from the huge rain storms and didn't get it back till last night! Possibly expect a video this weekend or concept art.

 

Here is an image describing the layout of the ride at the Boardwalk level. Enjoy and as always, thanks for following! ~Nicholas

bwalkridedesignpic.jpg.c23db678b48dfac251ac034a39f1943d.jpg

Boardwalk level of the ride configuration.

Link to comment
Share on other sites

Hey everyone! Sorry for not having any updates recently. It's been a very busy week of school and I didn't even get to go to the Boardwalk until yesterday! Not a lot has changed in the past 9 days but I got a whole bunch of pics to show you! You will still get an update on this coming Tuesday like usual. I also plan on posting a topic fairly soon of my amusement park collection.(I collect the OLD stuff...) So let me know if you're interested in seeing that stuff or not! Here is a video courtesy of the Boardwalk of the Winter Storm we just had!

 

Anywho enjoy the update and thanks as always for following.

 

~Nicholas

scbb-hcpic8.jpg.a0199af49d5a1de64d0c10cd4a036efc.jpg

Cool shot of the Dipper I wanted to share. I wanna ride it!!!

====================

NEXT UPDATE: Coming this Tuesday, expect some new pictures of the Haunted Castle construction as well as a photo of a piece of the attraction I own... STAY TUNED!

scbb-hcpic7.jpg.2ce53f1971dab6ba2431e003ff6ac9d1.jpg

Street-side view of the HC. Not much new except for those stairs and wood supports at the far right.

scbb-hcpic6.jpg.824b49bf9a58640b9e7fbfdba8569443.jpg

The ocean's water came all the way up to the HC as you can see, since the sand is all smoothed out!

scbb-hcpic5.jpg.eda6657bf9dba3d9513d30d3ff27ddb5.jpg

Remains of the huge winter storm we had last week. The water apparently went all the way up to the Boardwalk it self!

scbb-hcpic4.jpg.0b421c2b76463300b9e422334c507cdb.jpg

From the beach. You can't really tell much of a difference but you can see the roof and some of the curved frontal parts.

scbb-hcpic3.jpg.44aa2b9c3a6a96f30e66a541f3db645f.jpg

Looking down the Boardwalk past the NEW Haunted Castle. Looking good!

scbb-hcpic2.jpg.86cab7ec9b8a0af9720a5b576fb80dca.jpg

View of the upper roof of the ride. Also rounded and now the roof is all in.

scbb-hcpic1.jpg.d6bb810f04ddf387a76e4c367eec514a.jpg

Front side of attraction with the now rounded front as well as wood holding it up for support!

Link to comment
Share on other sites

^Thanks for the comment!

===============

MINI UPDATE

FEBRUARY 8, 2010

===============

Hey guys, I'm back with another update - but it's a mini update actually! There will be a big update tomorrow with new pictures of construction. So look forward to that!

 

Below is a video showing some concept art of the ride itself, as well as some of the exterior of the building. Also below is a picture of something I got from the ride 'building' during the demolition. Enjoy, and look forward to the real update tomorrow!

 

http://www.youtube.com/watch?v=REWxhFawbz4

(video courtesy of the Santa Cruz Beach Boardwalk)

icecreamsignmine.jpg.3a307e694e4341a10e86d310cc2d78ad.jpg

Here is part of a sign I own from the Ice Cream stand originally part of the Haunted Castle's building. The stand has been there for over 30 years.

icereal2.jpg.b83038c1d890c690b5b99266230cdc87.jpg

Here is a view of the REAL stand before demolition. I have one of those piece.(I'm guessing one of the end's since the paint is cutoff on mine)

icereal3.jpg.d3ce88a1d19d2b59bec5f2055a3b1ee2.jpg

Another view of the Ice Cream stand/Haunted Castle. (on right)

====

Next update will be tomorrow! Look forward to that!

=======

Link to comment
Share on other sites

@ghost: Thanks!

 

@UberBeavis: You should come back to Santa Cruz this Summer, and thanks!

==================================

==================================

Hey guys!

 

I'm back again with another cool update! I just went to the Boardwalk today and I saw some big changes in the exterior of the NEW Haunted Castle. There is a lot of steel that has been put up, for where the walls/windows/doorways will be. It seems to make the ride building feel much bigger to me. According to a construction worker there, they have begun putting up the walls on the basement level of the ride. I also have included 2 pictures of the 2010 park map that advertise for the NEW Haunted Castle. I was just there on Sunday with some friends and it was great fun. Anywho, thanks for looking and if you have any questions, comments, or suggestions, let me know!

