Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

Top Thrill Dragster

Members
  • Posts

    1,909
  • Joined

  • Last visited

Everything posted by Top Thrill Dragster

  1. The concrete wall and how that area is dug into the ground.
  2. Knotts Berry Farm Update. The park was VERY crowded today with most lines at least 40 mins. But their were some lines well Past 40 mins. Over all it was a good day with all the crews except Jaguar doing a good job at getting people through the lines fast. Now onto the pictures. Sierra Sidewinder Construction as of (4-6-07) Keep up the good work! From the looks of it, this ride may interact with water! The New View from Silver Bullet Insert lift here. The Train will pass throgh here Bottom of the lift waiting to be installed. Track close up Moving On Rides Closed. Log Ride Not much activity. But from the looks of it, this ride will be down for a while. Perilous Plunge I looks like they are replacing the chain an a gear to the ride. Crowds, Crowds, and Crowds. It was so crowded today that Jaguar filled up the bottom part of the Q line. Ghost riders line was half way to the entrance. Bigfoot had a hour wait and the roof to the Q line is almost completely done. Boomerang had a 45min wait. And almost all the flat rides had a nice size wait. But on the other hand Supreme Scream was running all three towers (something I have NEVER seen!) and had a 5 min wait! Xcelerator's crew was dispatching trains at about every minute and a half! Silver Bullet had a 25 min wait for most of the day and Montazooma had about a 15 min wait. Jaguar! Just look at that LINE!!! Boomerang. Bigfoot Other Rides Supreme Scream Three towers running!! Over all Park Activity Silver Bullet. Silver Bullet has received shade over the transfer track. A midway game station is in rehab. Camp Snoopy is now Snoopys Spring Safari Craft are on sell in Ghost Town. Now I leave you with Xcelerator Launching in to the sun. Thank you for looking at my update and I hope that you enjoyed it. --Ryan
  3. Did they use the new entrance? And did they put anything up around the Psyclone site?
  4. The two most hated subject I took were Spanish and Biology.
  5. Good update. The Wii station looks very nice. Did you by chance pick up a 2007 park map, if so could you take a picture of it and post it here?
  6. Great TR. It looks like you guys had fun. I wish I could have made it, but I accidentally over sleep.
  7. Great. Now I fear that Goliath is going to trimmed even more and the brake at the bottom of the pretzel loop on Tatsu will be used. But as for the cell phone thing, its about time that was exposed. Maybe that will get the park in to gear on enforcing their rules with employees.
  8. Nice TR!! I surprised Cedar Fair gave Thunder Road a level 4 rating instead 5. Jaguar at Knotts has a level 4 too, and it is no were as big or as fast as Thunder Road.
  9. AMAZING!!!!! I loved your clown dark ride and I am sure that this one will be no different. Cant wait for the video!!
  10. ^ Most likely, yes. They changed the wheels on Tatsu from Nylon to Polyurethane a couple of weeks before it opened.
  11. Wow, that looks like a lot of fun.
  12. ^ Probably around one hour, but that with light traffic. I would say SFMM is a good 90 mins away from Knotts.
  13. You will have plenty of time at Knotts, so the extra night is not needed. When the gates open at SFMM RUN strait to X then go to the back of the park. And if the line for Tatsu is still long later in the day just use Flash Pass.
  14. ^ No, its just at this time of the year ride are coming out and going into rehab, causing a lot of ride to be closed at once.
  15. Sorry for the bad trip to Knotts. It is unacceptable for PP and Ghostrider being down especially since they both just came out of rehab. Now as for the log ride, something major and unexpected has happened and the ride will be down for a while.
  16. ^ Welcome! About the hyper coaster thing, he is saying that there is a hyper coaster coming to Carowinds to poke fun at a news and rumor site that some times gets info wrong. And he is poking fun at how some enthusiasts think when ever there is construction going on in a park, it is automatically a roller coaster being built.
  17. Is it me, or dose that thing looks like it is hauling some major A$$.
  18. ^ I don't know, I did not ride Gold Rusher yesterday.
  19. ^ It will probably be packed because people have work off and use that time to take their family places.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/