This is deffinatley a PARC problem. At Darien Lake, where I work, Ride of Steel has only been operating with one train.
The second train is still in pieces since there is a part that we need from Intamin that PARC does not want to pay for.
In addition to that, certain rides are operating at limited hours. (Predator is 11-10, Grizzly run is 11-7 and doesnt open until June 26 and then Adventure Isle is operating in rotation from 11-1)
To make matters worse, Ride of Steel's lift motor took a poo the other day, so we will see how long it will take to fix that!