Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

[RCT3] Surfside Gardens--Announcement!


Recommended Posts

Hello, this is Jerry Watson, CEO of GPD parks, and I am here to announce our brand new park, Surfside Gardens. This 250 acre park will house two roller coasters, a record-breaking water ride, a Paratrooper tower, and a set of bumper cars in its opening season. This being GPD Parks' first park, be ready for tons of expansion! We already have plans for next year. Some concept art has been created for how the unfinished park will look. Without further ado, the pictures!

 

Here is our first roller coaster, a Intamin dueling wooden coaster titled "Dueling Eagles". It will stand 100 feet over the park, and reach speeds of up to 55 MPH! Featuring two double downs, 30 seconds of "air time", and a mechanically synced ride operation panel, this coaster will stand above all others! Dueling Eagles has a track length of 3,800 feet and will have a ride time of 1:30 seconds:

 

Our last roller coaster is Predator, a Philadelphia Toboggan Company twister wooden roller coaster with 3,174 feet of track and speeds exceeding 55 MPH. It will stand at its highest point 125 feet off the ground. This is a test model for Philadelphia Toboggan Company, and is expected to be a major draw to the park:

 

Next is our paratrooper tower, aptly named "Paratrooper". It will be the taller than any other paratrooper ride, towering 240 feet over the ground below. It will be manufactured with twelve chutes, and feature a newly designed and enhanced operation panel:

 

We have our water ride, SplashDown up next. This ride is a prototype from Arrow Dynamics for its new style of water ride. It has the world's tallest water ride drop at 85 feet and a ride time of 1 minute 25 seconds. Riders are sure to get soaked on this ride and it will be a relief from the hot Miami heat:

 

We have bumper cars called Dodgems which are located next to Predator:

 

Here is our midway, with the uses of the buildings yet to be decided on:

 

I will leave you with Surfside Gardens' logo:

 

 

That is all I have for you today, and I hope to see you on May 29, 1984, which is opening day!. Criticism and comments are welcome.

Link to comment
Share on other sites

  • Replies 7
  • Created
  • Last Reply

Top Posters In This Topic

  • 1 year later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.

×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/