Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

Fuji-Q Highlands Discussion Thread


Recommended Posts

Not a mirrored clone.

If you look at the footer layout the ride is obviously not a mirrored clone.

http://www.coasterforce.com/cf-info/viewtopic.php?t=2272&start=75&sid=e2fcc866a79f7c2a02d9131fd334e80f

Check this forum where someone has drawn a possible layout sketch.

 

Its very simular but baby steps

We also know that the ride will feature the Full-Full Element. which X does not.

Link to comment
Share on other sites

MF's trains are closer to 29 tons each which is over 3 tons per car, BUT Dragster's trains are MUCH MUCH MUCH lighter, on the order of about 10 tons for the entire train.

you guys are stupid. 29 tons per car? Thats heavier than the freaking thing that halls it! 29 x 8 = 232 tons per train. That's 232,000 pounds per train!!!!! MF would crall! And if you ment 29 tons for the train, that's sounds a little far fetched as well. Moral of the story, get your facts strait!

Link to comment
Share on other sites

A "ton" is metric. It is 1000kg or about 2204lbs.

 

The US has "long" and "short" tons.

A "long ton" = 1.12 short tons = 2240lbs = 1.016 (metric) tons.

A "short ton" = 2000lbs = 0.907 (metric) tons.

 

The short ton is the more used one of the two, but of course the metric ton is the most common.

 

Go with the times and get rid of that ridiculos english system! It's really annoying!

Link to comment
Share on other sites

MF's trains are closer to 29 tons each which is over 3 tons per car, BUT Dragster's trains are MUCH MUCH MUCH lighter, on the order of about 10 tons for the entire train.

you guys are stupid. 29 tons per car? Thats heavier than the freaking thing that halls it! 29 x 8 = 232 tons per train. That's 232,000 pounds per train!!!!! MF would crall! And if you ment 29 tons for the train, that's sounds a little far fetched as well. Moral of the story, get your facts strait!

 

 

Read what he wrote again...

 

 

And if he had made the mistake of saying cars, it doesn't give you the right to call him stupid...

Link to comment
Share on other sites

I went into this long speach of how 29 tons is farfetched as well, even if I did say a ton is 1000 pounds, when in facts its over 2000 pounds which makes it even a more farfetched number. Even if it also is 9 trains. My point is still the same. Saying how most cars way several tons, I can't imagine a train that is built to be lighter weight waying 29 tons~

Link to comment
Share on other sites

Ok, I didn't mean to start a flame war.

 

One ton=2000LBS

 

Is everyone clear on that?

 

 

Now that you guys mention all that, I don't think they overdid the supports. With the heavier trains and the chance of earthquakes, I'm sure that they would want more supports.

Link to comment
Share on other sites

^exactly. SFMM has the same problems (earthquake safety), and look at how many supports X has. I think that they are using the right amount of supports. I wonder if they will have the weird supports that they have on X before the turn, where they are horizontal, and elongated.

 

 

Look at the supports right after the turn, to see what I mean:

http://rcdb.com/ig750.htm?picture=7

Link to comment
Share on other sites

I talked about this to Alan Schilke a few years back at IAAPA. I believe my comment was "shouldn't you make the regular one work first".

 

Anyways, we know the park has relationship with S&S Arrow, I wouldn't call it impossible...we know that S&S wants to do it!

Link to comment
Share on other sites

I'm going to say NOT A CLONE.

 

Check out the new cage of supports that has sprung up this week.

Also, the station foundation is done, and the construction has started up there. (No track over there yet, but it definitely looks big enough for a dual loading station!)

More track is on site, with six unconnected segments around the work site and many sections of supports laying around as well.

 

Sorry I didn't get around to the back of the site this time, but Fujiyama didn't open until late, so Don and Monica 'needed' to get the credit and it was very shortly after that the sun went down.

 

Here's the pics...

DSC00468.jpg.cae07ae0a2fa7f8fb869997680ed2051.jpg

Dirt, track sections unlifted supports and the shoot the chute supports...

DSC00484.jpg.628f2cc6da54ec71ef23b7f3ffe10a14.jpg

Monica wanted to ensure that people know that she and Don are OK.

DSC00499.thumb.jpg.2668acc3d636e7d62560d5cfbe839693.jpg

From the ferris wheel, the new support structure looks fully erect. A steel crossbar was lifted while we waited for Dodonpa. These guys even work on Saturday!

DSC00491.jpg.7cfbe145383e607e6aacb39aa7c54f2e.jpg

From a distance, the new support and another track attached...

DSC00498.thumb.jpg.fa357ac16468d9b7f08333119d8f15f9.jpg

Footer layout, station foundation and a sideboob of the new support structure...

DSC00487a.jpg.36a94e4cc5814d850c9c604e155c087b.jpg

And Don was OK until Monica shoved him into the shoot the chutes pond and he hit his head on the icebergs floating there. OK, so he only hit his head, but he MIGHT have caught hypothermia from riding Fujiyama while drenched, though! Don: let me know if yo

Link to comment
Share on other sites

I don't remember if I mentioned this here, but I think that this one could have a launch. Discuss your opinions on this.

 

Isnt there already alot of stress on the trains as it is? If so, a launch would probably cause tons of money in upkeep on the trains, not to mention potentially tear them apart.

 

My opinion is they are probably more concerned with getting it to work correctly than they are adding a completely new feature. Plus, going up backwards on the lift into a near-vertical drop seems like it would be more thrilling and suprising than a launch for this type of ride anyways.

 

Like elissa said, make sure it works first !

Link to comment
Share on other sites

Maybe those are the supports for the lift's top which will be inverted going down a half-loop from the top

 

am thinking the same...

 

 

btw, rollermonkey, you said that the site of the guessed station is big enough for a dual load, that gotta be huge, two trains and the station ramps...phew

Link to comment
Share on other sites

^ There doesn't HAVE to be station ramps, but in the pics (taken from a @40 meter ferris wheel 500+ yards from the new station, it LOOKS extremely wide. I wouldn't bet you either single or double loading, but I am guessing from the proportions. I hope to get back in about another month or so and update the construction. Maybe it will be obvious one way or another by then?

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/