Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

RollerCoasterAwesome

Members
  • Posts

    96
  • Joined

  • Last visited

Everything posted by RollerCoasterAwesome

  1. Can't really answer why the park runs one train but I can speculate. -Don't care about the ride -mechanical issue / restraint issue -Park pulls two trains for maintenance and forgets about the trains all summer -Park falls behind on maintenance for other rides and Scream not being that popular is stuck with 1 train operation. -Another park borrowed a train similar to Great Adventure borrowing one of Riddlers trains for a few years (this is unlikely but possible) -Oh and did I mention the park doesn't care about Scream Unfortunately that wont happen and Scream is average at best it wasn't even supposed to go to Magic Mountain.
  2. ^^It's the pirate ship ride across from the entrance to Goliath.
  3. You mean the MCBR then yes, Goliath always slows to a crawl on the MCBR.
  4. ^I know you didn't ask me but Freefall was dismantled in February of 2008 and stood non operational from 2005-2006. So the park was without a drop ride for four years. Personally I enjoy Lex Luthor: Drop Of Doom more only for the height and the sway from Superman but Freefall was a pretty awesome drop ride when it operated. Just my two cents.
  5. ^Hopefully this helps answer some of your questions. X2, Tatsu, and Full Throttle are all good candidates for single rider lines. Yes the lines can be some of the longest during Spring Break. This is simply an estimate - X2, Tatsu, Full Throttle, Superman (one side), Riddlers Revenge and Goliath 1 hour + wait (could get up two hours) Lex Luthor, Green Lantern, Apocalypse, Batman, and Superman (two sides) 30 - 45 minute wait + Viper, Revolution, Goldrusher, Colossus, and Scream walk on - 20 minute wait + Since your going on a Tuesday I don't expect the lines to be too bad although they can vary day by day. Also the general wait times above where based around wait time from April of last year. Some of the wait times above could be shorter or longer. Also note that Colossus and Batman could be running backwards during your visit and could result in longer lines. Batman 1 hour + and Colossus 30 - 45 minutes (If the rides are running backwards) Hope all this helps!
  6. But most Disney attractions do have a very high capacity..
  7. The fourth kiddie coaster is not for the target audience but Batman and Colossus backwards are.
  8. Expect the park to be pretty crowded, holiday weekends tend to be more crowded then normal weekends. Expect most of the major coasters to have an hour wait or more depending on the crowds. Yes there's been some activity in the water park but nothing too noticeable. Mostly preparation work for where the Bonzai Pipelines are going.
  9. Nothing major just preparation. Red - Will be demolished or already demolished. Light Blue - Could possibly be demolished Purple - Ride relocation (ride is moving over by Road Runner Express) Green - new coaster 19 (don't quite now where its going but somewhere inside the green area) Ride relocation Concrete already poured for the ride relocation.
  10. This is all that will remain of the High Sierra Territory theme after the remodel of Mooseburger Lodge.
  11. Not to mention the cost of removing the 80 foot foundation/underground structure if it needed to be removed.
  12. ^Sky Tower wasn't closed last year during the off season. I think the ride just needs some maintenance probably some work on the counter weight/elevator cables. Sky Towers removal is just a rumor there's no evidence pointing to the ride actually being removed.
  13. ^The removal was announced but the ride was already closed when the announcement occurred.
  14. No way a roller coaster would replace the Sky Tower and the museum was removed a little over 3 years ago. What if it's a Poler Coaster? An observation deck at the top with A/C and another coaster credit? First of its kind on West Coast. Thanks for the info about the museum! Great idea but unlikely considering the cost. Maybe a small 100-150 ft. version but still those Poler Coasters don't come cheap the building is a large portion of that cost. Also I don't see Six Flags corporate spending that much money on a coaster/observation deck, but again great idea although I think this type of ride is out of a lot of parks budgets.
  15. No way a roller coaster would replace the Sky Tower and the museum was removed a little over 3 years ago.
  16. Well the website says Sky Tower is temporarily closed until March 22 the same date I've heard would be the supposed debut of both Batman and Colossus backwards but only time will tell.
  17. ^With Sky Towers close proximity to Tatsu and the space required for such a ride it would be interesting to see if such a ride could be built in that area, but I don't think Sky Tower is going anywhere anytime soon. Then again Sky Tower could be demolished without a trace similar to Log Jammer.
  18. The park should not be too crowded expect at least an hour wait for Full Throttle, Tatsu, and Goliath but at most 30-45 minute waits for most of the other rides. The park can be unpredictable around this time some days the parks dead others its packed.
  19. Sorry, you're correct I refined the location of the box.
  20. ^From the announcement, Two slides and they should look identical to all other Bonzai Pipelines I've heard the slides would be located right here.
  21. ^^Waits should be fairly reasonable only Full Throttle and Tatsu should see hour waits at the most (probably less). Crowds should be fairly reasonable as well most rides should see 30 minute waits at most but you could get lucky sometimes the park can be dead on that Monday.
  22. Mini update from yesterday Here's another angle Maybe a new slab of concrete And nothing to report over by the tree So yeah, its for somthing Anyone know what's happening over by Road Runner Express
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/