Universal Orlando just built Transformers in a year. That's all the proof you need to know about what proper project management can do.

 

Magic Mountain deserves no praise for how this project has been handled so far. If you can't accept the fact they've botched the construction timetable (for whatever the reason may be), perhaps it is you who should take a walk off a short pier.

 

 

 

Yep.

 

 

Just look at the Superman conversion as a testament on how bad this park is managed. They knew that Superman was going to have a drop tower attached to it when they turned the ride around backwards. Instead of making the appropriate modifications to the ride while it was down for its conversion, they end up closing the ride less than 8 months after the backwards version opened and the ride remained closed another 6 months for Lex Luthor to be installed.

Edited by Top Thrill Dragster
Link to comment
Share on other sites

There could be other logistics in play here causing the delay such as revamping the surrounding area and shops, or they could just be lagging for whatever reason. Doesn't really matter anyway, its already delayed and there is no changing that.

 

I do think its a little ironic that a ride as short as this is taking this long but I don't build coasters so I can only comment on what I see.

 

I am going down there in two weeks and was hoping it would be open by then but since its not and there's nothing I can say or do to change that there is no point in bashing the park, as it seems to make no difference. I'll just have to wait till its finally open to ride it.

Link to comment
Share on other sites

They already finished the track work quite some time ago. Its the fact that the park has no push or urgency to wire this bad boy up and get it rolling for the public! Yes you always have set backs but it shouldn't be that difficult to get this up and running.

 

Hell they could call me up or any of you, to dig a hole and put a tree in ,so we cant blame it on a huge lot of dirt taking for ever.

 

Just get a sense of urgency

Link to comment
Share on other sites

Log Jammer closed on Oct 31, 2011. That's almost 2 years now. The site sat there, empty for close to a year.

 

By Feb 5, 2012 Log Jammer was totally gone. They didn't start clearing the trees, taking down the buildings and digging holes for Full Throttle until around November 20, 2012. That's 9 months that the site just sat there ... empty. Even IF the crew couldn't get over there until after LL:DOD opened that still would have been 4 months between the opening of LL:DOD and when they actually started.

IMG_9044.thumb.JPG.e31bb748dfb60372e78413eb03bf9ab9.JPG

2/5/12

IMG_1228.thumb.JPG.0ce477f9a8ad388bcada0b63c76f0898.JPG

11/20/12

Link to comment
Share on other sites

Universal Orlando just built Transformers in a year. That's all the proof you need to know about what proper project management can do.

 

Magic Mountain deserves no praise for how this project has been handled so far. If you can't accept the fact they've botched the construction timetable (for whatever the reason may be), perhaps it is you who should take a walk off a short pier.

 

i'm not praising MM, yes they are milking this build and the park management needs to be looked at for the lackluster job they are doing. Sorry, i'm Just upset that all of us talk and talk. The ride is built and landscapping is being done. PLease let's just sit back and wait for the finish product. Thank you, for responding. Have a Fabu day!

Link to comment
Share on other sites

Universal Orlando just built Transformers in a year. That's all the proof you need to know about what proper project management can do.

 

Magic Mountain deserves no praise for how this project has been handled so far. If you can't accept the fact they've botched the construction timetable (for whatever the reason may be), perhaps it is you who should take a walk off a short pier.

 

i'm not praising MM, yes they are milking this build and the park management needs to be looked at for the lackluster job they are doing. Sorry, i'm Just upset that all of us talk and talk. The ride is built and landscapping is being done. PLease let's just sit back and wait for the finish product. Thank you, for responding. Have a Fabu day!

 

I don't think anyone is blaming the workers. They are doing a great job. Yes Lex Luther took longer then expected so they put everything into that first. But still it was poor planning as it was already pointed out. They started this projects months after Lex Luther was already opened.

Link to comment
Share on other sites

Let's keep in mind that the park doesn't have a full offseason to do construction work. They have to manage all of their normal operations and also keep working on the refurbishment schedules of all of their other coasters. As long as the ride delivers when it opens, I don't care too much right now about their construction time.

Link to comment
Share on other sites

Let's keep in mind that the park doesn't have a full offseason to do construction work. They have to manage all of their normal operations and also keep working on the refurbishment schedules of all of their other coasters. As long as the ride delivers when it opens, I don't care too much right now about their construction time.

 

Extreme weather (snow @ Cedar Point) or no off season at all (like Universal Orlando) didn't stop them from getting projects open on time.

