Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

MrRC

Members
  • Posts

    244
  • Joined

  • Last visited

Everything posted by MrRC

  1. Better images (12-10-2018) : Seems they work on the coaches and chassispart Free Clearance : Empty chassis :
  2. Complete train incl mods is back on the track. Clearance profile is on the track (yellow)
  3. The backwards tilted coach is nearly the same as the lift-hill angle.
  4. [uPDATE] : New images, due the modifications :
  5. They took all the chassis off the track except for the bare chassis where I posted pictures yesterday. The individual coaches of Knott's Berry Farm (Boomerang), who were still standing by the container yesterday, are no longer present on the site. I assume they are inside to work on. The intermediate coaches (I call it "weight coaches") and the last coach with chassis are at a different place on the test-site, near the spike of the track.
  6. I don't know, never been on that rollercoaster. The picture has a lot of shadow over the coaches, simply i don't know.
  7. They removed the top-half of the 1st coach from the test-train : On the 1e coach "Boomerang"
  8. 3 rd September 2018 quick visit , nothing has changed
  9. I went for a quick visit today , still nothing changed. Seems they found something that was unexeceptable or they done finishing testing.
  10. I still keep an eye on this project @ Vekoma, but still no changes since last time.
  11. I had a quick visit at Toverland on July 10th , here is my off ride video of Fenix :
  12. Toverland has started to do a lil advertising during the Streetgasm 2000 rally in Slovenia :
  13. I know whats the plan with the pre-programming of the rotation, i'm working on that to demonstrate that in an NL2 version : (just an fictional version, nothing of the track is correct)
  14. New images Jun 5th 2018 : (a lot of cables and sensors added to the trains / chassis)
  15. Latest short video May 30th 2018 : (Some new sensors and wiring added to the train.)
  16. Here the latest pictures, situation from 12 April and on, they do testing, sometimes coaches 180 degr on chassis, sometimes covered, sometimes open.
  17. Testing has started, i noticed the coaches where 180 degrees on the chassis now, the train was NOT covered with the orange tarp. Its on exactly 365 days ago the first testing with the old F.L.Y. had started.
  18. a short video from today (7th april 2018)
  19. Maybe i do a visit on Tuesday, depending on the weather.
  20. Images from today (close-ups) : Just after taking the pictures, they putting the orange tarp over the coach. More pictures and info
  21. Started "spinning scripting" i got 1 coach spinning but I had to change the train a lil (not as it is in the real situation now)
  22. Yes as soon as i do visit them and seeing something thats worth posting, i will. After some creative ideas and brainstorming i came up with this :
  23. Updated my NL2 model with help from the latest pictures from Mar 16th 2018 : (Bogie made in SKU 14)
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/