Guess what? It's DONE! (Well, the track is, anyway, except for 1 piece at the very end removed for accesibility into the inner area of the ride), but they still have theming, landscaping, and quite a bit of asphalt to lay for the new pathways to get to the ride, But in terms of the track, only the last piece at the bottom of the brake run needs to be installed. Also, a close-up of the cool features on the back of the waterfall, and a look up the tower from the bottom of the drop. Courtesy of SuperDude123 from LIF. Enjoy!!