If this park does open by 2015, there are definitely gonna be some rides that aren't gonna open till 2016 or 2017. I think it would open with the 160 ft tall steel coaster, the 160 ft wooden coaster, and the kiddy coaster along with some flats. The mine train coaster could be a while due to all the theming that's supposed to go into it. Greezed' Lightning, if it is the original, would probably not open till 2016 by the earliest, due to all the refurb that's supposed to go into it. I don't know about you, but I would much rather see a Gerstlauer prototype shuttle loop open with the park in 2015 (if it does open in 2015) than having to wait for one to get refurbished.