Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

lerm2016

Members
  • Posts

    4
  • Joined

  • Last visited

Everything posted by lerm2016

  1. Correct although it doesn't contradict the quote. Phase 1 has been open for over a year. This includes the Vekoma roller skater and Mine trains from HRP. They still haven't opened the two Premier coasters are still not open and won't open until Phase 2 opens. Theres a list of the currently open rides on the parks official site. http://www.asia-park.vn/category/cong-vien-vui-choi-giai-tri.html?page=1 LoL my mistakes, sorry
  2. This park has been put in operation for over a year already. There are about 19 rides are opening include Iron horse and Hang ten (from HRP) and some brand new rides like Maxi Dance Party 360 (Visa SBF), 47 meters freefall tower (Visa SBF). The SLC will be completed in December this year and will release in January, 2017. Source
  3. Asia Park's engineers said that a Vekoma suspended coaster will be built with a half on land and a half on water surface (I'm just wondering if that a SFC or SLC?). Do you guy think that space (mentioned in the photo) is big enough to build a Vekoma SLC?
  4. Asia Park's engineers said that a Vekoma suspended coaster will be built with a half on land and a half on water surface (I'm just wondering if that a SFC or SLC). Do you guy think that space (mentioned in the photo) is big enough to build a Vekoma SLC?
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/