Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

coasterkyle

Members
  • Posts

    568
  • Joined

  • Last visited

Everything posted by coasterkyle

  1. It's basically is this your final answer button.
  2. Only last year was and from what I heard wasn't very well recived by OSU, the two years before that it was held the Friday before opening day. ps. Valravn is how it's spelled not Valravin.
  3. They want to know how long they waited total. That's why they scan it before you enter the line and once you reach platform.
  4. The train going around 100 times is a CF policy not IROC.
  5. They were installed for the 50th anniversary in 2014
  6. Or as they say The Valravn. Adding The to the front of coaster names really is one of my park pet peeves. What about The Beast or The Voyage ? Rides that officially have "The" in the name.
  7. Lines will be non existant but don't expect to ride anything.https://www.cedarpoint.com/hours-directions/cedar-point
  8. They have other types of kiosks around the park , caricatures, face painting, bracelets, shadow portraits, etc.
  9. In the periscope Tony said it will be a Kamans art shop (yet to be determined of what exactly what type art they will do)
  10. This ride has had so many things complained about, from the lack of a tunnel or splashdown, the name, the color choices for the track and supports, the restraints, 8 vs 10 seat rows, now the station. I can't imagine what is going to be next.
  11. Processing in has gotten more streamlined in that last few seasons. No more first come first serve, they give appointment times same with wardrobe and any HR training. My advice for processing is make sure you have the online paperwork filled out and the things you need when processing in are the 3 pages of "additional paperwork" printed out. You'll also need an ID and social security card. It's a fairly simple process then what it was before. Also make sure you're in grooming guidelines before going to HR. If you are going to have facial hair (new this year) you must have it trimmed and started before processing in. (You will be asked to shave if you try to start it after). I hope this helps
  12. Has anyone that is saying CP is running out of room seen Grona Lund or even Knott's? Not only can they build up and over things but rides don't last forever.
  13. Maverick has stagered seating like that as well, the second row of a car sits a few inches higher then the first and shifted away from the center more then the front row.
  14. Beacuse everything in a rendering is actually going to happen. Maverick's rendering case and point.
  15. And I thought the Boat conversation in the Cedar Point thread was bad. Some of you make it out like the world is ending.
  16. Me personally I would not put forth the money for this, as there is no way to guarantee that would not be working during some of those events(you do get 1 day off a week).
  17. Looks like the start of the wall that was in the rendering
  18. If I remember correctly, basically entitled people ruined trips to the point, it was worth the hassle or stress to set the trips up.
  19. I feel like old school flume are going the way of the Dodo. When was the last time a band new flume was put into a major park? And if they do put one it is can almost be 100% positive it will have some type of restraint on it. Sorry for being so negative, just basing all this on what I see in the industry.
  20. That looks fantastic, would there ever be a chance that you would upload your park? It looks spot on from what you can see in that video. Great job.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/