P. 651: Montezooma's Revenge project terminated?

Recommended Posts

On 1/7/2022 at 7:31 PM, swfan1988 said:

Kinda wish they had given a little more heads up about it, as it will be closed for a year it sounds like, with only 3 days notice.

Let's not pretend that seeing Monty operational on any given day wasn't already a huge gamble.  Out of the past few years I think I've been lucky enough to actually get on the ride twice.

On 1/8/2022 at 2:48 PM, JJLehto said:

Ha nah pooling all our $ can buy what 2 SoCal homes?

Hold up a minute.  I'm all for a TPR Timeshare in SoCal and I'm pretty darn sure a bunch of you other maniacs are, as well.

 

  • Like 3
  • Haha 2
Link to comment
Share on other sites

7 hours ago, KBrylczyk said:

 

Hold up a minute.  I'm all for a TPR Timeshare in SoCal and I'm pretty darn sure a bunch of you other maniacs are, as well.

 

I value the knowledge and tips/advice of the enthusiast community but I won't lie, I could never live with yall XD
 

Though hilariously I have been applying to jobs all over, including CA, so watch me end up living by KBF anyway. If so anyone is always free to crash on my couch and beer is absolutely acceptable payment. 

  • Thanks 1
Link to comment
Share on other sites

Great, how is this park supposed to build a giga coaster if they can't even figure out when they are gonna close a ride for "refurbishment" (now) major renovations? Thanks a lot Cedar Fair...

Also, they randomly announced that they are adding a new Italian restaurant this summer...replacing Hollywood Hits...on some place called "Memory Lane" (Where's that? It says on the park map that Hollywood Hits is part of the boardwalk)...

So we got a reopened ride...a random pizza place...and a new area (maybe, I'm not sure? Is "Memory Lane" really a thing?)...all announced at once! I'm just saying...the PR guy must be drunk...or something else weird is going on here...maybe those giga plans were real after all...

Link to comment
Share on other sites

I"d imagine that reopening Montezuma again is mostly because not only did they only give a three day notice, but one of those three days (the last Saturday!) the ride went down all day, so it turned out to be only a two day notice. 

  • Like 1
Link to comment
Share on other sites

I love the look of the new eatery. That area of the park did need some TLC. And I am all about more easily accessible and higher capacity drink refill stations.

Glad they reopened Monte for the time being. I was a little surprised they gave such short notice initially. Who knows why they did that (aside from the downtime this weekend) but it's not a bad thing, get your "last" rides in everybody!

Link to comment
Share on other sites

I was able to hit the park today for a little bit. Got some good pictures of the new eatery/brewery. I think it looks great!! They must be tearing down this old building completely to put this up. 

In addition I was able to marathon Montezumas Revenge for one last time. Still a great ride!!! I hope the launch stays intense!!!

D5785D8F-B84C-454A-942F-70E33E65CBB3.jpeg

1BF5265A-A1AB-430D-A810-0B6C9C406D29.jpeg

4347599F-CD7A-4D57-95CE-4629DE066F8C.jpeg

  • Like 1
Link to comment
Share on other sites

Xcelerator down again? Hmm, interesting. Maybe the closure back in Nov-Dec was for repaint only and not regular maintenance? Or maybe (hopefully) they're painting over the ugly gray sections? Lol.

Also, throughout my entire lifetime of going to Knott's as far back as I can remember, I've never seen Supreme Scream down (obviously not 100% true but it has incredible uptime)! They always have it least *one* tower open. Supreme Scream and Silver Bullet are the ol' reliable for the park.

Also, the concept^ looks great! Excited for all these changes coming to the park.

Link to comment
Share on other sites

Why would  it take a year and a half to change over to LIMs and add new trains. That seems like a 90 day refurb at most. But they specifically used the word renovation. That leads me to believe they are doing something much more involved and Monty may have seen it's last days as a simple shuttle loop....I still think they should just turn Jaguar into an Intamin Blitz. Keep the station and theming. You can even use pretty much the same foot print for the most part.

  • Like 1
Link to comment
Share on other sites

13 hours ago, firebird81 said:

Why would  it take a year and a half to change over to LIMs and add new trains. That seems like a 90 day refurb at most. But they specifically used the word renovation. That leads me to believe they are doing something much more involved and Monty may have seen it's last days as a simple shuttle loop....I still think they should just turn Jaguar into an Intamin Blitz. Keep the station and theming. You can even use pretty much the same foot print for the most part.

Or maybe the new giga will actually be Monte raised 300 ft. in the air. 

  • Haha 2
Link to comment
Share on other sites

14 hours ago, firebird81 said:

Why would  it take a year and a half to change over to LIMs and add new trains. That seems like a 90 day refurb at most. But they specifically used the word renovation. That leads me to believe they are doing something much more involved and Monty may have seen it's last days as a simple shuttle loop....I still think they should just turn Jaguar into an Intamin Blitz. Keep the station and theming. You can even use pretty much the same foot print for the most part.

