
i<3coasters
Members-
Posts
271 -
Joined
-
Last visited
Everything posted by i<3coasters
-
Holiday World (HW) Discussion Thread
i<3coasters replied to robbalvey's topic in Theme Parks, Roller Coasters, & Donkeys!
It's a collaboration between Intamin & RMC -
Cedar Point (CP) Discussion Thread
i<3coasters replied to robbalvey's topic in Theme Parks, Roller Coasters, & Donkeys!
Ding ding ding! -
Guys, I'm really not that worried about this thing dueling regularly. Would it be pretty cool? Yeah, of course. But even if you run through the whole course without another train next to you, the layout of this thing is awesome and will almost certainly be a top 20 coaster next year in the Hawker poll. We're getting a coaster with TWO 120+ foot 80 degree drops, boatloads of airtime, and a plethora of twisty goodness, and you're complaining it will suck if it isn't dueling consistently? I'm sure NTaG is pretty worthless then, since it doesn't even have that capability. C'mon man.
-
Cedar Point (CP) Discussion Thread
i<3coasters replied to robbalvey's topic in Theme Parks, Roller Coasters, & Donkeys!
It seems like Six Flags has an exclusivity deal with RMC for their I-Box track for the foreseeable future, no? -
Most Coaster Credits in a Calendar Year
i<3coasters replied to redfoot12's topic in Theme Parks, Roller Coasters, & Donkeys!
That would be this year for me. So far with Cedar Point & New Hotness I've added 60. Weird that it's such a round number, but I more than doubled my count (which I think is the biggest jump I'll ever take). May add a handful more before the year is out with a trip to SWSD, or maybe SFDK. -
West Coast Bash 2014 - TICKETS ON SALE!
i<3coasters replied to robbalvey's topic in Theme Parks, Roller Coasters, & Donkeys!
Wow this came up quick. Only 2 weeks away! -
With the work Knott's has done the past 2 years to bring it back, Can you elaborate on this? I'm genuinely curious to know what has been done. Around 2012 it seems like the park started taking GhostRider's rehab a lot more seriously, and instead of just rehabbing the trains they've also been gradually re-tracking the roughest parts of the ride by replacing the top 2-3 layers of the wood stack (as you can see here). As of now my estimation is that the ride is about 35-40% re-tracked, with fresh wood on what were previously some of the ride's worst parts.