Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

lond

Members
  • Posts

    503
  • Joined

  • Last visited

  • Days Won

    6

Everything posted by lond

  1. The Swedish Accident Investigation Authority will do a investigation on the cause and what to do to prevent it to happen again: Fire at Oceana Waterworld in Gothenburg Today I went by Liseberg/Oceana to take some photos of the aftermath of the fire... When standing outside you realise how extensive the damage is on the water slides and the main building I will not fly my drone over the area due to the ongoing investigation and that there are "no photo"-signs on the doors to Oceana. I will probably not post any more photos until they start the rebuild of Ocenan... All the best for Liseberg and to let them take care of their employees.. /// Marcus And from a distance:
  2. Here is Liseberg English press room about the fire: Liseberg pressreleases about the fire @ Oceana And in the Swedish press room there is a pressrelease that the executive board of Liseberg that the ambition is that Oceana shall be rebuilt: Oceana shall be rebuilt /// Marcus
  3. I will follow the investigation closely... It is very concerning that the slides can burn with this intensity.. /// Marcus
  4. On the page about the JetLine accident: https://www.gronalund.com/jetline/olyckan Gröna Lund say that JetLine will be closed during 2024. /// Marcus
  5. Just got the news that a fire have started in Lisebergs soon to be open water park Images from GP: It was reported that some loud bangs when the fire started... /// Marcus
  6. Good news: The construction of Oceana has come that far it's time to fill it with water all the 1,200,000 liters..... Press release /// Marcus And finally a new page in the thread
  7. Liseberg decided that the Christmas season for 2023 should end 2024-01-07 and that I'm still on vacation, I went to visit the park in the nice cold weather we have now after the storm passed. All attractions that was scheduled to be open was running and people was riding them despite that it was -6°C when I arrived to the park and it just got colder (I have -12°C @ home right now).. Liseberg had staff going around the park and deliver HOT coffee and tea to the rest of the staff that was working on the attractions and all the games due to the cold weather. The guest/staff ratio in the park was around 75/25, the amount of guests will increase the last 3 days of operation of the Christmas season.. /// Marcus All the water slides are assembled and the parking was now empty of parts.. The countdown to next Christmas has started, only 355 days left.... Perfect placement of a Christmas tree Santa gift workshop believes in YOU... Last year delivery route. I hope the ice is gone when Kollerado opens... Nice igloos around the ice skating rink Mmmmm... More Suovas kebab, this time with elk...... Flash... Who want to ride in this seat?? More flashing... I went in to the lobby of Hotel Grandiosa to warm up a little bit before leaving.. Where you can by the book with history from the first hundred years of the existence of Liseberg..
  8. Dam auto correction I mean ELK, but now I know that at least one reads everything in the post..... To bad I don't get any notifications when someone responding on a post anymore If someone want a quick response, send a im on twitter or use my callsign SA6LON on the HAM radio network.... /// Marcus
  9. Visited Christmas @ Liseberg after attending the early electronic and technology auction held by the ETA section @ Chalmers University of Technology. It was perfect conditions with subzero temperature and real snow in the park (photo date: 2023-12-02). In the station of the Liseberg tower Liseberg had arranged a 100 year anniversary exhibition with memorabilia from the first 100 years of Lisebergs existence. Due to the cold weather and real snow it was a lot of people in the park. The food highlight: Suovas kebab (reindeer & mouse with cabbage and lingonberrys in a pita bread and HOT blackcurrant juice to drink) Here is the perfect Christmas themeing... A model of Liseberg when it opened 1923 Some creepie park employees... The spacesuit the rabbits had when they crash landed in Liseberg.. /// Marcus
  10. I start first with Halloween for the consistency.... (photo date: 2023-11-05) First some photos of the progress of the Oceana build: Then we enter the park and wait for it to get dark.. German mobile haunted house Getting darker.. The new illumination of Balder is really nice Come and play with me... The World Of Volvo-building looks great in the dark.. /// Marcus
