Found out the exact reason why Shoot The Rapids opening day was delayed till May 29th:
"Shoot the Rapids also has been delayed because of an engineering problem.
"Basically, we had trouble with the boats," Kinzel said Monday. "It's more of an engineering problem than a safety problem."
"The manufacturer made the flume, and he contracted out the boats," Kinzel said. "When the boats came together, the boats didn't fit the flumes."
Kinzel said workers have been busy all week trying to modify the boats, which were too long and didn't go over the top of the hill properly. That can destroy the flume, he said" Link attached.
Can't wait to ride STR! On opening day I checked out the viewing area and it has 8 water canons, 4 for at the beginning of the first lift hill and the other 4 at the second lift hill. For a quarter you can fire one shot and get the some of the riders wet before they start the lift hill. The water canons were operating on Saturday and you will get wet on this ride!
http://www.sanduskyregister.com/articles/2010/05/11/front/doc4be82bf01b51e937174743.txt