Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

rabid disney

Members
  • Posts

    313
  • Joined

  • Last visited

Everything posted by rabid disney

  1. My first ride has been push back to next wed 21st dec, but the good thing is if I went yesterday the inside parts would not be fully complete, so at least my ride will be more complete. Here are the offical facts that have just been released.
  2. Can I vote for beer. But serious if you guys voted for coasters you are not doing sex right guys. Its like this foreplay is a queue so have fun in the queue makes the time better.
  3. I don't want to wreck anything till you guys see this movie. Wow, I was blown away by the effects, emotion, and story telling I'm still stunned by the past 3 hours and very proud to call Peter Jackson a fellow New Zealander right now. All I can say is stop reading this and get to your local movies now. This movie gets 10 sheep out of 10 sheep. Reply when you guys have seen this masterpiece.
  4. ****HOT NEWS OFF THE PRESS***** My test ride is this wednesday will be the first train load ever. ride opens to public boxing day.
  5. Hi guys. This week update was hours spent getting photos to fit the right timing and elements. There is a awesome daytime one which I call fat vekoma chick making love to hot intamin guy. there are also some great night photos with 3 trans in one. anyway enjoy guys. http://ozcoaster.net/index.php?option=com_content&task=view&id=51&Itemid=2 Ian:)
  6. ^Thanks I think dreamworld have alot of work and need a bigger budget then they have to be able to complete with Wet n Wild H2o zone, I say let the water wars begin between the 2 companies but I think the company I work for will win. As for superman the general public opening date has been pushes back two weeks to boxing day. as the parks CEO wants the inside theming and effects perfect, which is a good thing. But my ride should be this week or next week.
  7. Waterpark are like weeds they grow really fast. Wet n Wild Gold Coast expansion is moving along at a great pace and with Superman Escape next door the landscape is just looking better each day. anyway here are the latest construction photos enjoy http://ozcoaster.net/index.php?option=com_content&task=view&id=50&Itemid=2 Ian:)
  8. Hi Guys while Superman nears opening next door at Wet N Wild H2O Zone is in full construction gear. enjoy http://ozcoaster.net/index.php?option=com_content&task=view&id=46&Itemid=2 Ian
  9. Great DVD Don. Ive just added a review at OZCOASTER. http://ozcoaster.net/index.php?option=com_content&task=view&id=45&Itemid=2 Ian
  10. Hey guys your favorite coaster drunk here. Anyway this week I appeared on Coaster Radio saying what im thankful for, And in typical Ian/Kiwi Boy/Aussie spy fashion I gave my opinon. So download the show guys. Right Click save target as on link. http://libsyn.com/media/coasterradio/coasterradio_128.mp3 Ian P.S I will be doing a full review on there show in a couple of weeks as I will be on the first ever superman escape ride when testing is finished. and Ozcoaster and Westcoaster and Theme Park Review will have the first ever written ride review as well.
  11. I would say inbetween what you described but we are in testing stages still.
  12. ^at a rough guess thats my blonde head and its photographic memory I would say 1/4 of the layout is inside.
  13. Here you goes guys. Superman in all its glory Enjoy http://ozcoaster.net/index.php?option=com_content&task=view&id=44&Itemid=2 And stay tuned for the 1st ever ride review as I will be on the 1st ever train full.
  14. ^cool Im copyrighting it for Motor Cross or the porn industry.
  15. ^im sure a few of the engineers get to ride durning testing. What my ride is, is a competition for staff at work to be the first before anyone else except for the engineers during testing. WBMW like to do alot of staff events because happy staff make a happy park and atmosphere.
  16. ^love your username name awesome stuff. They keep the train on track till pull through complete. Off the top of my head December 16th is media day, but im on the 1st ride and im guessing first week of December for myself (depends on how testing goes)
  17. Here part 2 of the Pull Through, this time the trains visit the camel humps. http://ozcoaster.net/index.php?option=com_content&task=view&id=41&Itemid=2 Enjoy
  18. Damm after seeing that Mexican girl I think I will go to Mexico instead of the United States next October. I have a question Beer School how much beer per cup do you get and how many countries or beers are there.?
  19. ^thanks, yeah not long to go at all, I dont think the feeling will really sink in till im siting on the train. And later in the week I will have pull through photos of the camel humps.
  20. There will be 2 trains each will hold 20 people they are doing the pull through with just the front and back trains. the 3 middle ones are still inside
  21. Due to it being built in a movie studio area just like universal hollywood it is very hard to get any full layout shots because of buildings blocking and no fly zone above.
  22. GREAT NEWS GUYS I WON A COMPETION AT WORK (im a Photographer at WBMW) AND I WILL BE THE 1ST PERSON TO RIDE SUPERMAN IM SO HAPPY. Anyway here is this week update featuring the train going around the track so awesome is it DECEMBER yet http://ozcoaster.net/index.php?option=com_content&task=view&id=39&Itemid=2 Ian:)
  23. Giant Drop at Dreamworld and 390ft
  24. Hi guys ive added brents (downunders) visit to cedar point . http://ozcoaster.net/index.php?option=com_content&task=view&id=34&Itemid=2 I must say you guys are so lucky to have a great park like cedar point so close to many of you north americans.
  25. ^you know how hard that will be to win but best of luck I hope the winners are aussie coaster freaks.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/