P. 624: Stella Luna and Terra Nova resort details released!

Recommended Posts

I'm very interested to see what The Incredible Hulk looks like once it returns... I wonder if it will be a carbon copy of the previous ride, launch system and all, or if they will use rebuild as an opportunity to make any changes to the ride layout or launch mechanisms.

 

The layout won't be changing from what we were told, however there is a possibility that some sections could be reshaped. There will be something different about the launch system and the trains are getting some modernization.

 

Was back there again today. Not sure if this has been posted but this piece is clearly marked as scrap. Looks like there are red and blue dots now marking other sections.

 

20151015_151443573_iOS.jpg?psid=1

Image is not showing up. Can you upload the image so this doesn't happen? Thanks.

Link to comment
Share on other sites

I'm very interested to see what The Incredible Hulk looks like once it returns... I wonder if it will be a carbon copy of the previous ride, launch system and all, or if they will use rebuild as an opportunity to make any changes to the ride layout or launch mechanisms.

 

The layout won't be changing from what we were told, however there is a possibility that some sections could be reshaped. There will be something different about the launch system and the trains are getting some modernization.

 

Was back there again today. Not sure if this has been posted but this piece is clearly marked as scrap. Looks like there are red and blue dots now marking other sections.

 

20151015_151443573_iOS.jpg?psid=1

Image is not showing up. Can you upload the image so this doesn't happen? Thanks.

 

Sorry, looks like a permissions issue with the host. Will try this new link.

 

20151015_151443573_iOS.jpg?psid=1

Link to comment
Share on other sites

The layout won't be changing from what we were told, however there is a possibility that some sections could be reshaped. There will be something different about the launch system and the trains are getting some modernization.

Bummer, since Hulk was designed just before B&M began mixing vagisil into the ink they print their blueprints with.

Link to comment
Share on other sites

I should of been more specific as the ride that was planned for Dubai essentially picked up and moved to Singapore. The ride plans not specifically the track.

 

 

Also False

 

From the beginning, both USD and USS were always designed to have Revenge of the Mummy - both with track layouts virtually identical to USF

 

To be fair, even though USD and USS share(d) the same track layout as USF, the show for USS is pretty different than the USF version. USS isn't about riding the movie like USF is and there's a lot of things Universal improved upon. Whether or not USD was going to be the same show as USF is up in the air since it was never built, but I can guarantee the track for Dubai was not used in the Singapore version.

 

No offense EastCoastn7, but I'm listening the guy that worked at Universal and has first hand knowledge of the situation, in this case CoasterFEV.

 

Hey no worries but now I'm curious, does this mean the story for Dubai Mummy was that of Orlando? Essentially a clone? Was it a one of kind that was never built? Please I'd love to know more, the Mummy is one of my all time favorites!

Link to comment
Share on other sites

The layout won't be changing from what we were told, however there is a possibility that some sections could be reshaped. There will be something different about the launch system and the trains are getting some modernization.

Bummer, since Hulk was designed just before B&M began mixing vagisil into the ink they print their blueprints with.

 

I wasn't given the impression that the ride would be toned down at all.

Link to comment
Share on other sites

I think the new launch has been all but confirmed as this was mentioned in the original permit application along with the new queue line theming elements. There are pictures of a gigantic crane near the first half of the ride here: http://www.coasteroftheday.com/cotd-park-trip-report-blog/the-incredible-hulk-deconstruction-at-islands-of-adventure so it looks like they'll be starting to take down the first half of the ride soon

Link to comment
Share on other sites

The layout won't be changing from what we were told, however there is a possibility that some sections could be reshaped. There will be something different about the launch system and the trains are getting some modernization.

Bummer, since Hulk was designed just before B&M began mixing vagisil into the ink they print their blueprints with.

 

I wasn't given the impression that the ride would be toned down at all.

It's probably not what they're going for, but the B&M of today is different than the B&M of old. If they're re-shaping track sections...I'm not an engineer, but I would imagine that the difference between a forceful ride and a fluff ride are not too radical in terms of track profile. It would probably only take a tweak here or there to turn Kumba into Kraken.

