I was there on Monday and Hades closed down about 10 minutes after I got a ride in. One of the ride ops said, "questionable to be open later today, DEFINITELY open for all of tomorrow. I decided to hit up Avalanche at Timber Falls later that night and there was the kid wearing an orange shirt that was gonna ride till he got kicked off (one of you guys?!?!). I was able to get 15 rides on Avalanche in the last hour in which I was there, plus some rides on the flume.
I was at Mt Olympus yesterday too, and Hades finally opened up round 6 and I was able to get three rides in. This was my first time back to Mt Olympus since it became Mt Olympus, and let me tell u, the ride ops there sucked worse than a cheap vaccum cleaner. I just couldn't believe the lack of caring each one had for their jobs. There was only one ride op for Pegasus, Cyclops, and Zeus. The guy operating Pegasus was even wearing his headphones! The op on Zeus would frequently forget to hit the brake button and train loads would run through for another circuit.
My first ride on Hades after highly anticipating it for 2.5 years, and all I can say is that they should've put in a second train.