  11. I downloaded everything that was on my camera and realised that I didn't post any photos of my visits to Halloween and more resent Christmas @ Liseberg + some "drive by:s" At least 2 post with 100+ photos in total to post... I hope we can switch to a new page soon
  12. Visited the yearly book fair in Gothenburg last weekend (when I also took the latest photos of Liseberg) and I found this book at one of the exhibitors: They have it available in both Swedish and English if someone is interested. It's almost 2kg of the history of Liseberg /// Marcus
  13. Haunted House: https://www.gronalund.com/skrackhus/skeppet /// Marcus
  14. 2023-09-17 I attended my work on the yearly family day @ Gröna Lund. The weather was sunny for a day in the middle of September. I arrived ~20 minutes before the stated opening time and the entrance was already open and the attraction was running, so in under 30 minutes ALL open roller-coasters was crossed of, some more then once JetLine (still no accident report released yet) and Twister was closed.. No cue Almost empty station Some preparation for the Halloween season or someone has docked a old floating Chines restaurant in much need of restoration on the waterfront of Gröna Lund??? You could test some programming tasks and a VR-assembly tour of the products my company produces. Not a lot of space left in the park... The strap is still there, alas a bit more sun bleached... So after a couple of hours in the park I left for some sightseeing of the rest of Stockholm. /// Marcus
  15. When I unloaded the camera today I realised that I totally missed the Saturday photos I mentioned in the last post..... But here they are + the photos I took today. My work had a family day at Liseberg and I ended up with a fellow roller-coasterfantast doing all of the roller-coasters and AtmosFear with VR-googles (even more mind games).. So first some random photos in the park: The guest service in the park have now moved to the hotel. Construction photos: And the photos from today: Liseberg is getting ready Halloween that starts on Friday 2023-10-06 The funnel will be massive And just a little side note, during the summer I have been working on the next version of my 10-DOF motion logger that I'm using to measure roller-coasters and other amusement park rides. Below you can see the size difference between the previous version (v 8 ) and the new one (v 10) (version 9 newer left the design phase): The loss in weight between the last one ( 73,5g) and the new (16,7g) is huge I have found some thing with the new unit that (might) need to be fixed, so version 10b is in the design flow, but some other project (and work) have priority... /// Marcus
  16. Yesterday on my last vacation day I went by Liseberg to take some new photos. Some tubing left to install: I hope that the turquoise ride don´t end like that Airtime: New photo spot: I hope that I get some more photos this Saturday. /// Marcus
  17. As for what Andreas Andersen @ Liseberg said they are not closing down Lisebergbanan at the moment, because Lisebergbanan share some technical elements with Jetline but is constructed one year earlier than Jetline. The biggest difference is that Lisbergbanan got new trains ~5 years ago... Found this image in a post on twitter: Someone could have easily got struck by the wheel assembly /// Marcus
  18. Just from the press information: Gröna Lund will be closed for at lest 7 days or for how long time the investigation needs. The rest of Park and Resorts amusement parks will at the moment remain open. /// Marcus
  19. Flumride will be running this year and probably also next year also, Liseberg is still early in the planning phase of replacing Flumeride with a new water ride with similar ride capacity / throughput.. /// Marcus
  20. And now back to present day.... I attended the media day (18/4) that was hosted together with ECC to make a dry-run of the park and the hotel and we had the task of reporting all the things that needed to be fixed before the grand opening.. During the day we got to attend the media pre-launch of Luna, a walk through of Oceana (opening 2024) and Lisebergs family day for the employees, in all a full day at Liseberg As always when it´s a media day at Liseberg it was a beautiful and sunny day. Still things to do before the park is opened... The view and details in the hotel is real top notch I don´t think they could have found a bigger bell.... Even an old carousel inside the hotel for enjoying guests on the rainy days Several conference rooms if you need to have a meeting And the slide in the lobby where kids in all ages and size can enjoy them self... The