Jeroen_twee Posted January 14, 2007 Posted January 14, 2007 Pictures of Winter Efteling 2007. The new Fairytale add-on. First it was just the house of Mother Hulda, and her well was there too. If you looked down the well, you could see a diashow from the fairytale. Now you can call Mother Hulda, if she hears you she opens the window and asks you if you want it to snow. Then she shakes the pillow, and makes it snow. The start of the Fairytale Forrest. The entrance of Vogel Rok (Indoor coaster in the dark) gets an improvement. The first waitingroom was not safe, so they haven't used it for years. Now they make it a corridor, and the space left shall be a storehouse. Two pictures of the improvements of the path to Ruigrijk (the coasterpart). The Gondoletta's (boatride) are going to sail between some new islands. The nostalgic playground is being updated. The old carroussel with horses comes back, the carroussel with zebra's and tigers comes back, Baby Gijs (a garbage can) comes back, and there is a new gate. Other new things are secret. This is the Indische Waterlelies (indian waterlilly's) at the fairytale forrest. The Pagode, a Flying Island. The ending show, Little Red, Snowwhite, and Pardoes wants to make snow but Rumpelstiltskin doesn't believe it. After a while there's snow, and the effect is amazing! New lights at the gates of Fata Morgana, a darkride. Anton Pieckplein at night. The fire's were all over the place in the Efteling. Bye!
msep003 Posted January 15, 2007 Posted January 15, 2007 what is that construction work on these pictures ? What about the New Water Coaster ? Do they still have that Roll Back Problem . I heard that Efteling asked to INTAMIN to help KUMBAK to fiw their trouble . I think they'll need to do some retracking .
Mystery Posted January 15, 2007 Posted January 15, 2007 what is that construction work on these pictures ? What about the New Water Coaster ? Do they still have that Roll Back Problem . I heard that Efteling asked to INTAMIN to help KUMBAK to fiw their trouble . I think they'll need to do some retracking . The problem is fixed by Intamin, they are testing it and it will open on april 1st, they say
krouvi Posted January 15, 2007 Posted January 15, 2007 Thanks for the pictures. I am considering flying to Amsterdam to Queens day this year and of course a visit to Efteling if the Hollander will be already working. I just love this park and can't imagin how beautiful it is when snowing.
Jeroen_twee Posted January 15, 2007 Author Posted January 15, 2007 what is that construction work on these pictures ? What about the New Water Coaster ? Do they still have that Roll Back Problem . I heard that Efteling asked to INTAMIN to help KUMBAK to fiw their trouble . I think they'll need to do some retracking . The problem is fixed by Intamin, they are testing it and it will open on april 1st, they say The real tests are when the Winter Efteling has ended. I've seen people work there, so maybe they'll test only that part for now. The other construction works are explained. Which picture do you mean?
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now