Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

KDcoasterMAN

Members
  • Posts

    935
  • Joined

  • Last visited

Everything posted by KDcoasterMAN

  1. I love how realistic in the terms of fullness this RCT park has. I wonder what the next coaster will be? I predict either an Arrow multi-looper or a a "new" Vekoma Boomerang? And there is the new Intamin standups.
  2. The color scheme is nice. The blue and silver goes along with the theme very well. I wonder if the track being used is a new premier design. It lacks the diagonal bracing some of its previous models had.
  3. According to Clint's latest update (and probably last) the train(s) have arrived at the park. But. The park is not going to let us see them. Not until April that is. They will probably do night testing to prevent anyone form seeing the new trains.
  4. This is a great addition to SFMM. It's a nice addition to MM's small lineup off family coasters. The name also fits the coaster as well.
  5. I first saw this when I was seven. I never got the message back then... Ofcourse the only part I remember is the name and the cartoon section.
  6. I Will Not Bow - Breaking Benjamin
  7. In the last few weeks I have seen The Princess and the Frog which will remain as an additional Disney classic, Sherloch Holmes, which without Robert Downey Jr. would sunk like well.... a ship. And I did see a little movie starring a few 9 foot tall bule aliens... AVATAR is amazing. See it in 2D, see it in IMAX 3D. To my account, it is probably one of the greatest films of the decade.
  8. Mine is a color stylized pic of Intimidator at Carowinds. I just like the look of that hyper and I found this pic and couldn't refue it to be my Avatar. The pic is courtesy of Wormy at CarowindsConnection
  9. Now that Kings Dominion has the second Giga in North America... ...what new attractions would be on your wish list? >Replace Hurler with a GCII woodie along the lines of Terminator: Salvation >Remove the Shockwave, Slime Zone, Showplace Theater, and Space Surfer and build a Zamperla Spinning coaster and new outdoor kids amplitheater. >Remove Avalanche a build Intaride Flume similar to Shoots the Rapids with better Congo theme >Remove the Go-Karts and build a Teacups ride themed to barrels like what Intamin offers. >build stage infront of the Hypersonic Haunt building. >Remove majority of the asphault and make a sitting area similar to Universal's new stage next to HRRR. Include a children's water playground >Build a Whirlpool slide and "nitro" racer slide in South WaterWorks >Make a second WW's entrance near Ricochet New coaster types I would like to see come to KD... >Intamin ZacSpin >Intamin Wing Rider Launch >GG Hybrid Mega Woodie
  10. I was 6 when I rode my first coaster, Scooby Doo's Ghoster Coaster, at Kings Dominion. Never really gotten into coasters until riding my first looping coaster, Shockwave, at age twelve.
  11. New pics up on the Intimidator picture gallery. Shows off queue construction and the new train! ADMIN EDIT: I'm going to go ahead and remove this link and properly embed the photos mentioned above in the next post.
  12. I think pull throughs are necessary but totally a parks desgretion. If I'm correct, Kingda Ka only had the board used. . I would think that Intamin would "recommend" a pull-through on I305 due to its tight transitions.
  13. If the KD crew does the pull through like Mavericks... ...it would look likt this. From the Maverick Constrution gallery. http://www.cedarpoint.com/public/park/rides/coasters/maverick/?modeSet=gallery&gallery_name=construction_gallery Courtesy of Cedar Point. Pull through
  14. Brian, Clint's Photo Fiend, denied the fact that the "mysterious" tarped object was in fact a train. Also, I believe they would arrive in more of a manor such as the Carowinds trains did. Via shipping container.
  15. The next few weeks for I305 should be interesting: - The new gift shop/ photo booth build begins vertical construction. - The queue will begin taking shape (which it already has) - The trains will arrive by week's end or next week. - The pull through begins - electrical work continues Optimistically, We'll begin to see cycling by Early March.[/code]
  16. My second picture given to me. New Resized picture of Intimidator 305 Resized Picture from before
  17. Its great to here ya'll liked the pic! A friend of mine sent it to my inbox and suprise the H-E- Double hockey sticks out of me!
  18. I present some ariel completion pictures of Intimidator 305! Edited to acceptable 800x600 size to conform to TPRs TOS
  19. What? I have not heard that on Facebook or Twitter. HCL, do you know Pagel Personnally?
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/