Hey Guys

 

I've just finished my other K'nex ride called Turbulence and uploaded the Video of it today, but this ride is already history, because I've now started to rebuild Hansa Park's (der Schwur des) Kärnan. I haven't installed any track yet, but the tower has already reached it's maximum height of 4ft. Because I now have 2 weeks of holidays this coaster should be completed soon.

 

Now a few photos:

image.thumb.jpeg.db9f67806a4b9aa10e36b69f377b0c5c.jpeg

Piece by piece, the tower is growing

image.thumb.jpeg.19abaadf1edd63077e6c04d01a904abf.jpeg

And done

image.thumb.jpeg.c20e441cc87ab71dfdb656b5b11c392e.jpeg

Some base structure. The next things will be the station (behind-) and the heart-element (before the tower)

Edited by K1ngdaKa88
Link to comment
Share on other sites

  • Replies 19
  • Created
  • Last Reply

Top Posters In This Topic

This evening I've made the base for the station and put in some track in the station, the pre-lift part and the lifthill. The lifthill is now completed and working. Also the backwards freefall works well too.

 

Now some pics:

image.thumb.jpeg.06cd4518eed37055ef2ec9f0c6356342.jpeg

Some track in the station

image.thumb.jpeg.da3067c52684f6299137da4b700eb0e0.jpeg

And the lifthill done

image.thumb.jpeg.449d9a6cbaf92113671f3af022324b0c.jpeg

image.thumb.jpeg.9edc51431f95307780af41c24a0df0ef.jpeg

image.thumb.jpeg.a1a3e7c0e3e12d106d15e87d4ad1495d.jpeg

Freefall mechanism, which is hand-powered

Link to comment
Share on other sites

I've continued working on it and the heart-element is now almost completed. But, there is a BIG problem! I'm almost out of blue rods and I still need a lot of them for the rest of the layout! So that means I need to order some more and wait till they arrive here, what probably won't be happening till after my holidays...

Anyway, I don't just have some photos for you, also a test run video:

 

[youtu_be]

[/youtu_be]

 

And also some photos:

image.thumb.jpeg.3308a0a3dd6fa1b08a80f5b501c67bf1.jpeg

Heart element half way done

image.thumb.jpeg.ef2da11345f1c61690de1e24dac3a031.jpeg

And almost done

image.thumb.jpeg.10c6dc6b722b20e38d9e99909ec6a79c.jpeg

image.thumb.jpeg.ce76acee9797c8e6b866bd48d7cd18f9.jpeg

Link to comment
Share on other sites

So, the new set arrived on Tuesday, but I didn't had a lot ot time to continue, due I wasn't at home. Tomorrow I'm also not at home, but over the weekend I should have a lot of time!

In case of constructing, I've enlarged the base and added a curve.

 

Now two pics:

image.thumb.jpeg.8651594a384d533e899ef4dcc1fa3cb6.jpeg

image.thumb.jpeg.3e8953f9495b2a9ac5f1e91d0428d435.jpeg

Link to comment
Share on other sites

So, I'm now almost finished with the airtime hill, so I've done that, the s-turn and the following 180 degree turn. Additionally I've moved the 2nd booster, otherwise the speed wouldn't be enough, even with the 3rd booster.

 

Now a few photos:

image.thumb.jpeg.c86184a28f3e87d606b7fd278714f7d3.jpeg

image.thumb.jpeg.bc9b5d57e7d3a197a55e9de1d47b0b6f.jpeg

Link to comment
Share on other sites

  • 3 weeks later...

Haven't been doing a lot the last few weeks due school and over easter I wasn't at home, but I have finished trackwork! But I still have to do some more supporting to the tracks, that the track is stronger and the car can make it thru the layout...

 

A few photos:

image.thumb.jpeg.81b172595f64763da8ef543ea55b8696.jpeg

image.thumb.jpeg.1f3e3b7689358c78797a085dffd68d91.jpeg

Link to comment
Share on other sites

  • 4 weeks later...

After a long time again an update!

Sorry that I didn't made any updates, but school was very busy the last few weeks.

Due the 3 car train didn't run that well, I went back to the 2 car train and it runns well, except the reverse freefall on the lift, there I need to do something.

While I was testing, there occured an ACCIDENT!! Well the front left wheel assembly of the back car derailed, because the track was crushed due it was a small curve which I made with straight track and the booster crushed it too. I've now replaced the straight track with a curved track, and it works now but doesn't looks so great

 

I'll probably film it this weekend and then the Video should come soon..

 

And now 3 photos

image.thumb.jpeg.156dfe112b2cbec55124aeeabced6212.jpeg

The derailed car

image.thumb.jpeg.fc8be2ece0ca6224456591b672652fc4.jpeg

How far the track has been crushed

image.thumb.jpeg.79d25f171713f2f1d3726d03d7bb305c.jpeg

And the new curced track in place

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.

×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/