 

It could be the first sit down B&M without the snappy transitions if they change the track or layout design.

The last two standard sitdown loopers they built (not including floorless - Wildfire and Led Zeppelin) are 100% snappy transition-free.

Link to comment
Share on other sites

I wasn't given the impression that the ride would be toned down at all.

It's probably not what they're going for, but the B&M of today is different than the B&M of old. If they're re-shaping track sections...I'm not an engineer, but I would imagine that the difference between a forceful ride and a fluff ride are not too radical in terms of track profile. It would probably only take a tweak here or there to turn Kumba into Kraken.

From what I understand this is exactly what is happening. Should be interesting to see just how much the ride feels different, even though the track layout will remain the same.

Link to comment
Share on other sites

I remain really surprised if they are replacing most/all of the track and even the supports solely for wear-and-tear / stress fracture reasons. As others have stated, it is only 16 years old and despite year-round operations, there are many, many more steel coasters with more use. Plus, B&M obviously over-engineers its track and supports and obviously built this ride to last MUCH longer than this. I wonder if something odd is going on in terms of the manufacturing of the steel or something other ride-wise defect has arisen, because otherwise this makes no sense to be occurring at this time span in the ride's life.

 

I would have bet money the layout was significant changing once I saw the amount of ride track and supports leaving.

Link to comment
Share on other sites

it is only 16 years old and despite year-round operations, there are many, many more steel coasters with more use.

Name one. I can't really think of many other coasters of this size that have had this many cycles. B&M has actually said themselves that Hulk is the most cycled coaster they have ever made. Hulk has not had any sort of significant re-hab since it opened in 1999. Other than maybe a week or so to get painted a few years ago before the original Potter land opened, I can't think of a time where the ride has been closed at all.

 

It has run continuously, almost always running three trains, usually fully loaded, 365 days a year, open every private event the park has, since 1999.

 

Outside of some of the coasters at Disney parks, which are less aggressive rides, and which usually get some sort of annual rehab, I don't think there has been another steel coaster of this size that's ran as much as Hulk has.

Link to comment
Share on other sites

I would think there are a couple major steel coasters with the wear of the Hulk (Viper at SFMM comes to mind), but it's a very small number. I feel that this total retracking definitely wasn't necessary, but my guess is since they wanted to do a major rehab/update, they would kill 2 birds with 1 stone and get it all done with the rise already closed. Now they'll be able to run the chain's flagship coaster another 20 years straight, which to me is a huge win!

 

I really can't wait to see what updated theming they include, especially in the queue and launch tunnel. Some fog, green lasers and LED lighting would be amazing in that tunnell.

Link to comment
Share on other sites

Some fog, green lasers and LED lighting would be amazing in that tunnell.

 

I'm pretty sure that's what was originally planned and advertised. Most of it never came to fruition, though. The mist on the launch exit was probably the only thing that survived but even that was a game of chance whether it'd be working on any given day.

Link to comment
Share on other sites

it is only 16 years old and despite year-round operations, there are many, many more steel coasters with more use.

Name one.

 

Sure, I can name a lot more than one. It's only a 16-year-old coaster, and it's not like Islands of Adventure ran insane operating hours or huge volumes of people in the off-season periods for much of its history (recall that it was mostly in the 4-6 million attendance range PER YEAR until Harry Potter's arrival). There were plenty of times in the offseason in the pre-Potter days where they cycled 2 trains and the park's attendance was very sparse. BUT let's assume that given its 12-month operating season and maybe longer summer hours that it cycled at least 60% more per year than say a comparable coaster at a busy seasonal park like Cedar Point or a major six flags park, with a normal 6-month-ish operating season. So, that would put its comparative number of cycles for its 16-year-life span as akin to a coaster running for 35 years at a seasonal park, give or take a few years.

 

There are a ton of steel coasters that are more than 30 years old, and which were built without the benefit of the type of elaborate computer engineering that we have today that can reliably estimate, in much more accurate ways, the actual forces and material stresses, so that the track and supports can be over-engineered to tolerances well above maximum operation conditions - which is precisely what B&M does. Not to mention that the track fabrication tolerances and processes are fundamentally superior in 1999 to what was done in the 1970s.