 

It can be spun a million different ways...but there's absolutely no question SFMM's management has consistently failed when it comes to getting rides open by the start of the summer season. Whether that is by design to save money, or just bad planning, I really don't know.

Link to comment
Share on other sites

 

Extreme weather (snow @ Cedar Point) or no off season at all (like Universal Orlando) didn't stop them from getting projects open on time.

 

There is no argument with that sentence. If these other major parks can do it why not MM?

Link to comment
Share on other sites

^^ Exactly. This isn't the first time this has happened in recent memory. Green Lantern opened on 7/1, LL:DOD opened just before July 4th. Even Road Runner Express was delayed for over a year.

 

If you look back on opening dates for the park, it's only been over the past few years that they've not been open prior to Memorial Day or even Spring Break.

 

According to RCDB:

Apocalypse: 5/23/09

Batman: 3/26/94

Goliath: 2/11/00

Ninja: 5/21/88

Riddlers: 4/4/98

Scream: 4/12/03

Superman: 3/15/97 (even the reopening at S:EFK was in Feb)

Tatsu: 5/13/06

Viper: 4/7/90

 

And then you have the last 3 now in late June/early July (at least). Obviously something is going on.

Link to comment
Share on other sites

 

Extreme weather (snow @ Cedar Point) or no off season at all (like Universal Orlando) didn't stop them from getting projects open on time.

 

There is no argument with that sentence. If these other major parks can do it why not MM?

Exactly, they have generally nice weather to build with and its taking so long!

Link to comment
Share on other sites

It could be worse. They could have contracted Caltrans to build the ride. Disclaimer: You'd have to have spent some time on California highways to get that one.

 

...And there's always Caltrans for the win! If anyone takes longer than Caltrans does, God help us all!

 

I honestly haven't been following construction of the ride very closely, but has there been any hint as to the effects that may or may not occur in the tunnel? I'm looking forward to whatever they have in store there.

Link to comment
Share on other sites

It could be worse. They could have contracted Caltrans to build the ride. Disclaimer: You'd have to have spent some time on California highways to get that one.

 

...And there's always Caltrans for the win! If anyone takes longer than Caltrans does, God help us all!

 

I honestly haven't been following construction of the ride very closely, but has there been any hint as to the effects that may or may not occur in the tunnel? I'm looking forward to whatever they have in store there.

 

 

That would be city/state projects... Anything contracted by the city/state (for example classrooms at my community college) they were suppose to be completed in 2011. Its 2013 and they have been sitting there unfinished for a year. They "said" they fired the contractors, but I dont buy that

Edited by bostonlva
Link to comment
Share on other sites

It could be worse. They could have contracted Caltrans to build the ride. Disclaimer: You'd have to have spent some time on California highways to get that one.

Wait, so this is the California Department of Transportation looking to get into amusement rides?

Link to comment
Share on other sites

It could be worse. They could have contracted Caltrans to build the ride. Disclaimer: You'd have to have spent some time on California highways to get that one.

 

...And there's always Caltrans for the win! If anyone takes longer than Caltrans does, God help us all!

 

I honestly haven't been following construction of the ride very closely, but has there been any hint as to the effects that may or may not occur in the tunnel? I'm looking forward to whatever they have in store there.

 

 

that would be city/state projects... anything contracted by the city/state (for example classrooms at my community college were suppose to be completed in 2011, they are not, and they have been sitting their unfinished for a year

 

I can tell. Let me guess... Your English, spelling, grammar, and punctuation classes, would have been held in those classrooms, right?

 

It could be worse. They could have contracted Caltrans to build the ride. Disclaimer: You'd have to have spent some time on California highways to get that one.

Wait, so this is the California Department of Transportation looking to get into amusement rides?

 

- facepalm -

Link to comment
Share on other sites

More photos for Full Throttle and some things from around the park

 

I know its only been a couple days since the last update but I thought I would share some more photos from yesterday and today.