I think Zoom is going to get more done to it then just a new launch and trains. Other shuttle loops needed track work done to them and they didnt have the cycles on them zoom has. 

any work at Knotts take time so no its not as you say 90 day refeb.... Zoom interacts with a lot of other rides that would need to get shut down for some of the work and you cant move/get construction stuff around if the park is open so a lot of the work is going to be done when the park isnt open.   

Link to comment
Share on other sites

On 1/11/2022 at 7:38 PM, firebird81 said:

Why would  it take a year and a half to change over to LIMs and add new trains. That seems like a 90 day refurb at most. But they specifically used the word renovation. That leads me to believe they are doing something much more involved and Monty may have seen it's last days as a simple shuttle loop....I still think they should just turn Jaguar into an Intamin Blitz. Keep the station and theming. You can even use pretty much the same foot print for the most part.

I don’t think you have any idea how complex converting the ride to a different launch system really would be. 6 months would be considered a fast turnaround…

you need a new train, new electrical system, new control system, structural modifications, training the crew again, getting state certification…

 

  • Like 2
Link to comment
Share on other sites

1 hour ago, Jew said:

I don’t think you have any idea how complex converting the ride to a different launch system really would be. 6 months would be considered a fast turnaround…

you need a new train, new electrical system, new control system, structural modifications, training the crew again, getting state certification…

 

You're right, I don't, which is why I asked. But they build entire coasters in that amount of time. They're not building a train onsite, so that wouldn't require shutting it down. I mean, Xcelerator was announced in December of 2001 and opened at the end of June in 2002....7 months later. Why would it take twice as long to just upgrade a shuttle coaster?

Link to comment
Share on other sites

14 minutes ago, firebird81 said:

Why would it take twice as long to just upgrade a shuttle coaster?

Just spitballin' here, but so many reasons, man.  So many.  One major thing might be the pandemic taking an extraordinary bite out of expected income. They might be spreading the project out so they don't have to worry about schedule conflicts, there's more than likely massive shipping delays for literally everything, labor issues with third-party companies, yadda yadda yadda. 

Xcelerator was built in a time where amusement parks were exploding in popularity and in constant competition with each other for a "World's First" title, of course they're gonna get it built as quickly as possible before anyone else can steal their thunder.  Giving a 44-year-old shuttle coaster a refurb isn't nearly on that level of giving a shit.

Basically, they're gonna do what they feel is the most financially-beneficial route for the park to succeed. If that means I can't go "whee" on a ride I've been on a thousand times already, well, I feel like that's not the end of the world.

Link to comment
Share on other sites

2 hours ago, KBrylczyk said:

Just spitballin' here, but so many reasons, man.  So many.  One major thing might be the pandemic taking an extraordinary bite out of expected income. They might be spreading the project out so they don't have to worry about schedule conflicts, there's more than likely massive shipping delays for literally everything, labor issues with third-party companies, yadda yadda yadda. 

Xcelerator was built in a time where amusement parks were exploding in popularity and in constant competition with each other for a "World's First" title, of course they're gonna get it built as quickly as possible before anyone else can steal their thunder.  Giving a 44-year-old shuttle coaster a refurb isn't nearly on that level of giving a shit.

Basically, they're gonna do what they feel is the most financially-beneficial route for the park to succeed. If that means I can't go "whee" on a ride I've been on a thousand times already, well, I feel like that's not the end of the world.

After I posted, I started thinking the same thing. It took forever to get that part for Hang Time last year. 

Link to comment
Share on other sites

1 hour ago, southpuddle said:

Same reason it takes a lot longer to refurbish a classic car instead of just building a brand new car at a factory. When you’re (presumably) keeping many of the original components extra care needs to be taken. 

Great analogy.  The engineering and re-building process is completely different.  It’s not “plug and play” like a new coaster.

As others have mentioned as well, supply chains are still messed up right now. Sourcing the components could be another factor for why the project is expected to take so long (remember, they’re not just buying the parts to open the ride, they have to buy spares too).

Or, hypothetically, if they are going to keep the flywheel launch but need a brand new one since the old one isn’t able to be repaired any longer, you’d be asking a manufacturer to build a one off of something that tooling has long since disappeared. 

Ultimately, there are lots of reasons why it could be scheduled for such a long downtime, but it’s certainly not unusual.
 

Link to comment
Share on other sites

Here's to hoping they keep the original style train as much as possible: nice flat-ish seat pad and straight-back chair posture, like Schwarzkopf and Intamin intended.  Not the atrocity train design Mind Bender got (and Revolution while I'm at it; but those are so much better than the previous messes). 

The ride and trains are essentially perfect - a rarity in the coaster world.  Knott's probably know how special that is.

Link to comment
Share on other sites

Hey guys.... I moved to San Diego last year from Philly and thinking of hitting up Knott's for the first time this Sunday 1/30. Been checking the website and it has listed Xcelerator as closed for the last week+ but I thought it just opened back up after the repaint? Does anyone know if it has been open? Also, is MR still open or did they close it down again for the refurb?

Thank you!

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/