 

In any event, how about the following rides to start with:

 

1. Dueling Dragons / Dragon Challenge - it's the perfect control coaster. Same park, probably slightly lower ridership due to location, and with two tracks, probably fewer train cycles, but not by a ton. And it's an inverted coaster -- and if there were a ride subject to tough stresses on supports and track, it should be the inverted coaster because the track and the weight of the trains continually pull away from the supports compared to a conventional ride. (Of course, people will suspect that it's now next in line somehow.)

 

2. Kumba. Open all season. Annual attendance averaging 4M a year (so slightly lower, but competitive, annual attendance figures with IOA for much of its history), same force as Hulk (maybe even more intense in some sections), and opened in 1993: so has six additional years of cycles compared to Hulk. No track replacement in sight.

 

3. Demon. SFGAM or PGA. The corkscrew tracks have been in place since 1976 and never replaced as far as I know -- that's nearly 40 years of cycles. The loops and parts of the drop since 1980 - 35 years of cycles - no complete track replacement. That's a competitive cumulative cycle history with Hulk, but with engineering and track fabrication standards that are 45 years old.

 

4. Lochness Monster - 1978. 37 years of cycles. Same issues as above.

 

5. Mindbender - 1978. 37 years of cycles. Similar issues as above, but non-Arrow issues.

 

6. Viper - SFMM. 1991 - longer operating schedule than most seasonal parks, but obviously not as many operating days as IOA. But with an additional 8 years of cycles, it is probably competitive with Hulk in cycles.

 

There are many more.

 

Does anybody really believe that B&M designed Hulk to have a 16-year track and life support life span? Even the craptastically designed Shockwave at SFGAm made it 14 years without being scrapped (albeit with top of the loops replacements). I honestly can't think of ANY major coaster requiring full track replacement this early in the life cycle, but particularly not coasters as over-engineered for tolerances at B&M coasters -- they knew exactly what the repetitive effects would be on the coaster and designed it accordingly. There is nothing uniquely stressful on the materials about Hulk's operation and there certainly is nothing inherently in the compressive or tensile strength of steel or other materials in the track or supports that somehow would necessarily cause them to fail based on 16 years of cycles? It wasn't like the operating season, dispatch intervals, or train weight were a mystery at the time of design?

Link to comment
Share on other sites

It's not only the stress issues, but the launch system will be a big upgrade.

 

With the old electric motor launch, there were over 200 motors and tires used to launch the train. That is so many moving parts to inspect and keep track of, and because there was contact between the components and the train constantly, there was a lot of stress and need for replacement parts I'm sure. With an LSM launch, there would be no contact with the trains, plus the park will probably be able to reuse their current flywheel system for it.

Link to comment
Share on other sites

it is only 16 years old and despite year-round operations, there are many, many more steel coasters with more use.

Name one.

Sure, I can name a lot more than one...

SNIPPED a bunch of made up stuff that shows he knows nothing about the operations of roller coasters.

 

In any event, how about the following rides to start with:

1. Dueling Dragons / Dragon Challenge

You said it yourself this ride has fewer ride cycles, which is correct. So why would you even list it??? #dumb Not even to mention this ride got a HUGE rehab when the original Potter land was built!

 

2. Kumba.

Kumba has received SEVERAL lengthy maintenance rehabs over the years. It also does not run anywhere NEAR the ride cycles that Hulk does, and I've been to the park when it's so empty, they are only running one train on it.

 

3. Demon. SFGAM or PGA. The corkscrew tracks have been in place since 1976 and never replaced as far as I know -- that's nearly 40 years of cycles. The loops and parts of the drop since 1980 - 35 years of cycles - no complete track replacement. That's a competitive cumulative cycle history with Hulk, but with engineering and track fabrication standards that are 45 years old.

