Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

The Knott's Berry Farm (KBF) Discussion Thread

P. 651: Montezooma's Revenge project terminated?

Recommended Posts

It would be kind of funny (but perhaps to some it would make more sense) if it went to a park like CGA. They got rid of their original 1st-gen and got the "Foot Lopper" model. Out with the new, in with the old.

 

And we'll take that Schwarzkopf back, while we're at it!

 

 

But I guess CGA is getting CHAOS...?

Link to comment
Share on other sites

Seems like a very odd move to me. I too am surprised this thing is going to another park instead of the junk pile. The one and only time I rode it I got my neck all jacked up on the transition from vertical to horizontal. I just don't see the reasoning behind this one at all.

Link to comment
Share on other sites

The one and only time I rode it I got my neck all jacked up on the transition from vertical to horizontal.

 

I noticed that in 2008, too. But it seems like a problem that could be solved. The rest of the ride went very smooth.... then, ka-THUNK!!! ouch.

 

It will be pretty cool/strange to see it in a new setting, though!

Link to comment
Share on other sites

I wonder what will happen to Screamin' Swing? Off to another park? Moved to Soak City? Moved elsewhere within Knott's? I haven't seen anything about that.

 

Not a good move to me. Better to bring back Tumbler or put a dark ride or something else there.

 

I wonder, too, if this will be an upcharge ride?

 

Eric

Link to comment
Share on other sites

As much as I'd like to see a first gen Freefall preserved, especially Demon Drop, somehow I feel that this could be a complete red herring.

 

I could be wrong, but seeing this in a Buena Park Community Development newsletter is not a conformation in my eyes. I wonder who they really heard this from. I'd like to hear it from the park, please

 

I agree that it is not a 100% confirmation...but that is an official Buena Park website. It is also equally as likely they got their info straight from planning documents submitted to the city (hence the reason they have the date for the start of construction).

Link to comment
Share on other sites

I don't completely believe this yet, and I think it's a really weird/bad move for KBF/CF, but if this is true, I won't be devastated. It's a fun ride and would definitely be a must ride for me every visit (if lines don't get too long). Plus, they could make it look really nice and theme it to a mine shaft.

Link to comment
Share on other sites

Rumor: I know of a Northern California park that was at one point interested in Knott's 8-seater Screamin' Swing.

 

I second that rumor.

 

If that rumor is true, it seems like Cedar Fair is maybe testing out a ride rotation program similar to Six Flags, but on a smaller scale.

Link to comment
Share on other sites

I found a video that sums up my feelings exactly about this project...

http://www.youtube.com/watch?v=XSV-VtJfwRw

 

As for Screamin' Swing...I'm pretty sure it will be park-rotated

Dude Intamin 1st gen's are awesome. It may not make any sense but I would much rather ride this than the S&S snoozefest they have there now, at least Demon Drop is thrilling.

Link to comment
Share on other sites

Assuming the rumor is true...where the heck would they put it?

 

I went to Knott's today for a quick fix of coaster...and I don't remember seeing any possible space for a ride this size. Even if it did take up the swing's spot, Pony Express is RIGHT there...along with the train track.

 

The park cannot possibly fit anything else in there...it's beginning to look like Blackpool Pleasure Beach!

Link to comment
Share on other sites

"...the S&S snoozefest they have there now" (Papas)

 

Supreme Scream was good when it opened. But I agree that its current program leaves a lot to be desired.

 

Methinks Knott's is going to learn the hard way about keeping this ride maintained and operating. You'd think that when it was at Cedar Point they would already know.

 

Eric

Link to comment
Share on other sites

^ At one time, you took the first drop, then went over halfway back up the tower. The drops got progressively smaller, of course, but you went for a longer time then.

 

Now, after the initial drop, you go less than halfway back up, and the drops get smaller much faster.

 

Eric

Link to comment
Share on other sites

^It also used to hold at the top for a longer period of time. The first time I rode, it waited for 7 seconds at the top of the tower. On my most recent ride, it was only one or two.

 

I think the ride today has about three bounces before it just slowly lowers back down (will drop about five feet, bounce a foot, then drop another five feet, etc.). If I remember correctly (never rode with the original program, just watched other family members), it had about twice as many bounces before.

Link to comment
Share on other sites

 

That would be like Six Flags Magic Mountain installing an old Schwarzkopf shuttle loop and trying to market it as something "new."

 

 

--Robb

 

Oh please tell me this is true!!!

 

Shane, you don't want that to be true. If it did happen, the train would have to be outfitted with in-house OTSRs, a five point harness, and 6 inch high seat dividers!

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/