Nobody can blame them by taking the more safe ride this time.
When you saw how many issues they had with VH and the costs which increased dramatically.
And they still have Hartenhof which they mentioned is still scheduled to be done before 2020.
Still I hope they will create something unique around the ride or even a unique layout.
Basically what they said is that it will turn out more as a coaster than Krake and will be longer (though even 1 meter can be count as longer)
On Dutch coaster fora you already see people take the park map and draw sections with possible locations, some could turn out very nice.
But locations which have been rumored by various sites are all denied by Efteling as of yet.
Latest rumor is that it will feature at least 1 inversion + floorless trains.
Am just stoked what they will create and what tale and environment they will put it in.
Can say No to all.
Why should I keep buying the latest stuff when my current tech works for me?
Rather spent it on other things which I count more important.
Coasters are available for the devs themselves so they have them but want it completed enough before we will be able to ride/construct them ourselves.
Thinking it got pushed back several times before it even got on Steam it's difficult to even give an estimate.
Most surprising was definitely Monuments Men, expected it worse from various reviews but I kinda liked it.
Non-Stop was just a nice action flick
300: 2 was just an action gorefest, nice fight sequences and CGI but less than 300 they could have done much more.
Robocop was definitely less than the original but if you don't compare them it's an OK action movie.
Went on kinda a movie spree last Saturday.
Watched: The Monuments Men, 300: Rise of an Empire, Non-Stop and Robocop in cinema.
Always good scheduling a day in cinema ones in a while.