Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

Snicket

Members
  • Posts

    82
  • Joined

  • Last visited

Snicket's Achievements

Enthusiast

Enthusiast (6/14)

  • First Post
  • Collaborator
  • Week One Done
  • One Month Later
  • One Year In

Recent Badges

0

Reputation

  1. You stayed at the Holiday Inn. We were at the hotel next to it. Not the same hotel as you. We actually knew that the Holiday Inn was under construction and it was one of our deciding factors NOT to stay there! --Robb Lucky you... They didn't care to tell us that they were doing construction when we booked our reservations.
  2. Awesome! This brought back so many memories of my high school jazz band trip to LA in April...same hotel and everything. Our trip was really ghetto, the hotel was undergoing some remodeling so it was covered in scaffolding and constantly under construction. The only places to eat really close by was the shady-looking McDonalds or the even shady-er looking Taco Bell/Pizza Hut next to the adult superstore with homeless people sleeping outside. We were harassed by a homeless guy in McDonalds one night...it was weird and scary. The management told us not to worry...apparently he shows up every night and is quite friendly. We made the mistake of going to Hollywood at night. We saw Jack Sparrow, a guy in a Barney suit, Wolverine, a guy in a purple bra, and a Jimi Hendrix impersonator. We were also harassed by a group of legalize marijuana supporters (To which my friend said "It smells like it's already legal around here"). Good times... And the theme parks were good too.
  3. There are many conflicting reports on roughness. Only three trains have undergone appropriate testing. The testing of the other two trains have been taking place under the cover of night without LEDs turned on. When only two trains were available yesterday and today, they were switching out the trains for the third that was in the garage most of the time. Several adjustments were made yesterday and today to a particular train that could have affected one's ride as being smooth or rough.
  4. They are hoping to run at least three trains with the moving sidewalk for a brief period of time between 6:00-7:00 if everything falls in place like hoped for soft openings tonight. EDIT: All walls are down. Three trains are in the station ready to go; a fourth train could be added soon. Wait time is 5 hours.
  5. Here's a detailed review of Hollywood Rip, Ride, Rockit! from Chris at OrlandoUnited.com: I was able to talk to a worker - due to technical problems and the fact that the employees are only mid-way through the training, the conveyor belt has been turned off and only two to four trains are running. In a few weeks, employees will be better trained to load passengers quickly and safely using the conveyor system. The lack of music on some people's rides are glitches that will be resolved. There are several more technical issues that I won't go into now since they've probably already been resolved as of this morning. There are currently no major setbacks.
  6. The coaster resumed testing a little earlier without any lights. A car is stopped on the final brake run.
  7. I take back what I said about the floorboards. I've been told that the (Fiberglass, I think?) areas around the LEDs in the front and back of a particular train did crack at the end of last month. The fractures were small and were in parts of the train that would not have caused any dangers to riders. The trains have been repaired and a "fix" (What exactly they meant by this, I don't know) has been engineered and placed on all of the trains. I've been told that the queue has been given its finishing touches and cleanings yesterday and painting is wrapping up on the lift and areas in the station. The only persistent problem seems to be a faulty piece of mechanics on the final break run that will be replaced or has been replaced.
  8. -The banner is not up as reported earlier -The only problem I am familiar with right now are the problems with the break runs malfunctioning. I won't doubt that the floorboards have cracked on the train(s), but it is extremely hard to believe considering the floorboards are steel. Steel can crack, but that's a lot of stress. The LED and sound systems on Rockit! are very lightweight considering other options available. If the floorboard(s) have cracked on any of the trains, then it is the fault of the manufacturer and not Universal. It is highly unlikely that the X Car is having any problems considering the fact that it has been used on other coaster with equivalency of the uniqueness of Rockit!.
  9. There were two cranes on site today and a lot of "work" going on. By "work", I mean a lot of busy construction workers running around in a group. I've been told that Monsters in the Morning will not be riding Hollywood Rip, Ride, Rockit! tomorrow, but they've been allowed backstage to learn more about the workings of the coaster. Another radio station owned by the same people who own Monsters in the Morning have updated their website reporting that they will be at the park to learn about Hollywood Rip, Ride, Rockit! on the 25th. Weather or not they will get to ride it, nobody knows. As far as I know, a special event is still planned for the music plaza tomorrow...but it will be in use for a corporate event. While that sounds strange to me...it's still what I've been told. The rings will not take long to go up...whenever they go up. It will take less than half a day. We can see soft openings and look out for an official opening date as soon as the rings go up...soon.
  10. Exactly what I have heard from people there. Thanks! Can't wait for the pictures. Update: The ride has been continuously running today. Somebody has also told me that a few people...not guests, though...were riding it today.
  11. A crane and a large group of workers are there this morning around the station and lift. They may be finally getting some of the last touches started on and maybe finished today. Yesterday, they finally finished painting the lift.
  12. News: There will be a special event taking place in the Music Plaza on July 22nd. Various members of the media have been contacted over the past three weeks to show up at the event. This is assumed to be involved with Hollywood Rip, Ride, Rockit!, but maybe not necessarily its opening.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/