Josh Linn 0 Posted May 19, 2010 Share Posted May 19, 2010 What a massive oversight on Intamin's part...how does something like that get through to construction without an engineer thinking "you know, maybe we should stick an extra support or two there"? You'd think they would learn their lesson after all the issues they've had in the past with under-supported rides (Xcelerator and Wicked Twister come to mind). Link to post Share on other sites
Skycoastin Steve 0 Posted May 19, 2010 Share Posted May 19, 2010 ^What I was told was Adena sorta screwed up the alignment. So it could once again be joint responsibility between the engineers and the people building it. I honestly wasn't told a whole bunch about it, but that was the general idea of what I was told. Link to post Share on other sites
HCLcoasters 0 Posted May 19, 2010 Share Posted May 19, 2010 Yeah, the good thing is that it doesn't really sway. Link to post Share on other sites
Capitalize 0 Posted May 19, 2010 Share Posted May 19, 2010 Man oh man, those trim brackets go all the way down the entire drop. That should slow things down a pretty good bit. Link to post Share on other sites
rcg19 0 Posted May 20, 2010 Share Posted May 20, 2010 (edited) Deleted by user Edited December 29, 2010 by rcg19 Link to post Share on other sites
netdvn 0 Posted May 20, 2010 Share Posted May 20, 2010 Is I305 really getting trims or is everybody jumping to conclusions again? Link to post Share on other sites
Yamez 0 Posted May 20, 2010 Share Posted May 20, 2010 No one can confirm nor deny the addition of trims yet. They have not been added yet, if at all. The only thing that is confirmed at the moment is the existence of new hardware on the drop, currently it is not affecting the ride's performance. Link to post Share on other sites
robbalvey 89 Posted May 20, 2010 Author Share Posted May 20, 2010 Is I305 really getting trims or is everybody jumping to conclusions again? Jumping to conclusions. It's very entertaining, actually... Link to post Share on other sites
Jness3 0 Posted May 20, 2010 Share Posted May 20, 2010 I really hope that they will wait until Memorial Day weekend is over until they do this. Let me ride I305 in it's full glory once, King Dominion, at least once! Link to post Share on other sites
Calripkenjr8 0 Posted May 20, 2010 Share Posted May 20, 2010 Here is a link to a photo with I305 with a crane next to the lift today. here Link to post Share on other sites
jray21 0 Posted May 20, 2010 Share Posted May 20, 2010 Jumping to conclusions. It's very entertaining, actually... Well, it did make Tom from Office Space some money! Link to post Share on other sites
rcg19 0 Posted May 20, 2010 Share Posted May 20, 2010 (edited) Deleted by user Edited December 29, 2010 by rcg19 Link to post Share on other sites
themeparkman25 0 Posted May 20, 2010 Share Posted May 20, 2010 (edited) Deleted by author Edited January 20, 2011 by themeparkman25 Link to post Share on other sites
rcg19 0 Posted May 20, 2010 Share Posted May 20, 2010 (edited) Deleted by user Edited December 29, 2010 by rcg19 Link to post Share on other sites
Capitalize 0 Posted May 20, 2010 Share Posted May 20, 2010 I could live with trims before the twisty elements as those were insanely intense, but I fear for the best or second best first drop I've been on... Link to post Share on other sites
pkdcoaster 2 Posted May 20, 2010 Share Posted May 20, 2010 Safe to say KD will get a new coaster this weekend The only good thing that could come out of this is they remove the trims from the 75ft hill. I wonder if there is gonna be a sale on all the merch. that says 90+ mph It was a fun 2 months while it lasted. JEFF Link to post Share on other sites
DarkStitch626 0 Posted May 20, 2010 Share Posted May 20, 2010 I know that one of the trains I believe Silverback has been having issues disengaging the lift recently. So perhaps they are looking at that? Link to post Share on other sites
Tbcoasterfan 0 Posted May 20, 2010 Share Posted May 20, 2010 Awe say it ain't so! Link to post Share on other sites
AnEscapeArtist 0 Posted May 20, 2010 Share Posted May 20, 2010 One things for sure, this definitely isn't Intamin's fault! Link to post Share on other sites
Capitalize 0 Posted May 20, 2010 Share Posted May 20, 2010 ^ How do you figure? Intamin fabricated and Adena constructed the ride about 2 months ago now. I really don't see how any issues the ride is already having is the fault of anyone else. Link to post Share on other sites
Homeboy23 0 Posted May 20, 2010 Share Posted May 20, 2010 People can freak out over nothing. That picture with the crane could have been taken anytime between January and March. When someone actually rides it and it slows down on the drop, then I will believe it. And even with that I will probably have to ride it my self. Link to post Share on other sites
Capitalize 0 Posted May 20, 2010 Share Posted May 20, 2010 What else can the brace added to the first drop be for, though? Link to post Share on other sites
Lady Gaga 0 Posted May 20, 2010 Share Posted May 20, 2010 I want to say, we should of known something like this was going to happen. I mean I've seen tons of people on here talking about black/greying out. I can only imagine the reactions of the GP after experiencing a blackout. Look what happened to Goliath at SFMM. Link to post Share on other sites
larrygator 7 Posted May 20, 2010 Share Posted May 20, 2010 Dale Earnhardt would be very disappointed. Can't they just add restrictor plates? Link to post Share on other sites
eddie200330 0 Posted May 20, 2010 Share Posted May 20, 2010 Dale Earnhardt would be very disappointed. Can't they just add restrictor plates? Best analogy so far!!!!! I am proud of you Larry...... Link to post Share on other sites
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now