Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

mightbeawannabe

Members
  • Posts

    822
  • Joined

  • Last visited

Everything posted by mightbeawannabe

  1. These are great! You have inspired me to build my own (let's see ho long it takes to get that one done) but is there a less visually obstructive way to attach the trains to the track similar to the K'nex micro cars? I looks pretty solid as is but a little silly with those beautiful Schwarzies.
  2. I ordered a pepperoni pizza today, the receipt said it was a meatlover's, and it turned out to be cheese. Weird, huh?
  3. I have been reading this whole thread and must say it's a fantastic park! Definatley the best I've seen and even better than shyguy's Wonderworld! Congratuations on such a great park!
  4. ^^Sorry Larry, I wasn't in a very good mood that night. I had a terrible headache ^That's what I saw but I found another site saying Phase II was supposed to be done by this season. They had a map featuring those slides that weren't in the main site. I figured that the site hadn't been updated for this season as they had the 2009 map on the site. I had a pretty good time but there wasn't enough to constitute a $32 addmission. I should've done the 3:00 til closing deal. It wasn't finished anyway so I asked a stupid question I guess. There were slide section parts near the park so...hopefully by next year
  5. Well...gee thanks for all the long-winded replies.
  6. Maybe if you typed in themeparkreview.com in Francois...: avisparcàthème.com
  7. ...opened a loophole in the space-time continuum that...
  8. I wonder if anybody went to USF... bet it wouldn't be crowded there
  9. ^^Don't standup trains have a higher heartline? I know that in Newton2 the heartline of a floorless is 1.3 and standup is 1.6...whatever those numbers mean.
  10. ...completely obliterated the spaceship, send fragments and shrapnel back to Earth....More specifically Indonesia... Not good at this it all...
  11. It was 1988? I thought that was the year they left Intamin, and then officially founded it in 1989. I am aware of their early attempts at the inverted but I wasn't thinking when I wrote. You learn something new every day.
  12. Don't know if this is the right forum, but here goes: I will be going to Schlitterbahn VV in KCK this coming weekend and I would like to know if Phase II has been completed as stated for 2010. Phase II included a second slide tower in the water park that had Comal Express, Der Bahn, and Loopy Luge slides. I don't know what else was included in that phase. I can't find any pictures of that area and was wondering if anybody knew. Thanks in advance!
  13. Are these pictures .bmp? They take forever to load (am I alone?). .jpg files take much less time to load for me. Anyways, it looks good! The hotel seems a bit 'off' to me. Not sure why though. Some things don't add up. B&M was founded in 1989 I believe, and that doesn't leave them much time at all to complete the designs for a working prototype, much less fabricate the pieces for it. They started with Intamin trains Intamin designed track, so it wouldn't take them long to launch Iron Wolf and the Vortexes. Desining their own trains, track and means of supports would take a few years (say by 1991) and then a year to fabricate and open it (1992). I guess it'd be safe to say it was an Intamin prototype though. It's your park though, so I don't really need to care about the small things
  14. English: However, the page is in German. Deutsche: Allerdings ist die Seite in deutscher Sprache. Español: Sin embargo, la página está en alemán. EDIT: (to Below) But he is Spanish.
  15. Oh, by no means did I expect you to modify it! I was only asking because it was a CCI style woodie. Most of them had them when built, but were later removed (Mega Zeph RIP, Villain RIP).
  16. I like your project pics thus far but I think you should just post them here anyway, even if you did provide a link that is safe. I know I hate clicking on links that I don't know about.
  17. let's just talk on chat and get back on topic.
  18. ^Yet you can play the viola and violin? That's two different things as well. You're bowing and moving your fingers to create chords. A piano is played by two hands playing chords and feet adding effects. How accomplished are you at the bowed instruments?
  19. Oh....So is viola your only instrument?
  20. If it cost you $600, why isn't it the full version? I know there's not a Sibelius 7.
  21. And why would you need a professional composing and notation system? You're 14, and can physically play 1 instrument.
  22. ^Sibelius 6 has that many? Hmm...How much does it cost?
  23. Whoa, Wait! Don't stop this project yet! You can incorporate the heartline with Newton2! It's a steep but short learning curve to get awesome coasters that will always be heartlined. You can visually see what your doing with the sliders and it works great if your on the lazy side (why do you think I have it?). It's free and is one of the best and most powerful tools ever! P.S. No way to see max G's but Newton2 lets you control them and shapes the track around the forces and bankings. There are tutorials from the guy who made it on Youtube! His username is Entropy or something like that and he tells you how to make elements quickly and easily. Start watching #1 and go all the way through to the last one. It gets the ball rolling for you!
  24. Why the 13th? A reference to a movie? Or a day before another coaster event, perhaps? Anyway, I can't go on that date as it conflicts with our marching season's final rehearsals for the first football (boo!!!) game. What about another date? As in on a weekend?
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/