Page 1 of 41

[VEKOMA] Something is being built @ Vekoma Vlodrop

PostPosted: Sat Jul 30, 2016 6:00 am
by MrRC
Link to my new site about Vekoma testing :

All the info and pictures

Re: [VEKOMA] Something is beeing build @ Vekoma Testsite Vlo

PostPosted: Sat Jul 30, 2016 10:19 am
by spinning man
The thing that comes to mind after seeing these photos is this recent post Vekoma posted on their facebook page about the next generation looping coaster. Though I wonder if they developed a new train design which will be the reasoning behind this test.

Re: [VEKOMA] Something is beeing build @ Vekoma Testsite Vlo

PostPosted: Sat Jul 30, 2016 10:49 am
by PVA62
That looks like a fun concept!

Re: [VEKOMA] Something is beeing build @ Vekoma Testsite Vlo

PostPosted: Sat Jul 30, 2016 3:21 pm
by MrRC
Possible this is the same coaster : called Bermuda Blitz.

Confirmed : not this coaster.

Re: [VEKOMA] Something is beeing build @ Vekoma Testsite Vlo

PostPosted: Sat Jul 30, 2016 7:31 pm
by Cj1990
Coaster looks intense lol

Re: [VEKOMA] Something is beeing build @ Vekoma Testsite Vlo

PostPosted: Mon Aug 01, 2016 6:36 am
by MrRC
Update new pictures :

Image

Image

Image

Image

All pictures : here

Re: [VEKOMA] Something is beeing build @ Vekoma Testsite Vlo

PostPosted: Mon Aug 01, 2016 9:19 am
by Midgetman82
Are these new-line Vekoma's being designed by Ride Centerline? The layout looks very similar to something they would likely do.

Re: [VEKOMA] Something is beeing build @ Vekoma Testsite Vlo

PostPosted: Mon Aug 01, 2016 9:41 am
by MrRC
We will see during the construction progress what will be build and tested.

I will keep u updated with pictures whenever is needed.


More pictures : here

Re: [VEKOMA] Something is beeing build @ Vekoma Vlodrop

PostPosted: Tue Aug 02, 2016 11:38 am
by MrRC
New pictures from today (Aug 2nd)

Image

Image

Image

Image

All the pictures : here

Re: [VEKOMA] Something is beeing build @ Vekoma Vlodrop

PostPosted: Tue Aug 02, 2016 11:51 am
by Superbatboy
I wonder who will buy this prototype when they're done testing