Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

Blake Hooton

Members
  • Posts

    42
  • Joined

  • Last visited

  • Days Won

    2

Everything posted by Blake Hooton

  1. There were mixed reactions about that announcement. Other than that i'm excited.
  2. Take these personal posts someplace else. We don't need to hear that talk.
  3. The new look for the freeway sign for Six Flags Magic Mountain is done. The panels are done being painted. The "Hurricane Harbor" name is now on the top drum, the lower drum now has a detailed gold motif. It also lit up recently. That ends its six month work of repainting and installation. I found this off of the park's social media they post it recently.
  4. Now the lower panels have been installed. I'm awaiting to see Hurricane Harbor name in a new font (to match to current Six Flags brand) on the upper drum.
  5. I saw that of the Iron Rattler test today as well.
  6. It's been three years since the last post on this topic. But Six Flags Qiddiya City is making great process so far. Getting closer to completion. It's looking really good on their park progress so far. Same with the AquArabia Water park (which is the official name of the water park).
  7. Now the crew working on the sign makeover is in the final phase right now which is the two drums. I think they could put the new font for Hurricane Harbor on the top drum and possibly could have a small circular led screen on the lower drum.
  8. No problem. With that almost complete. This combination of the current Six Flags and the retro Magic Mountain logo combination does pay tribute to its past and present time of the park.
  9. Now the current Six Flags logo (as separate brand) has been added, but on the top of the retro Magic Mountain logo and also small. I knew that was gonna be added, but i didn't realize it was gonna be gold/copper color
  10. Based on contractors stated, the Six Flags will to be on top of the name as i showed you that on of the golden letters.
  11. Goliath is about to reopen tomorrow after weeks of repainting and refurbishment.
  12. I will stay tune for more as they put of the final touches for the marquee at Six Flags Magic Mountain.
  13. Other than that, I'm very pleased with the marquee process.
  14. But it won't now since the first is under control with 79 percent contained.
  15. I await to see this finished. The Six Flags 2019 logo will continue on the parking gate and the plaza gate.
  16. I found this lettering. This will be on the top of magic mountain. The font will be for the "Six Flags" name. I'm not sure about the lower part. The lower part most likely would say "EST. 1971".
  17. The new lettering has been added. It's pretty much of a retro look.
  18. Yep. It is way away from the wildfires in Malibu and Santa Monica.
  19. I heard an update on the marquee, All Bright Painting has passed it on to Burbank based sing shop California Marquee by adding wiring for their new sign. https://www.tiktok.com/@ourmountainthrill/video/7458375422858792234
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/