Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

The Six Flags Magic Mountain (SFMM) Discussion Thread

Page 2205 - Opening Day Photo TR!

Recommended Posts

An aerial video (a la SFNE's test run of Wicked Cyclone) would've been great to see! Hopefully they'll run some test runs for the people at the construction tour tomorrow... so we can get some good video footage

Link to comment
Share on other sites

But wait the ride couldn't possibly be testing yet there is still weeks of prep work left to be done!!!!!!

 

Track completed April 18th. First cycle April 28th. Didn't exactly start testing over night.

Link to comment
Share on other sites

But wait the ride couldn't possibly be testing yet there is still weeks of prep work left to be done!!!!!!

 

Track completed April 18th. First cycle April 28th. Didn't exactly start testing over night.

I think that was meant to be a slight to SFMM's notorious track record of being behind schedule. Though, not this time. That fire might have helped shaved some time off construction

Link to comment
Share on other sites

I think that was meant to be a slight to SFMM's notorious track record of being behind schedule. Though, not this time. That fire might have helped shaved some time off construction

 

I think we can pretty much give all the credit to RMC on this one

Link to comment
Share on other sites

I also read a rumor on IG that the 4th train isn't happening, hopefully it's just a rumor

 

instagram is awesome. unless you heard it from the dippin dots guy, it's not legit.

 

anyway, i'll wait for pics and video of it going around the circuit. someone says it's run, other guy says no. lol

Link to comment
Share on other sites

I think the rumor is that there won't be a green train. I think they're 4 trains.

 

I really hope that is just that, a rumor.....the green train was going to be the best looking out of the 4, if they are going to omit one, it should've been the orange train, orange is already way overused in this park.

Link to comment
Share on other sites

I think the rumor is that there won't be a green train. I think they're 4 trains.

 

I really hope that is just that, a rumor.....the green train was going to be the best looking out of the 4, if they are going to omit one, it should've been the orange train, orange is already way overused in this park.

 

If they go with 3 trains, then they'll never duel since you know one will always be out for maintenance.

Link to comment
Share on other sites

But wait the ride couldn't possibly be testing yet there is still weeks of prep work left to be done!!!!!!

 

Track completed April 18th. First cycle April 28th. Didn't exactly start testing over night.

I think that was meant to be a slight to SFMM's notorious track record of being behind schedule. Though, not this time. That fire might have helped shaved some time off construction

 

Nah I meant to point out those that still doubted TC would test even after Cyclone did yesterday. Both coasters completed track work within a day of each other, why wouldn't they test around the same time?

Link to comment
Share on other sites

Glad to see it is testing. Always a mix on how long it's going to take. Deja Vu had the track done for months before the first train cycled.

Yeah but that's because they had a lot of problems with it, I remember everyone calling it "delay ja vu" back in '01

Link to comment
Share on other sites

Apparently they did 2 cycles of TC today. Mysteriously, no photo or video of it on the track (minus the lift hill) exists. That means there was a 6-8 minutes timeframe that someone could've snapped something

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/