My guess would be they start testing the ride Monday nonstop until Wednesday night when they can have the state inspect for media day. they will test it Friday and then have a ERT for season pass holders Saturday and Sunday. They will open the ride to the public either Monday after the ERT from 11:59-2 or they will open it Tuesday. This is just a guess I am not a ride operator or work for the theme park that is just an educated guess. They will probably have the time line on the next email we get on Wednesday.
-
I went to the park today but the usual wait time for any ride today was about an 45-hour. We go to ride X-flight first smooth as always we rode the left side. Then we rode demon and I almost lost my cell phone, it fell out of my pocket midway through the ride caught it mid air. Then we rode American eagle, that hade to be the worst roller coaster I rode today I it my head of the head rest and blacked out towards the end of the ride. Ten we rode batman we got the last train that was the best ride of the day even though I had the head ache from American eagle. To finish of the day we rode the Indoor batman and finished with Superman Ultimate Flight. Ten I bought a goliath shirt earlier on the day an I got the "golden Ticket" to ride goliath Sunday June 1 from 12-2 in the morning.
-
They have been working on the electrical for the last 2 weeks it not like they have to dig anymore for all we could know the electrical could be done already. Don't jump to conclusion thinking they don't have certain things done they could have them done and we just done (expect the obvious Topping of the hill and track, and the track for the Zero G stall).
-
Don't get me wrong I wont it to open to but I don't think it will be done in less than 3 weeks unless they really switch it into high gear next week. I'm not saying they are working slow but today it seemed like they didn't do much accept some wielding the brake run and some wiring but I couldn't see under or in the station so I could be wrong.
-
I went to Six flags today I got to ride X-flight, American Eagle, Viper, Demon and batman the ride by 2.The longest line today was about 45 min and I actually went an walked right on to American eagle and X-flight. Went to see the Goliath construction site they were doing the electrical and the brake run was half completed they were also wielding. I don't know what happened but there was an ambulance at the sight today. I think that goliath will not open until late June early July. Entrance Sign is pretty awesome when you see it You can see in this picture some of the Brake run is done