2079406284_IMG_7330_Snapseed(Copy).jpg.59e58a38691170756532bea93c1ca1b7.jpg

Not much has changed but some minor things to point out about Full Throttle

386644015_IMG_7327_Snapseed(Copy).jpg.52c17d806207aebfa235a60f1a1a568c.jpg

The first car is now loaded with some water dummies, full testing should start very soon

1813319123_IMG_7475_Snapseed(Copy).jpg.a6b79a0db77785103e3a0f6ac0fe041b.jpg

The back of the old Log Jammer queue building is now painted white and some scaffolding is starting to be removed I'm curious to see if the wall will stay white or if some detailing will be applied later

1551283497_IMG_7481_Snapseed(Copy).jpg.9c63b696ea63d825b01a4fd076ee594d.jpg

The exit ramp is almost finished

89171781_IMG_7326_Snapseed(Copy).jpg.633d41dc4929ee1d8261d95ddccc2977.jpg

Switch backs prior to the entrance ramp, you'll enter / exit under the loop and launch track

300566407_IMG_7474_Snapseed(Copy).jpg.5b35f50aef8aa8128c40b0d6588aaa9f.jpg

1465317129_IMG_7235(Copy).thumb.JPG.a4a3dd692872cbe75cdeb2e24874f525.JPG

1330058950_IMG_7236(Copy).thumb.JPG.3854c202aefcd051a7240abae1565c6e.JPG

1315038204_IMG_7341_Snapseed(Copy).jpg.ffc35e5f7b46e33266874ebc1315d8de.jpg

From the Sky Tower you can see some trees planted on the hillside

1313624119_IMG_7473_Snapseed(Copy).jpg.269d932986e9fe02e9acdd7d706b92bc.jpg

More landscaping

1782158027_IMG_7468_Snapseed(Copy).jpg.9a26415bb145fe2de16b325ae93457b9.jpg

184310385_IMG_7437_Snapseed(Copy).thumb.jpg.eec0ec4ebe26de39519465bf73ce1b8c.jpg

460890008_IMG_7439_Snapseed(Copy).jpg.b25d4d6c0e5953906c755b8eb62f7a58.jpg

1726840443_IMG_7566_Snapseed(Copy).jpg.f10f0c0872bab56ad6f5fb2d55dc9449.jpg

The trains look very nice I especially like the silver, blue, and red wheels

1245749826_IMG_7441_Snapseed(Copy).jpg.6bb2233822b6ac18facd3ee171057a86.jpg

368669717_IMG_7591_Snapseed(Copy).jpg.ea313f58ddae14db4f19de890b0b4517.jpg

1643363831_IMG_7425_Snapseed(Copy).thumb.jpg.50b0541bc991f2611041b6ef7fa8326f.jpg

1459081081_IMG_7361_Snapseed(Copy).thumb.jpg.b0c747692a9183a8e56e98bdcf647c6b.jpg

top hat / drop off the loop

1370151057_2ndturn(Copy).thumb.jpg.f6a68df3b63f8107bc2e297cc4c09c0b.jpg

Brakes

290410097_IMG_7606_Snapseed(Copy).thumb.jpg.9f146e6a9092dcd693be127a1af0eba1.jpg

Almost vertical

232897677_IMG_6339(Copy).JPG.e427d84eb0ecb52f0aebde72d21e3186.JPG

Moving on from Full Throttle this is how the fountain looked a day ago now..

1402759732_IMG_7359(Copy).JPG.c8726a6fb91d5e6e91da87933a93d812.JPG

All the fountains are back up and running

117026816_IMG_7454(Copy).JPG.fdaf251d9f830f66e64483b4cf7cc02e.JPG

1318204347_IMG_7455(Copy).thumb.JPG.c55156e787f26433dae2a61f34540b28.JPG

The waterfall in the background was also back up and running

446652898_IMG_5607(Copy).thumb.JPG.f4b28b470518e43d45ade047ef22d066.JPG

Daffy Duck

1663196025_IMG_5608(Copy).JPG.5476862c6ead2042733f00a701b58458.JPG

Advertisement overload

1661654933_IMG_7287(Copy).thumb.JPG.ea51c0a119501c16d7d503ecfe86815a.JPG

Still running one train

470838814_IMG_7301(Copy).JPG.681c92dcbada3072f50f95a01c5d116c.JPG

No comment

1915309972_IMG_6290-1(Copy).jpg.c00eba326528fc0a18b9ec69f048ce6b.jpg

This is the result of 10 years in the Sun

1262125349_photo(Copy).JPG.4f164760299308deaec56107967d1a2e.JPG

If only it could look this good! (at least the parking spots faded too)

1683725270_IMG_6796(Copy).thumb.JPG.a42653c53420157e3806effa80bb3fd2.JPG

The events been running for the past few weeks and continues through the middle of June