These parks are closed during the winter where these rides get an extensive rehab if needed. The parks are open 6 and 5 months out of the year, respectively, and daily for only 3 months out of the year. So even though these rides are 40 years old, 24 years older than Hulk, they have actually cycled LESS times than Hulk!

 

4. Lochness Monster - 1978. 37 years of cycles. Same issues as above.

This park is closed during the winter where the ride can get an extensive rehab if needed. This park is closed 5 months out of the year and only open daily for 3 months out of the year.

 

5. Mindbender - 1978. 37 years of cycles. Similar issues as above, but non-Arrow issues.

This park is closed during the winter where the ride can get an extensive rehab if needed. This park is closed 3 months out of the year and only open daily for 2 1/2 months out of the year.

 

6. Viper - SFMM. 1991

This ride has not only received extensive rehabs, including having all the track from it's loops and first drop replaced, but also is closed Mon-Fri during the off-season where additional work can be done if needed.

 

There are many more.

No, actually there are not. There are NOT many more rides that have had the same amount of ride cycles in the same amount of time as Hulk WITHOUT getting any annual rehab. Your attempt at making a point is impressive. It's just a shame it's all totally incorrect. Nice try, though!

 

Does anybody really believe that...

SNIPPED a bunch more embarrassing stuff that shows you don't know how coasters work... I love how someone in Chicago is trying to tell me what the operating practices of coasters in Orlando are. Like, how do you even know??? It's clear that you don't.

Edited by robbalvey
Link to comment
Share on other sites

Robb what are all these magical rehabs that all the coasters I listed are getting in the offseason that prevents their track from being replaced?

You know as well as I do that most of the track on most of the steel coasters is left untouched, other than xrays and spot welds on high stress points -- are you saying that IOA purposely refused to do these same checks and routine maintenance on Hulk over the past 16 years?

 

(And why do you have to be so snide over a legitimate discussion? It is unusual for the Hulk track to have a shelf-life of 16 years.)

Link to comment
Share on other sites

^ I can think of one or two in Korea that are year-round and super old and as far as I'm aware have never really had an overhaul or big rehab.... and they can be really rough and that's with one or two trains, so that's still probably less cycles than Hulk even though they are older. Lots of parks in Asia are year round and though, unlike Hulk, these get rehabs now and again, they don't have track replaced and you always here people describe the older coasters here as "good" and almost never as "great". Here in Korea, with some of the older ones, I think the Boomerang is now SBNO and Childrens Grand Park tore out their looper and replaced it in the end. I know other rides that replace trains and just do little jobs on the track where the ride has only a few days closure and then runs on the busier days of the weekday/weekends and they are still rough after all the weekday work.

 

I'm glad they are doing such a big rehab instead of just a couple months closure to do spot-work.

Edited by Garet
Link to comment
Share on other sites

Robb what are all these magical rehabs that all the coasters I listed are getting in the offseason that prevents their track from being replaced?

You know as well as I do that most of the track on most of the steel coasters is left untouched, other than xrays and spot welds on high stress points -- are you saying that IOA purposely refused to do these same checks and routine maintenance on Hulk over the past 16 years?

 

(And why do you have to be so snide over a legitimate discussion? It is unusual for the Hulk track to have a shelf-life of 16 years.)

 

Are you serious? It's not any magical rehabs in the OFFSEASON...it's the fact that there's an OFFSEASON resulting in many fewer cycles! IOA did not take the ride down as much as they could have which would have lengthened the lifespan of it. Instead they chose to 'run it into the ground' with almost no stops for 16 years, equalling out to something similar to a 25-30year life span. Robb is probably being 'snide' with you because of your attitude and not listening.

Link to comment
Share on other sites

Robb is probably being 'snide' with you because of your attitude and not listening.

This. I'm happy to have a discussion with someone if the discussion is based around logic and actual REAL information about rides. But if you're going throw out some made-up "facts" in an effort to prove me wrong when all you're doing is showing everyone how you know absolutely NOTHING about what you're talking about, yes, I'm going to be snide with you in my response to show you just how stupid you're being. And if you don't like that, there are other forums to post to and we won't miss you at all.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/