 

Enjoy! ~Nicholas

scbbpic1.jpg.1c7dcf10e2880718a5712dcf4d4e5850.jpg

This is where you will enter the queue for the ride. Nice shiny steel eh?

scbbpic2.jpg.66d9d6b1478342cdc960aa0f345fa051.jpg

Looking farther down at the Haunted Castle's new steel. Looking good.

scbbpic3.jpg.bfa9cc75ef17aa631f79d99f5d2d5277.jpg

Standing on the beach looking at the new ride. The stairs to the left are brand new. Also, we are now let much closer up to the Boardwalk then before.

scbbpic4.jpg.7930a3b60c55e3a401013c53af4a0fd0.jpg

A view of the left side of the ride's construction.

scbbpic5.jpg.d61482277a6de7fe9bddef235ecf1e4a.jpg

A beach-side panoramic view of construction.

scbbpic6.jpg.f0a421b76a573d205716c397be4e6ac8.jpg

Meanwhile, they were also working on pulling new cables through the tower. Apparently, they really needed replacing.

scbbpic7.jpg.176c08198e9e0cb2b78d647903eb6d35.jpg

Street-side view of the construction. Looks like they haven't quite finished up with the steel on the 2nd floor.

scbbpic8brochuretop.jpg.d701466dbe1f04ca4c707f9488a3cd48.jpg

Front-side of the 2010 Boardwalk map with an advertisement for the new ride!

scbbpic9brochuremap.jpg.e5ade3da943483a8f86253332e6db215.jpg

Inside the 2010 map you can find another little blurb about the ride including a logo. I'm not sure if this is the final logo, however.

===========

Update next Tuesday! Stay tuned.

Link to comment
Share on other sites

^Thanks! ..and nope, I don't work there, yet! (I'm only 15!) My Dad takes me down to the Boardwalk every Tuesday to take pictures. I do hope to work at the Boardwalk this summer as a job though.

 

~Nicholas

 

Oh ok you had me fooled lol... Good luck with trying to get a job there this summer!

Link to comment
Share on other sites

 

Hey guys, welcome to the next update!! I was at the Boardwalk yesterday and have seen some changes in the exterior of the building. A lot more steel has been put up and parts of the structure have been sealed off. There has also been some progress under ground but the pictures I took were too dark to see. But basically most of the steel has been put underground marking where the walls will be for the track to follow around. They are still aiming for a Memorial Day weekend opening - let's hope they make it!

 

Enjoy the update.

 

~Nicholas

trpscbb1.jpg.b5543c20ef55959d5dfe385477243150.jpg

Front left corner of the building with more steel. You can also walk in front of the ride on the NEW boarwalk section!

trpscbb2.jpg.8d1169819e297fd5c4922a1b9d5c7c7d.jpg

Side-view of the Haunted Castle. Working away on the steel!

trpscbb3.jpg.c7a1040ee7b8174526c091e71cfd2787.jpg

Closer up on the side....

trpscbb4.jpg.7e2fd2af5ad8e2ee5c415b90159b94b0.jpg

Looking down the front of the Haunted Castle... where that worker is is where you will enter for the ride.

trpscbb5.jpg.db135fa97eafc87f91bb0a57919d5f94.jpg

A lot more steel has been put up on the front side.

trpscbb6.jpg.bc03545590940f5038a1bfdb4b668ef3.jpg

Panorama of ride from beach. I liked how the colors of the Sky Glider were on the top of the picture. :)

trpscbb7.jpg.6018ccb2824980ec9a26ecf6ecaaf5a7.jpg

Beach side pic from the other side. See how we can walk in front of it now? :)

trpscbb8.jpg.f0bf4ed4ec8000553d57a80125fde371.jpg

A street-side view showing a LOT of wood that has sealed most of the back.. and look! A scissor lift!

trpscbb9.jpg.108d1ffad60eb03844f21071d4ec1872.jpg

BONUS PIC!!! .. They were blowing the pealing paint off the Sea Swing's platform so they needed to raise the ride. You don't see a swings ride in this position when it's not moving very often!!

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/