254435209_IMG_7302(Copy).JPG.c5ea30cbc32325cc359703e0d46f1900.JPG

Stage in front of DC Universe

1877890006_IMG_7303(Copy).JPG.f1355f2722cb2c8376b7bca083abc3d9.JPG

Lighting equitment

919109775_IMG_7376(Copy).JPG.8194babd025835ba4900ce1683d4dd78.JPG

New flowers for Batman

2088026764_IMG_7372(Copy).thumb.JPG.7ee3d71b67c05545c534dc40c1657a86.JPG

Maybe one day Batman could run as Namtab

1098274907_IMG_6437-1(Copy).thumb.jpg.b68e012892542495709ef5775881e888.jpg

309912495_IMG_7396(Copy).thumb.JPG.fe27e177cd0f55da77c106b1015aa891.JPG

The left side seems to consistently go higher than the right side

296811792_IMG_7309(Copy).thumb.JPG.aa6c9f1da882e73956a22452972f1944.JPG

At least they have signs to tell you if the ride closes early (the sign was not supposed to be there but no one had removed last night)

433804688_IMG_7516(Copy).thumb.JPG.023eba8c1c877b3a9d337cfde2dfb627.JPG

Superman

446792169_IMG_5718(Copy).JPG.b72f4261fa96982c3f8a5a22379e26ad.JPG

Continuing the Superman trend, Superman and Lex Luther bus

705890692_IMG_5720(Copy).JPG.56e5e124e23b1a09010cb4fedff53592.JPG

1009814739_IMG_5721(Copy).thumb.JPG.bb3e343eeaecb28a09b6b90b62321fc9.JPG

1590384306_IMG_4131(Copy).JPG.91243aae081bb9037333b409889da312.JPG

Other ad warped buses include X-2

820310627_IMG_5697(Copy).JPG.2a3f389ab3c9274aea015192392e0898.JPG

Goliath

2068951918_IMG_4110(Copy).JPG.af1e4f112b0751a214f488562c53c783.JPG

Tatsu

IMG_3153.thumb.JPG.b7f344f39ecd4d4499e0b86dfc2b58ab.JPG

And Yolo bus - the 6th bus to complete the fleet is Viper but I haven't seen that one run yet

1880552086_IMG_5946(Copy).JPG.e1385b5b0bcf2fdf965f92223fb609ba.JPG

x-2's second train in for refurbishment (this photo was one I took about a week or 2 ago but the train is still in refurbishment its just sitting on a different section of track now)

1657421712_20130519_091034_1(Copy).jpg.7a8872b86755dd0a8ef99333c10d756b.jpg

Train 3 and 1 are currently running and after ridding both, train 3 has a lot less violent shaking in the final raven turn. Hopefully when train 2 returns the ride will be slightly less violent.

1435348600_IMG_6521(Copy).JPG.ecfab76d999151d129e3152f061dfc96.JPG

327110066_IMG_7263(Copy).JPG.cba3e35b97bcd7468d5c8ee47eaa30f8.JPG

Apocalypse is back to 2 trains but for some reason train 1 is extremely bumpy and has a lot of vibration the ride was pretty painful. Couldn't tell you if train 2 was the same didn't get a chance to ride in that train. In all honesty my ride on Colossus was smother than Apocalypse. Maybe it was the day or the heat but the ride was definitely rougher than usual results may very. I'm curious to know if any one else has noticed the ride becoming progressively rougher.

1507926509_IMG_7270_Snapseed(Copy).thumb.jpg.72bf233c280dbe4f21d49840aa813a11.jpg

Fire

1967409631_IMG_7338_Snapseed(Copy).jpg.92ca5f67be8d741d1d562bcc8d7083e0.jpg

Speaking of fire one happened to be put out right behind Apocalypse

144419332_IMG_7403(Copy).JPG.7ec936dcbefdc0bdd60e5c476c144aaf.JPG

Thanks for reading!

Edited by RollerCoasterAwesome
Link to comment
Share on other sites

It could be worse. They could have contracted Caltrans to build the ride. Disclaimer: You'd have to have spent some time on California highways to get that one.

Our tax dollars at work.

 

Link to comment
Share on other sites

It could be worse. They could have contracted Caltrans to build the ride. Disclaimer: You'd have to have spent some time on California highways to get that one.

 

They really are the worst!

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/