Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

Recommended Posts

Posted
MORE TRACK!!!

This morning at around 8:00, workers were unloading a container with Spongebob track and supports. the track is an aqua-ish color and appeared to be track for the station and the first turn out of the station. With vertical construction finished on Avatar, look for Spongebob construction to begin very soon.

 

Oh great! There goes my insomnia again. Was fun to watch Avatar's progression over the webcams and should be the same for Spongy. You might say I'm "Having a wonderful time".

 

Any chance they'll bring back the Slime Geyser? Man I miss that thing.

Posted

The Pepsi Ripsaw Roller Coaster sign has been taken down. So have the Spongebob Posters on the wall. I wonder when the Orange Steak sign will be up. BTW Looty, do you know when Ripsaw will get it's paint job? I imagine that they will close it soon after New Years when the crowds start to die down again.

66344204_Ripsawsigndown.jpg.aa914cf0cb8dec4ceaccc1d4ca60267f.jpg

Posted

I don't actually know for sure when the scheduled paint job will take place on Ripsaw, but i'd imagine sometime in the next 4-6 weeks. The Park claims that they are on schedule for a March opening, but lets not forget that the Euro Fighter will take a lot longer to assemble than the half pipe...and they only have about 2 months left. Me personally, i'd say they are behind schedule so if they want everything done by March then look for A LOT to happen in the next 2 months.

Posted
I don't actually know for sure when the scheduled paint job will take place on Ripsaw, but i'd imagine sometime in the next 4-6 weeks. The Park claims that they are on schedule for a March opening, but lets not forget that the Euro Fighter will take a lot longer to assemble than the half pipe...and they only have about 2 months left. Me personally, i'd say they are behind schedule so if they want everything done by March then look for A LOT to happen in the next 2 months.

 

Looty, Timberland Twister went up in about a month as far as vertical construction goes. SSRBP is about the same length and only a little taller than TT, so by the end of January/early Feburary, I think that Spongebob will be ready to start basic testing.

Posted

Not much happened last night or today. There lookes like a wee bit o track poised and ready for something in the webcam. Tonight maybe?

 

Randome dorky tip: By saving the webcam pic every so often, you too can watch a coaster rise up in classic flip book fashion (or relive your 80's hard rock time lapse stage construction days )

Um...yeah....

 

Ok, hope they start building tonight.

camera1a.jpg.af60f934154b0ab275fed8ce9ac7760a.jpg

I'm on my way....I'm on my waaay ay ay, Home Sweet Home......

Posted

^ (looks puzzled and scratches head) Oh, I don't know about that one....

 

Kidding. I'd be for that as long as they spring for the rapids boats that have seat backs. The mini boats like at Holiday World or former Myrtle Beach Pavilion might fit the scale nicely. Wild Thornberry's theme maybe?

 

Good call my friend!

 

EDIT: Well, after 2 nights of el zilcho on spongy, me thinks stuff will happen after New Years. Yes, captain obvious strikes again....

Posted

^You and Vffreak07 are on to something there. Reinvent it as a rapids AND bring back the slime geyser for decor. Wishful thinking, sure, but a good dream just the same.

 

Slime Geyser > Wild Thornberrys (even though Flea is cool).

Posted

Hooray. Something new for me to do this year.

 

And, for those people who are upset/confused over the Spongebob theme job, who cares? I'll ride it if I go (and that's a pretty good IF). It may be a little kiddie for some people, but I'll go.

 

However, the character appearances are going to be annoying.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/