Or Hydraulic Launch shed?
Or a structure from which to operate the new coaster and the surrounding areas various lights and mechanics.
I really hope this isn't launched....
Do you really need 700 Sqft for all that? You operate the coaster within the station, no shed required.
Don't forget water pumps and filtration systems require a lot of power to operate as well. Besides, 600 Square feet isn't really that big-- 20' x 30' to house electric and probably the computer system is about average for a large coaster.
Yay lots of quotes!