-
Posts
798 -
Joined
-
Last visited
Everything posted by Sticky Nicky
-
Just remember before any trains go on the electrical work has to get done. As in adding all of the sensors and testing the lift, etc. Plus, a 'pull through' must be in order before the trains are put on. Also, I think they have to finish themeing before the trains can go on for a better 'pull through' result. My guess would be in mid or end of March. I'm guessing that they would want it open on March 15th, not at the end of March.
-
The small fountain by Truckin is still there, But it is not connected to the Log Chute anymore. It has it's own pumps now. There is a blocker piece uder the two bridges that the water used to cross. As for the stream, I am afraid that it is al dried up now and will probably stay that way for a long time.
-
YAY GIANTS. I was the only one in my class betting that the Giants would win. Sorry about your not so perfect 18-1 record Patriots.
-
Photot TR: Eastcoaster 2008
Sticky Nicky replied to CycloneMan's topic in Theme Parks, Roller Coasters, & Donkeys!
Evel Kinevel will be a clone of Thunderbird at Power Park, not Troy. Great photos though. It sounds like there will be tons of new things to do at parks in 2008. I am also glad to hear that Morrie's Pier will be adding a GCI. -
What Podcast Do You Subscribe To?
Sticky Nicky replied to PhishyBrewer's topic in Random, Random, Random
Mainly the coaster podcasts. In The Loop In The Loop's Guide to the Midway Coasterbuzz The Kevin and Nate Show Plus many others. Hopefully a TPR podcast is in the future. Please! -
Congrats to our own Oscar Winner!
Sticky Nicky replied to SharkTums's topic in Random, Random, Random
Congrats. I saw the movie last weekend and thought it was great. Juno is also expected to be the first Fox Searchlight Movie to make over $100 million. I can't wait until the DVD comes out. -
CGA's Flight Deck STRIKES BACK!!!
Sticky Nicky replied to montezooma's topic in Theme Parks, Roller Coasters, & Donkeys!
How come they can keep the Survivor name on their Disk-O? Or are they just waiting to change it. -
The point system and unlimited ride ristbands are the same, the price is just increasing. Points will be $1.00 each(up from $.88) and each ride will cost an extra point(Timberland Twister is 6 point currenty, 7 points starting in March). So you are looking at $7.00 for one TT ride next year. The Ristbands will go up from $24.95 to $29.99 this year. That looks a lot better now than the point system.