They say X2 will have a much greater capacity than X, but even X never operated at its full, theoretical capacity. Full capacity mode, I'm assuming, would involve one train between the lift hill and brake run, one unloading, and one loading. Hopefully they will do it right and not let capacity go well under 1000 per hour. Remember, a one train operation with 6 minute dispatches means a capacity of 280 per hour! 280!