view from the roof top bar over the park is stunning.. Now on to the media part of the event (and to ride Luna for the first time)..... Going up the lift hill...... ...and going back down again Point of no return... Liseberg has really shoehorned in Luna in the space that is left form Lisebergbanan... All the small details... Back to the car to lighten the load of the backpack... And found a new viewing point from the newly opened parking garage beneath "World of Volvo" The new sign is assembled.. And while we waited for the construction tour of Oceana, we were allowed to stroll in the empty park in the sunny and warm spring weather... The upgraded South entrance of Liseberg Kids in all sizes and ages.... On to the construction tour of Oceana: It´s huge inside.. After that I did walk through the staircase and corridors of the hotel.... And was treated with all the small and big details Liseberg had put in to the hotel. I found this room number and also rooms 217 & 237... And the Liseberg was opened for the employees and families. No water in the harbour.. The Luna observatory: On the last ride of Lisebergbanan the train stalled at the very top of the lift hill and after some faultfinding we was rescued and had to walk the lift hill back to the station... While we waited all the cameras in the train was deployed and we got some nice views of Helix zooooooming by After a couple more rides on Helix it was time to go home.. The hotel looks really good in the dark Someone had already littered the new Liseberg sign with a rental E-scooter And a photo of "World of Volvo" that will open next year.. Luna will be a big compliment for the park and the guest that has something more to ride beside Lisebergbanan before they are big enough to ride Balder, Helix and Valkyria... Big thanks to Liseberg and ECC to arrange this day. Liseberg also released the information that Flumride is in the end of its lifespan and will be replaced with a new in the near future... /// Marcus
  21. I realised that I have missed to post any photos in the thread between last time and now So here is a catch-up post before the 100+ photo update tomorrow /// Marcus
  22. Perfect timing Liseberg has released a status update that almost al tracks is assembled: https://www.youtube.com/watch?v=ub3xniFAeBg /// Marcus
  23. Bonus construction update During my visit to Liseberg I accidental bumped in to Andreas Andersen that was on the way to give @Eftelflags (twitter) among others a construction tour of Luna. A BIG kudos to Andreas and Liseberg to let me tag along on the construction tour The roof of the water land on the way to be finished. World of Volvo-building looks impressive, but it's more spectacular in the dark.. It's really close to de building.. Luna footers. More Luna footers.. Even more Luna footers, the top of the hill is riddled of Luna footers Station building Preparing for blasting for even more Luna footers?? We had to crawl through a hole in the fence to get to the Luna station building... Lisebergbanan will go really close to the station building The inside of the station building will have the same "steam punk"-theme as the rest of the "Luna Park"-area Rare "used to be off limit" view of Lisebergbanan. Even more Luna footers.... Here will the fun begin... Exiting through the same hole in the fence that we entered.. More Luna footer that is waiting to be installed.. Massive footer that is incorporated in the existing buildings.. The Luna Park-area will never be the same after next summer End of the tour... They are getting ready to install tracks as soon the park is closed for the season /// Marcus
  24. I took the last working day of the year of and made a visit to Liseberg for the last time this year. So lots of (random) photos from the park The sun shines its rays on Valkyria Only 359 days to the next Christmas Eve Weeee.... The Santa helpers are grumpy and sad that it's the last day of winter season 2022 at Liseberg. but they are happy that they can now rest for 9 month.... As a OHS representative at my work It's good to see that they keep a good working environment in the Santa workshop... Who have been naughty this year? Maybe NORAD can borrow this map for next season "Santa tracker"??? The new hotell looks really good in the dark. The interior of the "VOLVO experience center" look impressive. Happy New Year and looking forward to the next season that also will be the 100 year anniversary of Liseberg!! /// Marcus
  25. It's for warming (roasting ) visitor on and it's a box/tray with burning black coal in it... /// Marcus
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/