As of now, it does not look like anything has been done to the ramp going up the station. They are now working on the barrel role structure. Sorry about the low quality picture below, I didnt have my DSLR camera with me.
barrel role structure
I went to the park for a while this evening. No progress on the lower helix from when I went last month. Crackaxle canyon is blocked off past the season pass processing but you can kind of see the first drop supports from the Rattler exit where the men's room is if you look over the fence. A better view from sky screamer.
Filming for a commercial
Superman at sunset
Lift hill
I drive by the park almost everyday on 1604 but only get a chance to go to La Cantera to see the construction in the middle of the week. Here is a pic of the 1st drop support structure missing.
I visited the park on Saturday 11/10 to check out progress. It looks like the lower helix is being removed and some track is on the brake run. The brake run is slanted towards the tunnel.
Lift hill and lower helix area from RR express