It's just ridiculous.
Only 2024 to build a new main attraction.
The park would need the attraction already 2020.
Other parks would build in time 2-3 main attractions.
But typical of Disneyland Paris.. Lame as a slug.
The maximum waiting time i accept is 30 minutes. If i have to wait more than 30 minutes for a ride i want my money back. I don't pay for waiting in a queue line. I pay for riding rides.
This is not correct.
The coaster for Etnaland is completely build and just waits for opening in 2013.
Mack is not a contender for top thrilling coaster manufacturer and i don't see them to go that way.
Mack has some more projects:
Manta at SeaWorld SanDiego (2012)
Project Helix at Lisberg (2014)
The Storm at Etnaland (2013)
Project Sochi (Russia) (2013?)
Megacoaster at Nigloland (2013)
BlueFire at IMG Theme Park (Dubai) (2013)
Europa is in summer and holiday time at least a three day park!
Just think at the 10 rollercoaster and an average waiting time of 45 minutes then it takes 7.5 hours only for the rollercoasters.
And there are so many more attractions ...
The ride time starting from the top of the lifthill to the break must be at ~40 seconds.
Otherwise it will be impossible to have a throughput of 2000 pph.