First of all, I think someone didn't get there morning coffee and is a little grumpy.
Second, I think 750 pph is very low, considering that's the maximum possible capacity. Usually the actual capacity is lower than that. If it takes 1:30 to load two trains, the capacity would be 640 pph. Thats not including any kinks, breakdowns, people vomiting on the trains, etc.