Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

MrRC

Members
  • Posts

    244
  • Joined

  • Last visited

Everything posted by MrRC

  1. I went 20th , 22nd and 23rd of September to look, but NO train, still busy with the electrics and sensors.
  2. I think the rotation is beeing controlled by a large disc with contactspots on every each 10 degrees. This is an old friend, back at the Vekoma Factory (this coach was years in the office of Huisman Itrec Rotterdam) :
  3. Yes thats right because of the track ties look more the same, but the track with is much smaller then the test setup @ Vekoma. The old gen track is 1200 and Motorbike is 800 . So if i took that it would look more skinnier. Thats why i used the old gen track. I hope u understand.
  4. Images of the test set up in [NL2] : All pictures here
  5. Final version of the Rotation Test with Custom trains [NL2] : All images here
  6. Its a pretty TIGHT and SNUG fit . I believe it will fail Clearance test . But just enough to run the tests.
  7. Can u find that drawing ? Sorry i'm from overseas Europe, whats WDI , Walt Disney Imagineers ? Kind regards, Sjaak , Netherlands (Europe)
  8. Here u can see how far the test is build now.
  9. No incorrect, the station will be at the lower straight section.
  10. Bonjour KingRCT3, Yes the station will be at the bottom, tomorrow (Saturday)(Euro time) i will place a video here wich i made today (Friday)
  11. Its like this coaster is allready sold. And probably placed inside a building or structure, so they have elevate the coaster to the specs of install. The brown colored structure / supports are allready at the install location and intergrated in the building or structure.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/