Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

dnn2031

Members
  • Posts

    98
  • Joined

  • Last visited

Everything posted by dnn2031

  1. I'm pretty sure the current ROS train is newer than that. And they already have a new train arriving by EOM/early June
  2. If they did get anything high odds it'd be a replacement for Hook's like the other water play structures SF parks got this year. It's been high on the wishlist to replace for years due to age and was seriously floated as a possibility going into this year.
  3. The last (half-)week of June is daily operation. Also they're only opening about a week later than usual with Season Pass & Member access the 15th & 16th though the schedule doesn't show times for it.
  4. Not entirely true. The mandatory state shutdown wasn't until March and while they didn't get a timeline on reopening there was a spool up of readying rides and staffing in anticipation of a potential August opening opportunity. Ultimately that didn't happen beyond the campground operation, but it's not like they've been sitting idle the past year until the State guidance came out. Predator needing track repair I wouldn't call an indicator that it doesn't open; it usually has about a hundred feet that gets extensive rebuilding every year or so. Definitely a fantasy to think they'd do track conversion when the ride that's bought and was ready for assembly was deferred, though. (Batman was an entirely different circumstance before folks get started on that again)
  5. Ever since PARC they've kind of leaned into the marketing idea that the water park and the theme park are two entities in one. PARC originally even wanted to have separate or joint admission which is why they built the extra entrance gate never used that was later replaced by Ripcurl Racer.
  6. It's other side of the (water) park. The earlier picture of it by Wave and Kahuna is accurate.
  7. Houston's (which this is likely a dupe of) doesn't have the Tornado element, just the wave wall and a helix section. Although the teaser video alternates between a Behemoth Bowl40+Tornadowave60 hybrid and a brief shot of Houston's with the short orange open section.
  8. Here's one: Six Flags is pretty unoriginal in their naming and consider alliteration the height of wittiness. I suppose that's not much a hint. It's another ProSlide...
  9. Presumably they don't consider the cost of refurbishment (which is considerable) of two trains instead of one doesn't offset the loss of guest satisfaction. Even if they run a second train only on busy days or weekends it still needs to be near completely disassembled, checked for cracks by third-party inspection, and the majority of hardware replaced annually. Between 4 coasters this could be two hundred thousand or more? Just the bit of Predator track replaced was something like close a hundred thousand I'd heard.
  10. The original plan I believe was for it to be temporary for 3-5 years and then PARC wanted to move it to a different park while putting something else there. At about that age some of the major cost items like the launch cable would be due and it could then be defrayed tax-wise as the capital improvement at its new park.
  11. And it worked out real well for Six Flags going bankrupt the first time around. I thought Boom and Mind Eraser were supposed to be derided as standard 90's SF cookie cutter coasters, anyways. And 'nothing of substance': two new roller coasters, a new water park area, and a number of flat rides. Edit: three coasters. Forgot Rolling Thunder.
  12. My understanding is a large chunk of funding for those installs came from CNL as the property owner. After Herschend they were seriously working to sell the park so might not have been as interested in investing a lot in improvements if the value wouldn't be reflected in the sale bids. The campground was getting focus as a part of the business with the cabin installs going on. During the Premier period there was also considerable amount going to infrastructure (power and the water treatment). Not as sexy as a new ride, but the park hasn't had the total/partial power loss issues 2-3 times a year. Another average size coaster would have been three years out, but they decided they needed a coaster sooner than later so Tantrum fit the bill.
  13. There were two built for Darien Lake. One was more custom that headlined on the show. The other was similar in design, but built more around one of their standard semi-custom choppers as something that could be driven. The second was the one that was to be raffled off. Except the winner turned out to be Canadian and the motorcycle wasn't legal by their regs. So the raffle bike sported a For Sale sign for about two years.
  14. Call me proven corrected. Although if PARC was the one who bought it they probably shipped it somewhere else after they split ways. They grabbed anything they could on the way out like the fancier version of the OC Chopper bikes.
  15. I wasn't familiar with the Geauga Lake ride, but that is a very different scale to Corn Popper. Similar concept and both Huss, but I would imagine very little parts commonality. And definitely haven't seen it used for Fright Fest (or at the park, for that matter).
  16. They used old Crazy Quilt cars on and off, don't recall any Corn Popper. Or if they did it could have been off the live ride; Corn Popper used to be shut down mid-September when they fenced off that part of the park. But I'm pretty sure they don't have a spare Corn Popper for parts.
  17. My earlier dismissal of a water ride might have been premature. Though not much further details.
  18. They still have a second train for Motocoaster. It's pretty much too short a ride to warrant running both.
  19. I don't know if they will go with another splash pad in similar style to Hooks. Apparently it takes a lot of chemicals to maintain that much surface area of water compared to the other water park attractions. In general a water attraction seems like it would be an odd choice especially since with Six Flags they are looking to push back into October when the water park closes in, what, early September?
  20. Attendance has been doing better this month, but the place was really empty the first two. If anything I'd heard they were down or to about equal. A lighter concert schedule probably has a lot to do with it. PAC didn't have a lot going on until this later part of July. Expanding from ME into the parking lot would be a bit of a mess. 15k crowds usually fill the lots as it is. Unless they rip out Grizzly Run and use that space.
  21. Herschend did make offers to buy the property outright, but allegedly there was an insurmountable gulf between what CNL wanted and they offered. Don't know if they weren't interested in continuing to lease or just were further outbid when CNL sold the property to EPR.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/