Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

Ben Burnett

Members
  • Posts

    122
  • Joined

  • Last visited

Everything posted by Ben Burnett

  1. New Update I changed the name of Intercity to Home sweet Home. Mainly because it portrayed a more homey feel not a city. The new coaster has been built, and it is right at the entrance of the Journey to Tomorrow area. It is a later, more refined version of Log Runner at Dogwood Lake Park. Comments are still much appreciated and any suggestions are taken into consideration. I am trying different path styles for instance in hopes of finding one that may fit better. SCR4.BMP Overview SCR3.BMP The new kiddie coaster. Name is yet to be determined. As usual, suggestions are appreciated. SCR2.BMP The new kiddie coaster. Name is yet to be determined. As usual, suggestions are appreciated. SCR1.BMP The new Employee Entrance, Park Operations, Costume, etc. Building
  2. Hello everybody! I am finally back from my adventure in Canada and the park is ready to get back on the ball and continue with construction. Due to technical difficulties, the station for jet star is going to have to stay the way it is (as station 2).Although that was not able to be changed, much has. First of all, in the recently found Press Release, the name has changed to Clearwater Acres, This was an executive decision and is still negotiable if rejected. I do have some updates such as a new restroom in the front of the park, an updated entrance plaza, and hints to the next area of construction. On to the Photos! SCR11.BMP A new path has appeared behind the Opry House. SCR8.BMP New pieces to the next coaster. Any guesses as to where its going? SCR9.BMP Overview SCR10.BMP The new "less roomy" Entrance and Restroom.
  3. Yeah, I kind of favored that one too
  4. Well, I'm leaving tomorrow morning at 6 A.M to go to Canada. As for the last two days i have been making sure everything is packed for the trip, I have not been able to work on the park very much. All I was able to do is a station for the coaster. I wanted something modern, so I kinda experimented. Please tell me which of the two stations you guys like best, hopefully the topic will stay alive over the break. See you on July 3rd. By the Way Although there is yet to be a press release for the park, I saw signs around the coaster that say "Jet Star", I'm assuming the station they were going withs=was supposed to be like an airport type thing. Oh Yeah, The trains have been placed on the track too, No testing, but the trains have been spotted. Testing probably wont start at least until there is a press release for the park. SCR7.BMP Station 2 SCR6.BMP Station2 SCR5.BMP Station 1 SCR4.BMP Station 1
  5. ^Yes, definitely! By The Way I don't plan on adding anymore scenery because it is getting annoying thinking of things I want to add and having to re add all the rides and shops again. So if you were planning on helping with any of the CS stuff, don't bother. I will just use the ones I was planning on making for my next park.
  6. I'm in. I wont be back from Canada until July 3rd but 2 days shouldn't hurt me too much.
  7. It should work now, I moved the pictures and reposted them.
  8. Construction of the coaster came and went. It has been fully constructed, the area around it landscaped, and many trees planted to improve the atmosphere. The station has not yet been started and the trains have not been sighted. It takes up a small space in the front by the entrance and has a similar design to Broca a roller coaster of the same type in Columbia, South America. THE PARK NEEDS A NAME FOR THE ROLLER COASTER if you have any suggestions for a name, new color, or way to improve the ride, please post. Any help will be appreciated. The park has been doing construction very fast. It is interesting how they are working on it, usually a new park will do many things at once, while this park is focusing on one thing at a time and completing it before moving on to the rest of the park. SCR3.BMP The coaster along with the rest of the construction so far. SCR2.BMP The "main body" of the coaster. SCR1.BMP Entrance area and lift.
  9. Thank you, I plan on doing landscaping and adding trees. I will hopefully get a day or two to work on it before I'm off to Canada. I will post another update as it comes.
  10. Another Update First off, I'm changing the year to 0 so that I don't get to year 2015 and not have any new types of roller coasters to make. There has not been much progress since last time I visited the park. But the tall ugly signs were removed, a new show has been built and there are signs of a coaster for the opening season. Hopefully most of the signs for the restaurants and show will be replaced, but like i said, I have to either find them, or learn to make them (any help with that would be appreciated). Now onto the pictures. SCR10.BMP The tracks have appeared for what looks like to be the first roller coaster. A Schwartzkopf Jet Star/ Jumbo Jet. Obviously this park has some stuff from both new and old. SCR9.BMP The Ride with no scenery. SCR8.BMP The New 3D show; Disaster at The Grand Ole' Opry. I really don't like this name. Any suggestions on how to improve it would be great, including a new name. SCR7.BMP The signs for Starbucks and Donut Time were also added. And the two large signs were removed. SCR6.BMP The Gift Shop and Guest Relations have received their signs.
  11. ^ok... didn't like those too much anyway...
  12. Ok, another small update. All i was able to do was make the buildings around the front plaza and stuff. I would still appreciate it if anyone could tell me if there is a custom scenery pack with signs for starbucks, Doughnut time, etc. If no one can find those things could someone point me in the direction of how to make your own scenery (signs are all i would be making). SCR5.BMP The "basically" finished Entry Plaza. SCR8.BMP The current area with no scenery. SCR7.BMP Guest relations, food, drinks, etc. SCR6.BMP Guest relations, food, drinks, etc.
  13. How did you do the sloping brakerun?
  14. ^ that was just temporary... its green now... i was just waiting till the rest of the area was done to change it. Ok, I plan on posting another update later tonight, but i wanted to know if anyone knew if and where i could get custom scenery signs for things like starbucks, burger king, mcdonalds, doughnut time, etc.
  15. So, i intended to put more up short after my first update... but my sister is using my computer to write a chore list. So i haven't been able to work on it at all. Once she is done i will do some more and post some by tonight.
  16. Sweet, Its a bit longer, smoother and more even than mine. Like the hills all sorta look the same, where as in mine i have like one with a very peaked to and another with a very rounded top.
  17. Sorry about that... they should be working now.
  18. I was driving on a highway earlier this month outside of Savannah, Georgia and saw a large plot of land and a sign that said being developed by Clearwater Acres Entertainment Corporation. I headed home and searched the name, found out that there is anew park that is planning on opening in the spring of 1. There is yet to be a press release but I have gotten a few pictures of the construction so far. They have mainly ripped up the grass and started on the Entrance Plaza. BTW: I am leaving for a two week expedition in Canada on Saturday, so there will be no new updates after this week until July. Please comment give suggestions, if you don't like the name feel free to suggest another. ANYTHING is appreciated. SCR1.BMP Yeah! buildings, I guess i was right about the seasons pass entrance, its coming along pretty quickly, They have filled in the front fountain area. Unfortunately thats all for now. SCR16.BMP The entire construction area. SCR17.BMP It looks like there is going to be two entrances.
  19. I don't actually have it... i have the demo... so i cant save... which is why i have no POV. PLEASE COMMENT PEOPLE!!! criticize, commend, whatever. JUST COMMENT
  20. So i have the scream machines demo... and this is my first full circuit coaster. Unfortunately you cant save... so its gone forever. Hopefully I will be buying this and No-Limits soon enough. I thought it was a pretty good coaster for my first try. Please Comment. Oh and I need a name! Bake run and turnaround into the station. Last Drop Banked third hill. Ninty degrees! Down the Second drop into the Turnaround. Down the First Drop. Out of The Station. Second half and Lift. Cool Shot First Half. And Finishing in the brakerun. Into the Fourth Hill going into the third hill. 90 degree turnaround. Second hill The first Drop Up the lift hill. The Station
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/