Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

Recommended Posts

Posted

BREAKING NEWS:

 

Today, the media from all over the state were called in to the old, run down Westchester Studios for an important announcement. The whole press was filled with excitement, as something big was happening over at the studios. As the media arrived, they were caught completely off guard. The old, cracked pavement of the parking lot had been repaired, and the whole lot had been landscaped!

 

Also, an enormus stage had been set up, and it was where the announcement was to take place.

 

At 12:00 Exactly, the president of Westchester Films walken on to the stage and announce the all-new theme park, westchester studios!

 

He said this, "This park will be built right here, on the site of our original studio. Everything will be rennovated to its former splendor, and we are excited to announce that we have purchased even more land, so that this park will be as perfect as we can get it, and expansion possibilities will be great. Everything will be state-of the art, and it will be heavily detailed. The best part is that as nthe park is being build, the media will be allowed on the construction site, to see just what is going on. Of course, the media will not be allowed everywhere, so that we will have more than a few surprises on opening day. Until then, I hope that all of you will enjoy watching this park rise out of the ground, and have a nice day."

 

The next surprise the president had up hgis sleeves was a fair, brought on to the grouds, and set up just for the media.

 

Everyone important was there, including Rob and Elissa!

 

They had this to say about the announcement-" We are definitely excited at the prospect of yet another amazing park in California, and the entire presentation was just outstanding. All the rides at the fair are really fun to, except for the mouse, which spun a little too much!"

 

Check back soon for more updates!

Shot0069.jpg.4a7874c6c318d7b4220d3be03e2b7898.jpg

the spiffy new parking lot

Shot0072.jpg.9091a2e588f8584b14a1a27523d10374.jpg

overview

Shot0070.jpg.a171dae942185ee87e770aaeb725c4ed.jpg

The fair!

Shot0066.jpg.c3cee178dbe4d08ac90ee654d7fb4e12.jpg

bleachers

Shot0067.jpg.914926070bed9557272f5d4158a3f21a.jpg

Shot0065.jpg.ee946f11a7111f67663046bd9a9b47f1.jpg

The stage

Shot0068.jpg.b78326267588b82c6a173af4b2e1d744.jpg

What on earth?

  • Replies 59
  • Created
  • Last Reply

Top Posters In This Topic

Posted

well, now everything gets torn down, to make room for construction-

I'm starting it over, because apparently that scenario got a glitch, that wouldn't let me build ent./exits to the rides

 

But, i needed a bigger parking lot anyway, so it's no big deal

 

EDIT:

 

News of the construction caries on, and today the park finished it's all new parking lot.

 

The reall coverage of construction will begin soon, now that the media are able to get to the park.

Shot0073.jpg.dac2100e852409166e1da133b50079a1.jpg

Shot0077.jpg.9b3f5fe37672a9076d3c7d00b9785947.jpg

Shot0076.jpg.71ceea290a2993510cf801f65597b427.jpg

Shot0075.jpg.25e851bc8316198c213d3d09c53ac032.jpg

Shot0074.jpg.20cc8d88b1b64b36f707c28bcb07c220.jpg

Posted

Well, now that the media has acces to the park, updates will be in full swing. Expect more on the weekends than weekdays, as school will get in the way.

 

The park gate has started construction, and it should be done by around 3:00!

Shot0079.jpg.50dc5cdb56ea70fa59a0a5cbba202d32.jpg

What will it look like? We'll soon find out!

Shot0078.jpg.6e4aeca678b36678f2fb8831f5ad8229.jpg

The media is all here!

Posted

Sorry for the double post

 

Update!

 

The park gate is now finished, but there are some rumors that a mystery painting crew may come to the park and paint it differently, depending on public reactions

Shot0082.jpg.1c431575f556c61b5ea3a594bf31b16c.jpg

Shot0081.jpg.d493bb7e35cd6a77e9d13efc99380c49.jpg

Shot0080.jpg.1f0a1f5f0a733759c1ab988867874f29.jpg

I love this theming

Posted

It has been said around the construction site that the next phase of construction will be on Director's Village, the entry land

Posted

once again, sorry for the double post, but I had no homeworks, so I had plenty of time to work on the park.

 

More News!

 

It seems that the park is going up much faster than expected, and Director's Village is almost complete. The different rides in the area include the Backlot Adventure Tram, and Private Jets. As of now, the media has no other information on what may go into Director's Village, but as soon as the media gets any information, be sure that it will be announced here as fast as possible.

 

Until then, shots from Dirctor's Village!

Shot0104.jpg.7b38d6007e4baa29c9db3132237e5b78.jpg

An Arial shot taken yesterday by helicopter

Shot0099.jpg.44ae12ef8e6a1f13966c211bc98a5129.jpg

Jaws! (I love exclamation points!)

Shot0096.jpg.cc946131a660062c8945bb7b9af6d73c.jpg

Wild West!

Shot0095.jpg.1a8c2d67666c5737a00eb6e3320566ba.jpg

City!

Shot0094.jpg.26ee68c95ebf439f2dd70ca57a0e4444.jpg

Dinosaur attack!

Shot0093.jpg.0fb26b643612f088d536cf768534f8ef.jpg

One of the many adventure sequences along the ride

Shot0092.jpg.5227708356c0100bbdfe65dcb7752bd4.jpg

The many different Westchester produtions

Shot0091.jpg.d0ef7bd929b9cfa91ae0bf7531688c48.jpg

Overview of Tram

Shot0090.jpg.813433398cee59884e2e121440d56206.jpg

Exit path

Shot0089.jpg.2037cf493bf7b2db774a703c173c5f49.jpg

Station for Backlot Adventure Tram

Shot0088.jpg.8941de1c2de4eaa1df2c89a8dc10565e.jpg

Overview, as of a few months ago in construction

Shot0087.jpg.59f69f0e6c216fb28cf4928294940b0e.jpg

Shot0086.gif.74599f8e7e36816b52b20f262584c13c.gif

each building has shops and stalls

Shot0085.jpg.33f9e198bb37d092de46292bacc2d50d.jpg

Shot0084.jpg.da879d64760bcada59e06657f5826af2.jpg

As you get into the park, the amount of arches drastically lessens

Shot0083.jpg.f879791d4bf321323324b77c59d0bc5a.jpg

Welcome to the park!

Posted

^For the POV's, the media will only be aloowed on the rides durring media day, which will be right before opening, so our representatives will be taking full POV's of all rollercoasters, and any rides requested by the public. Then, for opening day, our media crews will be all over the park, making a hopefully awesome video!

Posted

YAY !!!!! I can't wait to see a video of the Backlot Tram! When you take a POV of that kind of ride with the effects triggered, are those effects captured in the video? Example: the Jaws Scene, will it be possible to watc that happen from the tram POV?

Posted

I will film the POV from above the tram, so that all the effects can be seen

 

Also, though I will work on it this weekend, construction will not be updated, as our media crews are in Virginia and at BGW, making a park/trip video!

 

Unfortunately, no POV there, since I lost the email to the guy who would get me permission, lol. But that's not to say that I won't get it back, eventually!

Posted

Well, It has been a while, and BIG things are happening at the park.

 

Superhero Central is now in the process of being constructed, and the media has so far been somewhat restricted in what they are allowed to show. There were only 2 pictures that the media is allowed to show, and the name of the ride they depict has so far been disclosed. Maybe you can figure it out!

Shot0110.jpg.1274d295dad0b84320d1f79c22451c13.jpg

Shot0109.jpg.0473501aff77116ab961cfb61f5c5a70.jpg

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.

×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/