-
Posts
224 -
Joined
-
Last visited
Everything posted by lorddoonga
-
God forbid they do any major track reprofiling. If it had just maybe additional XXX mph to make it around the 3rd hill. Or as the worker said yesterday, they might need to make a 1/4" adjustment opening the track where it gets "stuck". My first doubting impression when I viewed Bullet in person was exactly the lift leading into the 3rd hill. If you can go there and have a look, you can catch a view at the neighbors house behind Bullet, their driveway adjacent to Bullet and ends at the structure. Looking at where the fences meet (the corner) look above the fence through telephone wires and tree branches and you will get a look at the track approaching the 3rd hill. It takes a small steep dive and right into a steep ascent. When I saw that I wondered how in the world was Bullet going to dive below "sea level" so to speak and successfully make it all the way up to the turn around. The third hill will be big suprise drop whenever they get it going.
-
"Coaster -"They've stopped at the top of the hill before. I think there is video somewhere of workers pushing TTD over the top." Do you happen to know the link? "Fisherman -"Oh how depressing...and it must be kinda embarrassing for the designers. I wonder what is really going on? Maybe it is windier up there than they anticipated? The wind off the Bay can be pretty gusty. Is it common to have to tweak the track guage...that much??? Oh boy... We were gonna go out there but thought for sure they wouldn't risk another failure with all the crowds watching...oh well... -Derek" I read that back in the day, the gulf south wind caused Texas Cyclone to valley on the second hill enough to the point that they modified the track and lowered it some 2 ft.
-
The wife and I spoke with one of the hispanic workers. He told us that a crane would be used to take it (2nd train) off the track. He also mentioned that they were going to make a 1/4 inch (I guess under and not over correcting) widening adjustment of the track right there where it stopped. He said the time that it should take for bullet to leave the lift hill and reach the 3rd hill should only be 16 seconds. It was so hot and humid out there he was sweating up a storm. His last comment to us was, "We're fixing to have a meeting."
-
I was out at Kemah today with out of town guests. When we left the lift chain was operational. Police cars were at the location. Ahhhhhh... another test run. Thanks to clouds in the background you can see the train once again on the same turnaround as last time, only this time stopped by anti-roll back track. Sigh.... Anti-roll back works
-
I seriously doubt the company building the ride would leave before it is running.... Not being mean but the past few days the people working on the ride are mexicans, Maybe locals. The crew building the structure might be gone. You are right. Vlemicks crew was comprised 1/2 mexican and 1/2 canadian nationals, with a few Americans. Possibly some of Vlemicks stayed behind to ensure a job complete and well done.
-
Who wants to join together from the forum and ride together? Select 1st (blue) and 2nd (red) choice. Drawing deadline Sat., Aug 11. 1. ______________ 2. ________________ 3. ______________ 4. ________________ 5. ______________ 6. ________________ 7. ______________ 8. ________________ 9. ______________ 10. _______________ 11. _____________ 12. _______________ 13. _____________ 14. _______________ 15. _____________ 16. _______________ 17. _____________ 18. _______________ 19. _____________ 20. _______________ 21. _____________ 22. lorddoonga______ 23. _____________ 24. lorddoonga______